Integrated project team
Integrated project team is a term used by the government to describe a system of collaborative working between all of those involved in the delivery of a project on a day to day basis.
OGC guidance defined an integrated project team as being...
'...made up of the client’s project team and the supply team of consultants, constructors and specialist suppliers. It brings together the design and construction activities, with maintenance considered as well, whether or not the integrated project team will be responsible for the ongoing maintenance of the facility; it involves valued input from all parties in the supply team.'
(Ref. Achieving Excellence Guide 5 - The Integrated Project Team P4.)
It suggested that...
'...client and suppliers working together as a team can enhance whole-life value while reducing total cost, improve quality, innovate and deliver a project far more effectively than in a traditional fragmented relationship that is often adversarial. Collaborative working should be a core requirement for each element of every project. Putting it into practice through teamworking and partnering requires real commitment from all parties involved, but brings benefits that far outweigh the effort involved.'
(Ref. Achieving Excellence Guide 5 - The Integrated Project Team P4.)
The integrated project team differs from the integrated supply team as it includes the client, and a project manager if there is one, whereas the integrated supply team relates only to the main contractor and their supply chain (designers, sub contractors, suppliers, etc.). OGC guidance illustrates these relationships as shown below.
Image reproduced with permission of OGC (ref. Achieving Excellence Guide 5 - The Integrated Project Team P5.)
The integrated project team is particularly relevant on public projects as the recommended procurement routes proposed by the Government Construction Strategy are private finance initiative (PFI), prime contracting and design and build. Under these routes, the entire integrated supply team (designers, contractors, specialist suppliers and facilities managers) are appointed after the brief has been prepared, without the benefit of design.
Detailed guidance on integrated project teams was provided in the OGC guide Achieving Excellence Guide 5 - The Integrated Project Team. There was also an integration toolkit created by the Strategic Forum describing how better value can be achieved through the collaborative working of an integrated project team, which fully recognises the capabilities of all those involved in delivering a project.... ...removes the barriers between design and implementation, enabling all parties to be involved in discussion on the principles which will affect them, enabling high-quality decisions to be made on the basis of all the implications throughout the lifetime of the facility in question.....
- a single team focused on a common set of goals and objectives delivering benefit for all concerned
- a team so seamless, that it appears to operate as if it were a company in its own right
- a team, with no apparent boundaries, in which all the members have the same opportunity to contribute and all the skills and capabilities on offer can be utilised to maximum effect.
(Ref. Strategic Forum: Integrated project team.)
NB: The Office of Government Commerce (OGC) OGC guidance has been archived, however, it is cited in the Government Construction Strategy and the Common Minimum Standards, and links are provided to OGC documents from government websites such as the Major Projects Authority.
The OGC gateway review process still provides one of the best and most comprehensive sets of guidance for public projects. It is for this reason that the project plan for public projects within Designing Buildings Wiki follows the OGC gateway review process.
NB: Using Two Stage Open Book and Supply Chain Collaboration, published by HMSO in 2014, defines an integrated team as ‘…the Client(s), Consultants, Tier 1 Contractor(s) and Tier 2/3 Subcontractors and Suppliers undertaking a project or programme of work.’
[edit] Related articles on Designing Buildings
- Adversarial behaviour in the UK construction industry.
- Collaborative practices.
- Construction project.
- Consultant team.
- Decision maker
- Decision making unit DMU.
- Design and build.
- Designers.
- Early contractor involvement.
- Eight construction industry networking tips.
- Government Construction Strategy.
- Integrated project delivery (IPD).
- Integrated project insurance.
- Integrated supply team.
- Major Projects Authority.
- Multi-disciplinary.
- OGC.
- PPC 2000.
- Prime contract.
- Private finance initiative.
- Public procurement.
- Relationship management.
- Team management.
- What is a complete team?
[edit] External references
- Achieving Excellence Guide 5 - The Integrated Project Team.
- The Collaborative Working centre.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.