User contributions
(Latest | Earliest) View (newer 500 | older 500) (20 | 50 | 100 | 250 | 500)
- 06:24, 18 November 2011 (diff | hist) Restrictive covenant
- 06:19, 18 November 2011 (diff | hist) Editorial policy
- 17:28, 17 November 2011 (diff | hist) Editorial policy
- 17:24, 17 November 2011 (diff | hist) Provisional sum
- 17:23, 17 November 2011 (diff | hist) Provisional sum
- 17:20, 17 November 2011 (diff | hist) Project sponsor for building design and construction
- 17:17, 17 November 2011 (diff | hist) Project manager
- 17:13, 17 November 2011 (diff | hist) Project handbook
- 17:08, 17 November 2011 (diff | hist) Project execution plan PEP
- 17:01, 17 November 2011 (diff | hist) Project brief for design and construction
- 16:50, 17 November 2011 (diff | hist) Project board for building design and construction
- 12:11, 17 November 2011 (diff | hist) Programme for building design and construction
- 12:06, 17 November 2011 (diff | hist) CDM planning period
- 12:04, 17 November 2011 (diff | hist) N CDM planning period (Created page with "CDM planning periods are now a requirement of the CDM regulations, intended to allow contractors sufficient time to assess health and safety issues and plan their ...")
- 11:57, 17 November 2011 (diff | hist) Production information report for design and construction
- 11:56, 17 November 2011 (diff | hist) Production information report for design and construction
- 11:32, 17 November 2011 (diff | hist) Production information
- 11:23, 17 November 2011 (diff | hist) Procurement route
- 10:56, 17 November 2011 (diff | hist) Pre-tender interview
- 10:55, 17 November 2011 (diff | hist) Mid-tender interview for construction contract
- 10:53, 17 November 2011 (diff | hist) Mid-tender interview for construction contract
- 10:53, 17 November 2011 (diff | hist) m Mid-tender interview for construction contract (moved Mid-tender interviews to Mid-tender interview)
- 10:46, 17 November 2011 (diff | hist) Pre-tender estimate for contracts
- 10:43, 17 November 2011 (diff | hist) Pre-qualification questionnaire PQQ for construction contracts
- 10:31, 17 November 2011 (diff | hist) Private finance initiative
- 10:29, 17 November 2011 (diff | hist) Private finance initiative
- 17:26, 16 November 2011 (diff | hist) Appointing consultants for building design and construction
- 15:25, 16 November 2011 (diff | hist) CDM 2007 principal contractor
- 15:19, 16 November 2011 (diff | hist) Prime cost sum
- 15:15, 16 November 2011 (diff | hist) Preliminary business case for construction project
- 15:09, 16 November 2011 (diff | hist) Pre-construction information
- 15:09, 16 November 2011 (diff | hist) Pre-construction information
- 14:32, 16 November 2011 (diff | hist) Practical completion
- 14:23, 16 November 2011 (diff | hist) Possession of the site by the contractor
- 14:18, 16 November 2011 (diff | hist) Party Wall Act
- 14:03, 16 November 2011 (diff | hist) Planning obligation
- 13:57, 16 November 2011 (diff | hist) Planning permission
- 13:43, 16 November 2011 (diff | hist) Planning condition
- 13:42, 16 November 2011 (diff | hist) Planning condition
- 13:41, 16 November 2011 (diff | hist) Planning condition
- 13:38, 16 November 2011 (diff | hist) Planning fee
- 13:37, 16 November 2011 (diff | hist) Planning fee
- 13:32, 16 November 2011 (diff | hist) Planning appeal
- 13:26, 16 November 2011 (diff | hist) Performance specification
- 13:14, 16 November 2011 (diff | hist) Partial possession of the site by the client
- 13:04, 16 November 2011 (diff | hist) Appointing consultants for building design and construction
- 13:03, 16 November 2011 (diff | hist) Specification for construction
- 13:00, 16 November 2011 (diff | hist) Appointing consultants for building design and construction
- 11:55, 16 November 2011 (diff | hist) Design and build: occupation and defects liability period
- 11:53, 16 November 2011 (diff | hist) Design and build: occupation and defects liability period
- 11:46, 16 November 2011 (diff | hist) Design and build: construction
- 11:35, 16 November 2011 (diff | hist) Traditional contract: mobilisation
- 11:35, 16 November 2011 (diff | hist) Design and build: mobilisation
- 11:29, 16 November 2011 (diff | hist) Design and build: tender
- 11:21, 16 November 2011 (diff | hist) Design and build: tender
- 10:48, 16 November 2011 (diff | hist) Design and build: tender
- 10:33, 16 November 2011 (diff | hist) Design and build: post occupancy evaluation
- 10:21, 16 November 2011 (diff | hist) Design and build: occupation and defects liability period
- 10:05, 16 November 2011 (diff | hist) Output-based specification
- 09:55, 16 November 2011 (diff | hist) Outline specification
- 09:52, 16 November 2011 (diff | hist) Outline planning application
- 09:51, 16 November 2011 (diff | hist) Outline planning application
- 09:40, 16 November 2011 (diff | hist) Options review report
- 08:42, 16 November 2011 (diff | hist) OJEU procurement procedures
- 08:34, 16 November 2011 (diff | hist) OGC decision point 2
- 07:01, 16 November 2011 (diff | hist) OGC decision point 1
- 06:54, 16 November 2011 (diff | hist) OGC gateway review 5
- 06:49, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:45, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:44, 16 November 2011 (diff | hist) OGC gateway review 4
- 06:43, 16 November 2011 (diff | hist) OGC gateway review 4
- 06:33, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:33, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:32, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:30, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:23, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:21, 16 November 2011 (diff | hist) OGC gateway review 3
- 06:19, 16 November 2011 (diff | hist) OGC gateway review 2
- 06:15, 16 November 2011 (diff | hist) OGC gateway review 0
- 06:14, 16 November 2011 (diff | hist) OGC gateway review 1
- 06:12, 16 November 2011 (diff | hist) OGC gateway review 2
- 18:35, 15 November 2011 (diff | hist) N Construction management: concept design (Created page with "The concept design stage is concerned with preparing a concept design for the preferred option and developing and then freezing the project brief. It may also include making an o...")
- 18:21, 15 November 2011 (diff | hist) Construction management: feasibility studies
- 18:16, 15 November 2011 (diff | hist) N Construction management: planning permission (Created page with "Planning permission is a vitally important part of almost all projects, often the difference between whether the project proceeds to design or not. Many clients will be unwilling...")
- 18:13, 15 November 2011 (diff | hist) Traditional contract: planning permission
- 18:04, 15 November 2011 (diff | hist) Construction management: feasibility studies
- 18:03, 15 November 2011 (diff | hist) Construction management: business justification
- 18:01, 15 November 2011 (diff | hist) N Construction management: appointing consultants (Created page with "At various stages of the project, the client may wish to appoint; independent client advisers, members of the consultant team, specialist designers, specialist contractors, site ...")
- 17:53, 15 November 2011 (diff | hist) Construction management: outline work plan
- 17:52, 15 November 2011 (diff | hist) Construction management: feasibility studies
- 17:50, 15 November 2011 (diff | hist) N Construction management: project brief (Created page with "The project brief stage (equivalent to RIBA stage B: Design Brief) is concerned solely with preparing the project brief. We use the term 'project brief' here and throughout the r...")
- 17:42, 15 November 2011 (diff | hist) Construction management: outline work plan
- 17:42, 15 November 2011 (diff | hist) Construction management: outline work plan
- 17:38, 15 November 2011 (diff | hist) Construction management: feasibility studies
- 17:36, 15 November 2011 (diff | hist) Construction management: feasibility studies
- 17:35, 15 November 2011 (diff | hist) Traditional contract: feasibility studies
- 17:35, 15 November 2011 (diff | hist) N Construction management: feasibility studies (Created page with "The feasibility studies stage (equivalent to RIBA Stage A: Appraisal) considers the options for satisfying the client's needs, enabling the client to prepare a business case for ...")
- 17:32, 15 November 2011 (diff | hist) Construction management: business justification
- 17:28, 15 November 2011 (diff | hist) Construction management: business justification
- 17:27, 15 November 2011 (diff | hist) Construction management: business justification
- 08:53, 15 November 2011 (diff | hist) Design and build: construction
- 08:52, 15 November 2011 (diff | hist) Design and build: construction
- 08:52, 15 November 2011 (diff | hist) Traditional contract: construction
- 08:49, 15 November 2011 (diff | hist) Traditional contract: construction
- 08:32, 15 November 2011 (diff | hist) Design and build: mobilisation
- 08:30, 15 November 2011 (diff | hist) Design and build: mobilisation
- 08:27, 15 November 2011 (diff | hist) Design and build: mobilisation
- 08:26, 15 November 2011 (diff | hist) Design and build: mobilisation
- 08:20, 15 November 2011 (diff | hist) Design and build: concept design (design by contractor)
- 08:19, 15 November 2011 (diff | hist) Design and build: detailed design (design by contractor)
- 08:18, 15 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 08:17, 15 November 2011 (diff | hist) Design and build: tender
- 08:01, 15 November 2011 (diff | hist) Design and build: production information
- 06:59, 15 November 2011 (diff | hist) OGC gateway review 0
- 06:58, 15 November 2011 (diff | hist) OGC gateway review 1
- 06:52, 15 November 2011 (diff | hist) OGC gateway review 0
- 06:51, 15 November 2011 (diff | hist) Office of Government Commerce OGC
- 06:37, 15 November 2011 (diff | hist) Office of Government Commerce OGC
- 06:37, 15 November 2011 (diff | hist) Office of Government Commerce OGC
- 06:36, 15 November 2011 (diff | hist) Office of Government Commerce OGC
- 19:21, 14 November 2011 (diff | hist) Works contractor
- 19:09, 14 November 2011 (diff | hist) Preliminaries in construction
- 19:02, 14 November 2011 (diff | hist) Occupation of completed construction site
- 17:23, 14 November 2011 (diff | hist) Design and build: appointment
- 17:18, 14 November 2011 (diff | hist) Design and build: planning permission (design by consultant team)
- 17:18, 14 November 2011 (diff | hist) Design and build: planning permission (design by contractor)
- 17:02, 14 November 2011 (diff | hist) Design and build: planning permission (design by consultant team)
- 16:55, 14 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 16:55, 14 November 2011 (diff | hist) Design and build: concept design (design by contractor)
- 16:46, 14 November 2011 (diff | hist) Design and build: detailed design (design by contractor)
- 16:45, 14 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 16:39, 14 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 16:39, 14 November 2011 (diff | hist) Design and build: detailed design (design by contractor)
- 16:25, 14 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 16:20, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 16:20, 14 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 15:32, 14 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 15:32, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 15:26, 14 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 15:22, 14 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 15:18, 14 November 2011 (diff | hist) Design and build: project brief
- 15:17, 14 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 15:16, 14 November 2011 (diff | hist) Traditional contract: concept design
- 15:09, 14 November 2011 (diff | hist) Design and build: project brief
- 15:08, 14 November 2011 (diff | hist) Design and build: project brief
- 15:07, 14 November 2011 (diff | hist) Traditional contract: project brief
- 15:02, 14 November 2011 (diff | hist) Design and build: feasibility studies
- 14:59, 14 November 2011 (diff | hist) Design and build: feasibility studies
- 14:55, 14 November 2011 (diff | hist) Design and build: business justification
- 14:54, 14 November 2011 (diff | hist) Design and build: business justification
- 14:54, 14 November 2011 (diff | hist) Traditional contract: business justification
- 14:49, 14 November 2011 (diff | hist) Design and build: outline work plan
- 14:47, 14 November 2011 (diff | hist) Design and build: outline work plan
- 14:44, 14 November 2011 (diff | hist) Design and build: post occupancy evaluation
- 14:40, 14 November 2011 (diff | hist) Collaborative practices for building design and construction
- 14:31, 14 November 2011 (diff | hist) Traditional contract: concept design
- 14:28, 14 November 2011 (diff | hist) Traditional contract: tender
- 14:28, 14 November 2011 (diff | hist) Traditional contract: project brief
- 14:27, 14 November 2011 (diff | hist) Traditional contract: production information
- 14:27, 14 November 2011 (diff | hist) Traditional contract: post occupancy evaluation
- 14:26, 14 November 2011 (diff | hist) Traditional contract: planning permission
- 14:26, 14 November 2011 (diff | hist) Traditional contract: occupation and defects liability period
- 14:26, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 14:25, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 14:25, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 14:24, 14 November 2011 (diff | hist) Traditional contract: construction
- 14:24, 14 November 2011 (diff | hist) Traditional contract: concept design
- 14:23, 14 November 2011 (diff | hist) Traditional contract: business justification
- 14:22, 14 November 2011 (diff | hist) Traditional contract: appointment
- 14:21, 14 November 2011 (diff | hist) Design and build: post occupancy evaluation
- 14:10, 14 November 2011 (diff | hist) Traditional contract: planning permission
- 14:09, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 14:06, 14 November 2011 (diff | hist) Traditional contract: appointment
- 14:06, 14 November 2011 (diff | hist) Traditional contract: appointment
- 13:58, 14 November 2011 (diff | hist) Traditional contract: business justification
- 13:54, 14 November 2011 (diff | hist) Traditional contract: outline work plan
- 13:17, 14 November 2011 (diff | hist) Traditional contract: post occupancy evaluation
- 13:15, 14 November 2011 (diff | hist) Traditional contract: post occupancy evaluation
- 13:14, 14 November 2011 (diff | hist) Traditional contract: post occupancy evaluation
- 13:06, 14 November 2011 (diff | hist) Traditional contract: construction
- 12:59, 14 November 2011 (diff | hist) Traditional contract: occupation and defects liability period
- 12:57, 14 November 2011 (diff | hist) Final report for construction works
- 12:55, 14 November 2011 (diff | hist) N Final report for construction works (Created page with "A final report is prepared by the contract administrator at the end at the end of the defects liability period once all defects have been rectified. It provides a summary of the...")
- 12:40, 14 November 2011 (diff | hist) Traditional contract: construction
- 12:39, 14 November 2011 (diff | hist) Traditional contract: construction
- 12:37, 14 November 2011 (diff | hist) Traditional contract: construction
- 12:32, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 12:31, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 12:05, 14 November 2011 (diff | hist) Traditional contract: construction
- 12:05, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 11:53, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 11:52, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 11:52, 14 November 2011 (diff | hist) Traditional contract: tender
- 11:44, 14 November 2011 (diff | hist) Traditional contract: tender
- 11:38, 14 November 2011 (diff | hist) m Traditional contract: tender
- 11:37, 14 November 2011 (diff | hist) Traditional contract: tender
- 11:23, 14 November 2011 (diff | hist) Traditional contract: production information
- 11:22, 14 November 2011 (diff | hist) Traditional contract: production information
- 11:21, 14 November 2011 (diff | hist) Design review
- 11:09, 14 November 2011 (diff | hist) Traditional contract: planning permission
- 11:01, 14 November 2011 (diff | hist) Traditional contract: planning permission
- 10:54, 14 November 2011 (diff | hist) Traditional contract: appointment
- 10:51, 14 November 2011 (diff | hist) Traditional contract: appointment
- 10:40, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 10:39, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 10:35, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 10:13, 14 November 2011 (diff | hist) Traditional contract: concept design
- 10:13, 14 November 2011 (diff | hist) Traditional contract: concept design
- 10:11, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 10:10, 14 November 2011 (diff | hist) Traditional contract: concept design
- 09:59, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 09:54, 14 November 2011 (diff | hist) Traditional contract: project brief
- 09:50, 14 November 2011 (diff | hist) Traditional contract: project brief
- 09:49, 14 November 2011 (diff | hist) Traditional contract: project brief
- 09:30, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 09:28, 14 November 2011 (diff | hist) Traditional contract: feasibility studies
- 09:07, 14 November 2011 (diff | hist) Traditional contract: outline work plan
- 08:45, 14 November 2011 (diff | hist) Traditional contract: business justification
- 08:24, 14 November 2011 (diff | hist) Preliminaries in construction
- 08:18, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 08:17, 14 November 2011 (diff | hist) Traditional contract: mobilisation
- 08:15, 14 November 2011 (diff | hist) Traditional contract: construction
- 08:11, 14 November 2011 (diff | hist) Building owner's manual - O and M manual
- 08:08, 14 November 2011 (diff | hist) Traditional contract: detailed design
- 07:07, 14 November 2011 (diff | hist) Novation
- 06:59, 14 November 2011 (diff | hist) Notifiable project F10 form
- 06:52, 14 November 2011 (diff | hist) Named supplier in construction contracts
- 06:47, 14 November 2011 (diff | hist) Named sub-contractor
- 06:46, 14 November 2011 (diff | hist) Nominated sub-contractor
- 08:03, 13 November 2011 (diff | hist) Migration strategy
- 07:54, 13 November 2011 (diff | hist) Mid-tender interview for construction contract
- 07:50, 13 November 2011 (diff | hist) Method statement for construction
- 07:39, 13 November 2011 (diff | hist) Mediation in construction
- 07:31, 13 November 2011 (diff | hist) Management structure for construction clients
- 07:30, 13 November 2011 (diff | hist) Management structure for construction clients
- 07:22, 13 November 2011 (diff | hist) Management contractor
- 07:10, 13 November 2011 (diff | hist) Loss and expense
- 07:05, 13 November 2011 (diff | hist) Construction contract conditions
- 06:59, 13 November 2011 (diff | hist) Legal agreements for design and construction
- 08:07, 12 November 2011 (diff | hist) Lead designer
- 07:49, 12 November 2011 (diff | hist) Liquidated damages in construction contracts
- 07:45, 12 November 2011 (diff | hist) Lead consultant for building design
- 07:43, 12 November 2011 (diff | hist) Traditional contract: tender
- 07:38, 12 November 2011 (diff | hist) Lead consultant for building design
- 07:34, 12 November 2011 (diff | hist) Latent defects
- 07:21, 12 November 2011 (diff | hist) Key performance indicators KPI
- 07:15, 12 November 2011 (diff | hist) Invitation to negotiate for PFI
- 07:07, 12 November 2011 (diff | hist) Invitation to tender for construction contracts
- 06:54, 12 November 2011 (diff | hist) Investment decision maker for building design and construction
- 06:34, 12 November 2011 (diff | hist) Integrated project team
- 06:33, 12 November 2011 (diff | hist) Integrated supply team
- 06:32, 12 November 2011 (diff | hist) Integrated supply team
- 12:15, 11 November 2011 (diff | hist) Integrated project team
- 12:14, 11 November 2011 (diff | hist) Integrated project team
- 12:09, 11 November 2011 (diff | hist) Design review
- 12:07, 11 November 2011 (diff | hist) Design quality for buildings
- 12:05, 11 November 2011 (diff | hist) Output-based specification
- 12:02, 11 November 2011 (diff | hist) Interim certificates in construction contracts
- 11:57, 11 November 2011 (diff | hist) Initial cost appraisal for design and construction
- 11:51, 11 November 2011 (diff | hist) Information release schedule for construction
- 11:44, 11 November 2011 (diff | hist) m Information release schedule for construction (moved Information release schedules to Information release schedule)
- 11:43, 11 November 2011 (diff | hist) Independent client adviser for building design and construction
- 11:33, 11 November 2011 (diff | hist) CDM 2007 Health and safety file
- 11:28, 11 November 2011 (diff | hist) Health and safety for building design and construction
- 11:15, 11 November 2011 (diff | hist) Handing over possession of the construction site to the contractor
- 11:14, 11 November 2011 (diff | hist) Handing over possession of the construction site to the contractor
- 11:11, 11 November 2011 (diff | hist) N Pre-contract meeting for construction contracts (Created page with "The pre-contract meeting is an important meeting that takes place after the contractor has been appointed but before work commences on site. It is an opportunity to for the proje...")
- 10:43, 11 November 2011 (diff | hist) Design and build: construction
- 10:40, 11 November 2011 (diff | hist) Public project: construction
- 10:39, 11 November 2011 (diff | hist) Traditional contract: construction
- 10:39, 11 November 2011 (diff | hist) Traditional contract: construction
- 10:36, 11 November 2011 (diff | hist) Traditional contract: construction
- 10:32, 11 November 2011 (diff | hist) Handover of the construction site to the client
- 10:25, 11 November 2011 (diff | hist) Funding prospectus for new developments
- 10:22, 11 November 2011 (diff | hist) Funding options for building developments
- 10:18, 11 November 2011 (diff | hist) Funding options for building developments
- 10:15, 11 November 2011 (diff | hist) Fluctuations in construction contracts
- 10:12, 11 November 2011 (diff | hist) Final certificate for construction contracts
- 10:07, 11 November 2011 (diff | hist) Final account
- 10:02, 11 November 2011 (diff | hist) Feasibility studies for construction projects
- 10:01, 11 November 2011 (diff | hist) Feasibility studies for construction projects
- 09:57, 11 November 2011 (diff | hist) Extension of time EOT in construction contracts
- 09:52, 11 November 2011 (diff | hist) Equipment installed in buildings
- 09:48, 11 November 2011 (diff | hist) Environmental impact assessment EIA
- 09:41, 11 November 2011 (diff | hist) Energy targets for buildings
- 09:35, 11 November 2011 (diff | hist) Energy certificates for buildings
- 09:19, 11 November 2011 (diff | hist) Employer's requirements for building design and construction
- 09:07, 11 November 2011 (diff | hist) Defects liability period DLP
- 09:07, 11 November 2011 (diff | hist) Defects in construction
- 09:06, 11 November 2011 (diff | hist) Employer's agent for design and build
- 08:49, 11 November 2011 (diff | hist) Target emission rate TER
- 08:45, 11 November 2011 (diff | hist) Elemental cost plan for design and construction
- 08:43, 11 November 2011 (diff | hist) Approximate quantities cost plan
- 08:33, 11 November 2011 (diff | hist) Easements
- 08:30, 11 November 2011 (diff | hist) Earned value for construction contracts
- 08:27, 11 November 2011 (diff | hist) Domestic sub-contractor
- 08:24, 11 November 2011 (diff | hist) Document control in building design and construction
- 08:18, 11 November 2011 (diff | hist) Detailed planning application
- 08:16, 11 November 2011 (diff | hist) Detailed planning application
- 08:02, 11 November 2011 (diff | hist) Detailed design report
- 07:56, 11 November 2011 (diff | hist) Detailed design stage in building design
- 07:54, 11 November 2011 (diff | hist) Detailed design stage in building design
- 06:58, 11 November 2011 (diff | hist) Designers for buildings and other built assets
- 06:51, 11 November 2011 (diff | hist) Design quality for buildings
- 06:35, 11 November 2011 (diff | hist) Design review
- 06:34, 11 November 2011 (diff | hist) Risk management for building design
- 06:33, 11 November 2011 (diff | hist) Risk management for building design
- 18:45, 10 November 2011 (diff | hist) Office of Government Commerce OGC
- 18:45, 10 November 2011 (diff | hist) Design review
- 18:28, 10 November 2011 (diff | hist) Design and build procurement route
- 18:24, 10 November 2011 (diff | hist) Employer's requirements for building design and construction
- 18:23, 10 November 2011 (diff | hist) Contractor's proposals for building design and construction
- 18:22, 10 November 2011 (diff | hist) Two-stage tender
- 18:15, 10 November 2011 (diff | hist) Design and access statement
- 18:14, 10 November 2011 (diff | hist) Design and access statement
- 18:08, 10 November 2011 (diff | hist) m Design and access statement (moved Design and access statements to Design and access statement)
- 18:07, 10 November 2011 (diff | hist) Defects in construction
- 18:06, 10 November 2011 (diff | hist) Defects liability period DLP
- 17:56, 10 November 2011 (diff | hist) Defects in construction
- 17:49, 10 November 2011 (diff | hist) Defects in construction
- 17:39, 10 November 2011 (diff | hist) Cost consultant
- 17:38, 10 November 2011 (diff | hist) N Whole life costs (moved Whole life costs to Whole-life costs)
- 17:38, 10 November 2011 (diff | hist) m Whole-life costs for buildings WLC (moved Whole life costs to Whole-life costs)
- 17:37, 10 November 2011 (diff | hist) Cost plans for construction projects
- 17:36, 10 November 2011 (diff | hist) Cost plans for construction projects
- 17:32, 10 November 2011 (diff | hist) Cost consultant
- 17:26, 10 November 2011 (diff | hist) N Contract sum analysis (Created page with "A contract sum analysis is generally prepared by a contractor as part of their tender on design and build projects. It breaks down the contractor's price into a form allowing the...")
- 17:15, 10 November 2011 (diff | hist) Contract sum
- 17:10, 10 November 2011 (diff | hist) Contractor's proposals for building design and construction
- 17:07, 10 November 2011 (diff | hist) Two-stage tender
- 17:03, 10 November 2011 (diff | hist) Contractor's master programme
- 17:00, 10 November 2011 (diff | hist) Construction contractor
- 16:54, 10 November 2011 (diff | hist) N Works contractor (Created page with "NEEDS CHANGING FROM TRADE CONTRACTOR On construction management contracts, a construction manager is appointed on a consultancy and management basis to provi...")
- 16:51, 10 November 2011 (diff | hist) m Trade contractor (moved Trade contractors to Trade contractor)
- 16:45, 10 November 2011 (diff | hist) Contract documents for construction
- 16:38, 10 November 2011 (diff | hist) Construction contract conditions
- 16:25, 10 November 2011 (diff | hist) Contract administrator for construction contracts
- 16:19, 10 November 2011 (diff | hist) Construction contract
- 16:13, 10 November 2011 (diff | hist) Typical tender process for construction projects
- 16:07, 10 November 2011 (diff | hist) Construction contract
- 16:05, 10 November 2011 (diff | hist) Contingency plan
- 15:59, 10 November 2011 (diff | hist) m Contingency plan (moved Contingency plans to Contingency plan)
- 15:59, 10 November 2011 (diff | hist) Contingencies in construction
- 14:48, 10 November 2011 (diff | hist) Get started - top tips and help
- 14:47, 10 November 2011 (diff | hist) About
- 14:46, 10 November 2011 (diff | hist) About
- 14:46, 10 November 2011 (diff | hist) About
- 14:45, 10 November 2011 (diff | hist) Get started - top tips and help
- 14:45, 10 November 2011 (diff | hist) Consultation process
- 14:44, 10 November 2011 (diff | hist) Consultation process
- 14:31, 10 November 2011 (diff | hist) Request for proposals from consultants RFP
- 14:29, 10 November 2011 (diff | hist) Consultant's proposals for design and construction
- 14:11, 10 November 2011 (diff | hist) Consultant team start-up meeting
- 14:04, 10 November 2011 (diff | hist) Business case for construction projects
- 14:03, 10 November 2011 (diff | hist) Business case for construction projects
- 14:02, 10 November 2011 (diff | hist) Preliminary business case for construction project
- 14:00, 10 November 2011 (diff | hist) Types of consultant in the construction industry
- 13:59, 10 November 2011 (diff | hist) Types of consultant in the construction industry
- 13:48, 10 November 2011 (diff | hist) Construction stage report
- 13:43, 10 November 2011 (diff | hist) m Construction progress meeting (moved Construction progress meetings to Construction progress meeting)
- 13:43, 10 November 2011 (diff | hist) Construction progress report
- 13:36, 10 November 2011 (diff | hist) m Construction progress report (moved Construction progress reports to Construction progress report)
- 13:34, 10 November 2011 (diff | hist) About
- 13:33, 10 November 2011 (diff | hist) About
- 13:15, 10 November 2011 (diff | hist) Outline planning application
- 13:15, 10 November 2011 (diff | hist) Planning permission
- 13:14, 10 November 2011 (diff | hist) Planning permission
- 13:13, 10 November 2011 (diff | hist) Outline planning application
- 13:13, 10 November 2011 (diff | hist) Detailed planning application
- 13:12, 10 November 2011 (diff | hist) Detailed planning application
- 15:01, 9 November 2011 (diff | hist) Traditional contract: feasibility studies
- 14:15, 9 November 2011 (diff | hist) Tender report for construction contracts
- 08:42, 9 November 2011 (diff | hist) Construction progress meeting
- 08:26, 9 November 2011 (diff | hist) CDM 2007 Construction phase plan
- 08:20, 9 November 2011 (diff | hist) 2007 CDM Regulations
- 08:16, 9 November 2011 (diff | hist) Construction manager
- 07:59, 9 November 2011 (diff | hist) Concept structural design of buildings
- 07:56, 9 November 2011 (diff | hist) Concept services design
- 07:53, 9 November 2011 (diff | hist) Concept services design
- 06:56, 9 November 2011 (diff | hist) Concept design report
- 19:50, 8 November 2011 (diff | hist) Concept architectural design checklist
- 19:29, 8 November 2011 (diff | hist) Concept architectural design checklist
- 19:25, 8 November 2011 (diff | hist) Community infrastructure levy CIL
- 18:20, 8 November 2011 (diff | hist) Commissioning building systems
- 18:16, 8 November 2011 (diff | hist) Collateral warranties for building design and construction
- 18:09, 8 November 2011 (diff | hist) Collaborative practices for building design and construction
- 17:51, 8 November 2011 (diff | hist) Change control procedure for building design and construction
- 17:44, 8 November 2011 (diff | hist) Champions for construction clients
- 17:39, 8 November 2011 (diff | hist) Certificate of making good defects
- 17:31, 8 November 2011 (diff | hist) CDM co-ordinator
- 17:30, 8 November 2011 (diff | hist) 2007 CDM Regulations
- 17:24, 8 November 2011 (diff | hist) 2007 CDM Regulations
- 17:14, 8 November 2011 (diff | hist) Client's representative
- 17:11, 8 November 2011 (diff | hist) Client for building design and construction
- 17:09, 8 November 2011 (diff | hist) Client for building design and construction
- 17:08, 8 November 2011 (diff | hist) Client for building design and construction
- 16:40, 8 November 2011 (diff | hist) Cash flow in construction
- 16:38, 8 November 2011 (diff | hist) Capital allowances for construction
- 16:32, 8 November 2011 (diff | hist) Computer aided design CAD
- 16:22, 8 November 2011 (diff | hist) Business case for construction projects
- 16:16, 8 November 2011 (diff | hist) Building regulations
- 16:15, 8 November 2011 (diff | hist) Building user's guide
- 12:55, 8 November 2011 (diff | hist) Building owner's manual - O and M manual
- 12:49, 8 November 2011 (diff | hist) Building log book
- 12:43, 8 November 2011 (diff | hist) Budget for building design and construction projects
- 12:43, 8 November 2011 (diff | hist) Budget for building design and construction projects
- 12:39, 8 November 2011 (diff | hist) Briefing documents for building design
- 12:36, 8 November 2011 (diff | hist) Briefing documents for building design
- 12:25, 8 November 2011 (diff | hist) Building information modelling BIM
- 12:15, 8 November 2011 (diff | hist) Bill of quantities BOQ
- 12:02, 8 November 2011 (diff | hist) Project benchmarking
- 12:01, 8 November 2011 (diff | hist) Project benchmarking
- 12:00, 8 November 2011 (diff | hist) Project benchmarking
- 11:48, 8 November 2011 (diff | hist) Base date in construction contracts
- 11:46, 8 November 2011 (diff | hist) Base date in construction contracts
- 11:36, 8 November 2011 (diff | hist) Attendance for construction
- 11:33, 8 November 2011 (diff | hist) Architect
- 11:32, 8 November 2011 (diff | hist) Architect
- 11:30, 8 November 2011 (diff | hist) Architect
- 11:21, 8 November 2011 (diff | hist) Arbitration in the construction industry
- 11:21, 8 November 2011 (diff | hist) Arbitration in the construction industry
- 11:08, 8 November 2011 (diff | hist) Arbitration in the construction industry
- 11:04, 8 November 2011 (diff | hist) Final account
- 11:03, 8 November 2011 (diff | hist) Contract sum
- 11:02, 8 November 2011 (diff | hist) Tender pricing document
- 11:02, 8 November 2011 (diff | hist) Pre-tender estimate for contracts
- 11:01, 8 November 2011 (diff | hist) Elemental cost plan for design and construction
- 11:00, 8 November 2011 (diff | hist) Initial cost appraisal for design and construction
- 11:00, 8 November 2011 (diff | hist) Approximate quantities cost plan
- 10:57, 8 November 2011 (diff | hist) Initial cost appraisal for design and construction
- 10:55, 8 November 2011 (diff | hist) Approximate quantities cost plan
- 10:44, 8 November 2011 (diff | hist) Appointing consultants for building design and construction
- 10:40, 8 November 2011 (diff | hist) Appointing consultants for building design and construction
- 10:23, 8 November 2011 (diff | hist) Alternative dispute resolution for construction ADR
- 10:12, 8 November 2011 (diff | hist) Adjudication in construction contracts
- 10:11, 8 November 2011 (diff | hist) Adjudication in construction contracts
- 09:23, 8 November 2011 (diff | hist) Appointing consultants for building design and construction
- 09:22, 8 November 2011 (diff | hist) Appointing consultants for building design and construction
- 09:18, 8 November 2011 (diff | hist) Construction contract
- 09:17, 8 November 2011 (diff | hist) Construction contract
- 09:14, 8 November 2011 (diff | hist) Construction contract
- 09:13, 8 November 2011 (diff | hist) Construction contract
- 09:10, 8 November 2011 (diff | hist) Site waste management plan SWMP
- 09:09, 8 November 2011 (diff | hist) Site waste management plan SWMP
- 11:33, 7 November 2011 (diff | hist) Public project: PFI tender
- 11:32, 7 November 2011 (diff | hist) Public project: PFI tender
- 11:22, 7 November 2011 (diff | hist) Design and build: business justification
- 11:21, 7 November 2011 (diff | hist) Design and build: business justification
- 11:20, 7 November 2011 (diff | hist) Design and build: post occupancy evaluation
- 11:18, 7 November 2011 (diff | hist) Design and build: production information
- 11:17, 7 November 2011 (diff | hist) Design and build: detailed design (design by consultant team)
- 11:14, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:13, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:10, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:09, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:08, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:07, 7 November 2011 (diff | hist) Design and build: concept design (design by consultant team)
- 11:04, 7 November 2011 (diff | hist) Design and build: concept design (design by contractor)
- 11:03, 7 November 2011 (diff | hist) Design and build: outline work plan
- 11:02, 7 November 2011 (diff | hist) m Design and build: detailed design (design by contractor) (moved Design and build detailed design (design by contractor) to Design and build: detailed design (design by contractor))
- 11:01, 7 November 2011 (diff | hist) Design and build: concept design (design by contractor)
- 10:14, 7 November 2011 (diff | hist) Specialist contractor
- 10:13, 7 November 2011 (diff | hist) Named supplier in construction contracts
- 10:12, 7 November 2011 (diff | hist) Sub-contractor
- 10:12, 7 November 2011 (diff | hist) Named sub-contractor
- 10:11, 7 November 2011 (diff | hist) Nominated sub-contractor
- 10:10, 7 November 2011 (diff | hist) Structural engineer
- 10:10, 7 November 2011 (diff | hist) Specialist designer for construction projects
- 10:09, 7 November 2011 (diff | hist) Site inspector for construction works
- 10:09, 7 November 2011 (diff | hist) Services engineer
- 10:08, 7 November 2011 (diff | hist) m Designers for buildings and other built assets (moved Designers to Designer)
- 10:08, 7 November 2011 (diff | hist) Lead designer
- 10:07, 7 November 2011 (diff | hist) Lead consultant for building design
- 10:07, 7 November 2011 (diff | hist) Integrated supply team
- 10:07, 7 November 2011 (diff | hist) Independent client adviser for building design and construction
- 10:06, 7 November 2011 (diff | hist) Designers for buildings and other built assets
- 10:05, 7 November 2011 (diff | hist) Contract administrator for construction contracts
- 10:04, 7 November 2011 (diff | hist) Project manager
- 10:02, 7 November 2011 (diff | hist) Types of consultant in the construction industry
- 10:00, 7 November 2011 (diff | hist) Types of consultant in the construction industry
- 09:59, 7 November 2011 (diff | hist) m Independent client adviser for building design and construction (moved Independent client advisers to Independent client adviser: remove plural)
- 09:48, 7 November 2011 (diff | hist) OGC gateway review 1
- 09:48, 7 November 2011 (diff | hist) OGC gateway review 0
- 09:46, 7 November 2011 (diff | hist) OGC gateway review 1
- 09:44, 7 November 2011 (diff | hist) OGC gateway review 2
- 09:43, 7 November 2011 (diff | hist) OGC gateway review 3
- 09:39, 7 November 2011 (diff | hist) OGC gateway review 4
- 09:39, 7 November 2011 (diff | hist) OGC gateway review 5
- 09:35, 7 November 2011 (diff | hist) OGC gateway review 4
- 09:33, 7 November 2011 (diff | hist) OGC decision point 2
- 09:31, 7 November 2011 (diff | hist) OGC gateway review 3
- 09:29, 7 November 2011 (diff | hist) N OGC gateway review 5 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement. <blockquote>''The OGC Gateway Process examines programmes and p...")
- 09:28, 7 November 2011 (diff | hist) N OGC gateway review 4 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement. <blockquote>''The OGC Gateway Process examines programmes and p...")
- 09:27, 7 November 2011 (diff | hist) N OGC gateway review 3 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement. <blockquote>''The OGC Gateway Process examines programmes and p...")
- 09:25, 7 November 2011 (diff | hist) N OGC decision point 2 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement. <blockquote>''The OGC Gateway Process examines programmes and p...")
- 09:18, 7 November 2011 (diff | hist) OGC decision point 1
- 09:17, 7 November 2011 (diff | hist) OGC decision point 1
- 09:15, 7 November 2011 (diff | hist) OGC decision point 1
- 09:15, 7 November 2011 (diff | hist) N OGC decision point 1 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement. '''The OGC Gateway Process examines programmes and projects at k...")
- 09:04, 7 November 2011 (diff | hist) OJEU procurement procedures
(Latest | Earliest) View (newer 500 | older 500) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.