Feed-in tariff FIT
Our society is heavily dependent on fossil fuels such as oil, gas and coal, and is likely to remain dependent on them for much of this century. Every year we emit more than 20 billion tonnes of carbon into the atmosphere by burning fossil fuels, half of which is absorbed in the seas and by vegetation, and half of which remains in the atmosphere.
The impact on human and natural systems is potentially irreparable. In addition, as fuels deplete and demand increases, so supplies become more vulnerable to disruption.
The feed-in tariff scheme was introduced by the Government's Department for Energy and Climate Change (DECC) on 1 April 2010. Consumers who generate their own electricity from a renewable or low-carbon source can qualify for a payment (‘Feed-in Tariff’ (FIT)) for each unit of electricity generated.
Allowable technologies are:
- Solar photovoltaic panels.
- Wind turbines.
- Water turbines.
- Anaerobic digestion (biogas energy).
- Micro combined heat and power (micro-CHP).
The installation must have a peak output of no more than 5 megawatts (MW) and must be installed by a certified installer.
The feed-in tariff rate varies depending on:
- The size of the system.
- The generating technology.
- The installation date.
Consumers can also qualify for an ‘export tariff’ by selling surplus electricity back to their supplier. This is estimated as being 50% of the electricity generated for most domestic systems.
The tariffs paid depend on the eligibility date, and for solar photovoltaic panels, if the property’s energy performance certificate (EPC) rating is below ‘D’, then either additional energy saving measures must be taken before solar photovoltaic panels are installed, or a lower tariff will be paid.
Tables showing the latest tariffs are available on the Ofgem website.
NB: On 9 September 2015, following consultation, the government announced that they would remove pre-accreditation for all new participants in the Feed-in Tariff scheme from 01 October. Pre-accreditation allows a developer to lock in the subsidy rate well before major construction work or installation to acquire the necessary planning and environmental permits and grid connections has been completed.
This means that although the subsidy level may have reduced by the time electricity begins to be generated, the developer will receive the higher subsidy agreed when the plant was in the planning stage. Ref gov.uk.
NB: On 31 March 2019, the United Kingdom's Feed-in tariff was discontinued for new applicants. See Smart Export Guarantee SEG.
[edit] Related articles on Designing Buildings
- CHP.
- Domestic micro-generation.
- Electricity supply.
- Energy performance certificates.
- Energy storage - the missing piece?
- Geothermal piles.
- Green deal.
- Green Deal Home Improvement Fund.
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration.
- Microgeneration certification scheme.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Micro-grid.
- On site.
- Private wire arrangement.
- PV inverter.
- Renewable energy.
- Renewable heat incentive.
- Smart Export Guarantee SEG.
- Solar photovoltaics
- Solar thermal systems.
- Wind Energy in the United Kingdom
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.