A garage is a common type of single-storey building, typically constructed to adjoin an existing building, and used for keeping vehicles, as storage space, and so on. The method of connection requires careful consideration, in particular, openings between the extension and the existing building (if there are any), junctions with the existing roof structure, the positions of existing flues, drains, and so on.
A garage can also be constructed as an independent structure which is not adjoined to the main building, or it can be incorporated within the main building.
Building Regulations approval is required for building a garage but planning permission may not be in all instances – the local authority should be able to advise as to whether it planning permission is needed or not. As an outbuilding, a garage may be considered a permitted development which will not require planning permission as long as:
- It is not forward of the wall forming the principal elevation.
- It is single-storey with a maximum eaves height of 2.5 m, and maximum overall height of 4 m with a dual-pitched roof, or 3 m for any other roof.
- It has a maximum height of 2.5 m within 2 m of a boundary.
The first stage of building a garage is to develop a design which lays out the dimensions and features in detail. An important consideration is where side access from the main building will be and whether a section of the existing wall will be able to be taken out to allow for the installation of a door. It is also important to establish how vehicles will access the garage, turn and so on.
It will be important, if the garage is to be used for storing a vehicle, that the correct size is ascertained, bearing in mind door opening radii. Typical sizes are 3.5 x 6 m for a single garage, and 6.5 x 6.5 m for a double garage (for two vehicles). The height of the door opening is also an important consideration.
Before beginning construction, the ground must be levelled and the firmness assessed. Hardcore can be used to level and firm up soft ground. Services will also need to be provided for power, drainage and sometimes a water supply.
Some of the topsoil will generally be removed, typically around 6 inches, so that the concrete slab will be level with the surrounding ground. A layer of firm tamped sand should be provided as support for the concrete which will be poured on top. It can be advisable to install a damp-proof membrane if the ground is prone to damp. This should be added to the whole base and also between the concrete and the adjacent wall to avoid damp transfer.
Structural rebar can be installed to reinforce the concrete slab if required, and then the concrete poured and left to cure.
When the foundation has set the walls can be constructed and then the roof built, typically using joists and rafters. Garage roofs are most commonly pitched or flat.
The garage then needs to be wired with electricity and lighting provision, insulated, installed with drywall (if required), and then painted (if required).
The final step is to install the garage door, which can be made of timber, steel or fibreglass. Many are fitted with a remote-control system which automatically raises and closes the door.
[edit] Related articles on Designing Buildings Wiki
- Basements in buildings.
- Building an extension.
- Carport.
- Conservatory.
- External doors.
- Hiring an architect as a domestic client.
- How to build a porch.
- How to find a builder.
- How to lay block paving.
- Incorporating a concrete garage into the landscape
- Loft conversion.
- Outbuildings.
- Permitted development.
- Planning permission.
- Renovation.
- Self-build homes.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.