Facility condition assessment FCA
[edit] Introduction
A facility condition assessment (FCA) is a complete review of physical building assets based on age, construction techniques, design and materials and so on. In the past, a facility condition assessment was referred to as facilities management audit (FMA or facility management inventory), but this term has subsequently become associated with assets within the building and not the building itself.
[edit] FCA and FMA
There are some areas of overlap between an FCA and an FMA. For instance, methods of gathering data in both instances involve thorough walkthroughs. In addition, FCAs can include interviews and surveys with people who use the building.
Once the information is gathered, the next step is to categorise condition assessment estimates based on established guidelines, such as those presented in the MasterFormat from the Construction Specifications Institute or the ASTM Uniformat II classification system.
The FCA should be acted upon promptly, especially if repairs are urgently required. Like other facility management inventory tools, FCAs require regular updates that reflect changing conditions within the organisation.
[edit] Related articles on Designing Buildings Wiki
- Asset management.
- Benchmarking as business tool.
- Construction Specifications Institute CSI.
- Experience Exchange Report EER.
- Facility condition index FCI.
- Facilities management.
- Facilities management audit FMA.
- MasterFormat.
- Maximising maintenance budgets after lockdown.
- Operational costs.
- Property management.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























