Construction industry acronyms - F
This article presents a list of construction industry acronyms beginning with 'F'.
For other letters click on the list below:
A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - R - S - T - U - V - W - X - Y - Z
[edit] F
F&RA - Fire and Rescue Authority
FA - Floor Above
FA - Forms of Appointment
FAAP - Fitzrovia Area Action Plan
FAME - Fatty Acid Methyl Esters
FAO - For attention of
FAOLU - Farming, Agriculture and Other Land Uses
FAP - Fire Alarm Panel
FAR - Floor Area Ratio
FARL - Feh Index Of Flood Attenuation Due To Reservoirs And Lake
FARL - Flood attenuation due to reservoirs and lakes
FAS - Fall Arrest System
FAST - Function Analysis System Technique (value management)
FAT - Factory Acceptance Test
FAT - Full agricultural tenancy
FB - From Below
FBC - Full Business Case
FBT - Farm business tenancy
FBTA - From Below To Above
FC - False Ceiling
FC - Flexible Connection
FC - Foot Candle.
FC - Tuflow Flow Constriction Layer
FC(SP)R - Fire Certificate (Special Premises) Regulations 1976
FCA - Facility Condition Assessment
FCA - Flood Consequence Assessment
FCCP - Fire Curtain Control Panel
FCD - Field Capacity Days
FCEC - Federation of Civil Engineering Contractors (dissolved in November 1996 and superseded by the Civil Engineering Contractors Association (CECA))
FCERM - flood and coastal erosion risk management
FCEV - Fuel Cell Electric Vehicle
FCI - Facility Condition Index
FCRM - Flood & Coastal Risk Management
FCU - Fan Coil Unit
FD - Fire Door
FD - Floor Drain
FDAS - Fire Detection and Alarm Systems
FDC - FLow Duration Course
FDFAS - Fire Detection and Fire Alarm System
FDIS - Final Draft International Standard
FDM - Foundational Data Model
FEC - Factory Engineered Concrete
FEED - Front End Engineering and Design (contract)
FEES - Fabric Energy Efficiency Standard
FEF - Fire and Emergency File
FEH - Flood Estimation Handbook
FEM - Finite Element Method (simulation techniques)
FER - Fundamental Expenditure Review
FERA - Fera Science Limited (Formerly Food And Environment Research Agency)
FES - Fabric Energy Storage
FESS - Fire, Emergency and Security Systems
FETA - Federation of Environmental Trade Associations
FF - Far Face
FF - Floor Finishes (plan)
FF - Fridge Freezer
FF&E / FFE - Furniture Fittings & Equipment
FFC - Flat Flexible Cables
FFHH - Fitness For Human Habitation.
FFI - Fee for Intervention (Health and Safety Executive)
FFL - Finished Floor Level
FFOG - Food, Fats, Oils and Grease
FFP - Filtering Facepieces
FFP - Finished Floor Plan
FFP - Fit For Purpose
FFR - Firm Frequency Response
FGD - Flue-Gas Desulphurisation
FGL - Finished Ground Level
FGRS - Flue Gas Recovery Systems
FH - Fire Hydrant
FHC - Fully Hydraulically Calculated
FHS - Future Homes Standard
FI - Fire Investigation
FIA - Fire Industry Association
FICE - Fellow of the Institution of Civil Engineers
FID - Final Investment Decision
FIDIC - Fédération Internationale des Ingénieurs-Conseils
FIM - Facilities Information Model
FIS - Finishes and Interiors Sector.
FISP - Financial Systems and Payments
FIStructE - Fellow of the Institution of Structural Engineers
FIT - Feed-In Tariff
FIXT - Fixture
FL - Floor Level
FLOWMIS - Floating Offshore Wind Manufacturing Investment Scheme
FLP - Flameproof
FLR - Floor
FLS - Funding for Lending Scheme
FMA - Facilities Management Administrator
FMA - Facilities Management Audit
FMAS - Financial Management Accounting System
FMB - Federation of Master Builders
FMCG - Fast-moving consumer goods
FMD - Foot And Mouth Disease
FMD - Fuel Mix Disclosure
FMEA - Failure Mode and Effects Analysis
FMECA - Failure Mode, Effects and Criticality Analysis
FMfSW - Flood Map For Surface Water
FMU - Field Management Unit
FND - Foundation
FO - Fibre Optic
FOAK - First of a kind
FOC - Face of Concrete
FOC - Fibre Optic Cable
FOD - Field Operations Directorate
FoE - Friends Of The Earth
FOF - Face of Finish
FOG - Fat Oil and Grease
FoMLG - Friends Of Marie Louise Gardens
FOPS - Falling Object Protective Structure
FORS - Fleet Operator Recognition Scheme
FOS - Face of Stud
FOU - For official Use
FP - Field Professional
FP - Foamed Polyethylene
FP(W)R - Fire Precautions (Workplace) Regulations 1997
FPA71 - Fire Precautions Act 1971
FPC - Factory Production Control
FPC - Flat Printed Circuits
FPE - Fan Pressurisation Equipment
FPEXT - Floodplain Extent The Fraction Of The Catchment Inundated By A 1 In 100
FPEXT - Floodplain extent, the fraction of the catchment inundated by a 1 in 100
FPL - Fireplace
FPN - Fixed Penalty Notice
FPO - Fire Prevention officer
FPS - Functional Performance Specification
FPT - Functional Performance Testing
FR - Fire Rated
FR - Fire-Resistant
Fr - Froude number
FRA - Fire and Rescue Authority
FRA - Fire Risk Assessor
FRA - Flood Risk Assessment
FRAEW - Fire Risk Appraisal of External Walls
FRAP - Flood Risk Activity Permit
FRCM - fabric-reinforced cementitious matrix
FRCM - fibre-reinforced cementitious mortars
FRe - Flood Resilience (technologies)
FRI - Full Repairing and Insuring (Lease)
FRL - Fibre Reinforced Laminate
FRM - Flood Risk Management
FRMP - Flood Risk Management Plan
FROOF (T4) - Lowest UK / Euro Fire resistance class for roofs (see also BROOF, CROOF and DROOF)
FRP - Fibre Reinforced Plastic
FRP - Fibre Reinforced Polymer
FRR - The Flood Risk Regulations 2009
FRS - Fire and Rescue Service
FRSD - Fire and Rescue Service Directorate
FS - Fire Strategy (drawing)
FS - Fused Spur
FSA - Fire and Security Association
FSC - Forest Stewardship Council
FSD - Fire and Smoke Damper
FSD - Full Scale Deflection
FSI - Floor Space Index
FSM - Frequency Sensitive Mode
FSMS - Field Survey Methods And Standards
FSNR - Future Systems and Network Regulation
FSO - Fire Safety Order
FSO - Formal Second Opinion
FSO - Fire Safety Officer
FSO - Future System Operator
FSR - Filter Self-Rescuer (Mining)
FSR - Floorspace Ratio
FSSR - flood studies supplementary report
FSSU - Field Scientific Support Unit Now Field Services Unit
FSV - Free Steered Vehicle
FTA - Fault Tree Analysis
FTA - Federal Transit Administration
FTE - Full
FTE - Full-Time Equivalent
FTG - Footing
FTN - Fixed Telecommunications Network
FTP - Framework Travel Plan
FTTC - Fibre to the cabinet
FTTP - Fibre to the premises
FWH - Flexible Working Hours
FWMA - Flood and Water Management Act
FWR - Functional Work Recording System
FYI - Fabrication Yield Improvement
5YHLS - Five Year Housing Land Supply.
FZM - Flood Zone Map (Environment Agency)
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















