Disruption claims in construction
In construction contracts, the term 'disruption' refers to a loss of productivity due to a hindrance or interruption of the progress of the construction works which reduces the rate of efficiency.
If disruption is caused by the employer, the contractor may have grounds to seek compensation. Disruption, and claims arising to try and recoup losses incurred from it, are common on construction projects, particularly on larger and more complex projects.
The difference between disruption and delay is that the latter relates to lateness rather than productivity, although they can often be related. Delays can cause disruptions, and vice versa. Despite their inter-relation, they require a different approach to assessing claims.
When evaluating claims for delay, the terms of the specific contract are the usual starting point, and evidence is required that certain circumstances caused the delay. The terms of the contract are less useful when evaluating disruption claims. Instead, the contractor must provide reasonable evidence that:
- Progress of the works has been disrupted.
- Which element of the works and which trades have been disrupted, why losses occurred, and so on.
- The disruption incurred additional costs.
- The cause of the disruption constitutes a breach of contract.
Evidence will normally take the form of documented records demonstrating that disruption caused losses. However, this can prove difficult as the contractor can often not detect disruption until after it has occurred. In addition, isolating the loss of productivity to the cause of the disruption can be difficult as it may coincide with several other factors, and the effect of the disruption may be hidden by other issues.
Several methods can be used to estimate loss in relation to disruption, including:
- Measured mile analysis: Compares actual labour performance between two periods – a normal measured mile period and an impacted period.
- Baseline productivity analysis: A more conservative estimate used when an unimpacted section of the works is too difficult to isolate.
- Earned value analysis: Compares the amount and cost of work that was planned to have been done by a particular stage with the amount that has actually been done and what it has actually cost.
NB The term ‘disruption’ can also refer to the impact of new technologies and techniques on an industry. For more information, see Construction is an industry ripe for tech disruption.
Anticipate, react, recover; Resilient infrastructure systems, published by the National Infrastructure Commission in May 2020, defines disruption as: ‘A disturbance which interrupts the usual functioning of an infrastructure system or service, and its impacts.’
[edit] Related articles on Designing Buildings
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.