Installation
In general, installation is the act of installing something in a fixed, semi-fixed or temporary location. It can also refer to a complete unit which has been installed.
In terms of construction, it often refers to machinery, plant, apparatus, etc., being placed in position or connected for use. Often this can refer to a system or unit with accompanying assemblies, accessories, parts, and so on. It can also include connection to the services which are required to enable the installation to operate.
Installation drawings are developed from co-ordinated detail drawings and present the information needed by trades to install part of the works. This may be particularly important for complex installations such as plant rooms, data centres, ventilation systems, underfloor heating, and so on.
The term installation is often used in conjuction with the specific nature of that installation for example; plumbing installation, gas installation, electrical installation, fire safety installtion, heating installation, colling installation and so on.
The Building Safety Act 2022 refers to “electrical installation” as meaning 'fixed electrical cables or fixed electrical equipment located on the consumer’s side of the electricity supply meter'. (see Section 21 of the Act here)
The BSRIA guide to 'Commissioning Air Systems' (BG 49/2024), written by by Keith Barker and published by BSRIA in March 2024, explains how to commission ducted air distribution systems in buildings. It defines the installation for the purposes of the guide simply as 'A system placed in position as required by the design or specification'.
Setting the bar. A new competence regime for building a safer future. The Final Report of the Competence Steering Group for Building a Safer Future, published in October 2020, defines an installer as: ‘An operative or organisation working, with the appropriate competencies, to place a specific product or system on-site.’
[edit] Related articles on Designing Buildings
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.