Integrated project team
Integrated project team is a term used by the government to describe a system of collaborative working between all of those involved in the delivery of a project on a day to day basis.
OGC guidance defined an integrated project team as being...
'...made up of the client’s project team and the supply team of consultants, constructors and specialist suppliers. It brings together the design and construction activities, with maintenance considered as well, whether or not the integrated project team will be responsible for the ongoing maintenance of the facility; it involves valued input from all parties in the supply team.'
(Ref. Achieving Excellence Guide 5 - The Integrated Project Team P4.)
It suggested that...
'...client and suppliers working together as a team can enhance whole-life value while reducing total cost, improve quality, innovate and deliver a project far more effectively than in a traditional fragmented relationship that is often adversarial. Collaborative working should be a core requirement for each element of every project. Putting it into practice through teamworking and partnering requires real commitment from all parties involved, but brings benefits that far outweigh the effort involved.'
(Ref. Achieving Excellence Guide 5 - The Integrated Project Team P4.)
The integrated project team differs from the integrated supply team as it includes the client, and a project manager if there is one, whereas the integrated supply team relates only to the main contractor and their supply chain (designers, sub contractors, suppliers, etc.). OGC guidance illustrates these relationships as shown below.
Image reproduced with permission of OGC (ref. Achieving Excellence Guide 5 - The Integrated Project Team P5.)
The integrated project team is particularly relevant on public projects as the recommended procurement routes proposed by the Government Construction Strategy are private finance initiative (PFI), prime contracting and design and build. Under these routes, the entire integrated supply team (designers, contractors, specialist suppliers and facilities managers) are appointed after the brief has been prepared, without the benefit of design.
Detailed guidance on integrated project teams was provided in the OGC guide Achieving Excellence Guide 5 - The Integrated Project Team. There was also an integration toolkit created by the Strategic Forum describing how better value can be achieved through the collaborative working of an integrated project team, which fully recognises the capabilities of all those involved in delivering a project.... ...removes the barriers between design and implementation, enabling all parties to be involved in discussion on the principles which will affect them, enabling high-quality decisions to be made on the basis of all the implications throughout the lifetime of the facility in question.....
- a single team focused on a common set of goals and objectives delivering benefit for all concerned
- a team so seamless, that it appears to operate as if it were a company in its own right
- a team, with no apparent boundaries, in which all the members have the same opportunity to contribute and all the skills and capabilities on offer can be utilised to maximum effect.
(Ref. Strategic Forum: Integrated project team.)
NB: The Office of Government Commerce (OGC) OGC guidance has been archived, however, it is cited in the Government Construction Strategy and the Common Minimum Standards, and links are provided to OGC documents from government websites such as the Major Projects Authority.
The OGC gateway review process still provides one of the best and most comprehensive sets of guidance for public projects. It is for this reason that the project plan for public projects within Designing Buildings Wiki follows the OGC gateway review process.
NB: Using Two Stage Open Book and Supply Chain Collaboration, published by HMSO in 2014, defines an integrated team as ‘…the Client(s), Consultants, Tier 1 Contractor(s) and Tier 2/3 Subcontractors and Suppliers undertaking a project or programme of work.’
[edit] Related articles on Designing Buildings
- Adversarial behaviour in the UK construction industry.
- Collaborative practices.
- Construction project.
- Consultant team.
- Decision maker
- Decision making unit DMU.
- Design and build.
- Designers.
- Early contractor involvement.
- Eight construction industry networking tips.
- Government Construction Strategy.
- Integrated project delivery (IPD).
- Integrated project insurance.
- Integrated supply team.
- Major Projects Authority.
- Multi-disciplinary.
- OGC.
- PPC 2000.
- Prime contract.
- Private finance initiative.
- Public procurement.
- Relationship management.
- Team management.
- What is a complete team?
[edit] External references
- Achieving Excellence Guide 5 - The Integrated Project Team.
- The Collaborative Working centre.
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”