BSRIA definitions J - Z
This list provides links to definitions created by BSRIA that have been published on Designing Buildings, along with the date added.
This page includes definitions J to Z. Click here to see definitions A to I.
See also a list of articles by BSRIA on Designing Buildings.
- Jointing compound. July 2022.
- Kinetic energy. January 2022.
- KNX. July 2023
- Lead-acid battery. January 2022.
- Life cycle cost model. July 2022.
- Life Cycle Maintenance. July 2022
- Limescale. November 2021
- Linear actuators. August 2023.
- Linear load. October 2024
- Lithium-ion battery. January 2022
- Looping. December 2023.
- LonTalk. July 2023
- LoRaWAN. October 2024
- Low temperature thermal storage. January 2022.
- Low temperature hot water. November 2021
- Lowest working pressure component. November 2022
- Luminaire. July 2021.
- Lump sum cost. July 2022.
- Machine learning. October 2024.
- Machining. September 2024
- Magnetite. November 2021
- Make-up water. November 2021
- Malware. August 2023.
- Manufacturers' drawings. June 2021.
- Maximum demand load shedding. July 2023
- Maximum working pressure. November 2022
- Mechanical interlock. December 2023.
- Mechanical tachometer. January 2024.
- Metabolic rate. March 2023
- Metallic, insulated flexible ductwork. December 2023.
- Metallic, uninsulated flexible ductwork. December 2023.
- Microbially Influenced Corrosion. July 2022.
- Microbiologically influenced corrosion. November 2021
- Microorganism. November 2021
- Milling. September 2024
- Millscale. April 2021.
- Mixed-mode ventilation. July 2021.
- Modbus. July 2023
- Modular boiler. June 2021.
- Motorised on/off valve. May 2023
- National Fire Protection Association. September 2021
- Natural convector. July 2022.
- Net positive suction head. November 2022
- Network hub. August 2023.
- Network router. August 2023.
- Network switch. August 2023.
- Neutral conductor sizing for commercial loads. October 2024
- Neural network. October 2024.
- Neutral point. November 2022.
- Neutral-to-earth voltage. October 2024
- Night setback. July 2023
- Nitrile rubber. July 2022.
- Noise rating. March 2024.
- Nominal Bore. July 2022.
- Non-critical maintenance. July 2022
- Non-linear load. October 2024
- Non-metallic, insulated flexible ductwork. December 2023
- Non-metallic, uninsulated flexible ductwork. December 2023
- Notching. October 2024
- Occupied zone. August 2022.
- OneM2M. October 2024
- Open Connectivity Foundation. October 2024
- Open loop heat pump system. January 2022
- Open protocol. July 2023
- Open vented system. November 2022.
- Operation and maintenance audit. October 2024.
- Operation and maintenance audit plan. October 2024.
- Operation and maintenance auditor. October 2024.
- Operation and maintenance audit toolkit. October 2024.
- Operational audit. October 2024.
- Optical tachometer. January 2024.
- Organisation specific maintenance. July 2022
- Orifice plate (OP) flow measurement device. August 2022.
- Overvoltage. October 2024
- Ozone disinfection. July 2022.
- P-alkalinity. November 2021
- Passivator. April 2021.
- Penetration seal. April 2021.
- Pepper pot corrosion July 2022.
- Perforated air collectors. November 2021
- PHI Low Energy Building Standard. March 2024.
- Photocatalytic filters. August 2022.
- Photoelectric control. July 2023
- Pitot tube. January 2024.
- Pipe closure device. April 2021.
- Pitting. November 2021
- Planned maintenance. March 2024.
- Plasticisation. April 2021.
- Plate heat exchanger. July 2022.
- Potential Energy. January 2022
- Power factor correction. October 2024
- Power fail actuators. August 2023.
- Power frequency variations. October 2024
- Powered flow hood. January 2024.
- Pre-commissioning. January 2024.
- Pre-functional testing. July 2024.
- Pressure and leakage testing. January 2024.
- Pressure independent control valves. April 2021.
- Pressure regulating valve. July 2022.
- Pressurisation unit. November 2022.
- Primary electricity. March 2022.
- Primary filters. August 2022.
- Primary stakeholder. June 2022
- Process carbon dioxide emissions. March 2022.
- Professional team. June 2022
- Project Haystack. October 2024
- Project success criteria. April 2021.
- Proof luminaire. July 2021.
- Proportional balancing. January 2024.
- Proportional control. July 2023
- Proportional plus integral control. July 2023
- Proportional plus integral plus derivative control. July 2023
- Prosumer. March 2024.
- Proxy server. July 2023
- Pseudomonad. April 2021.
- Pulsed input actuator. August 2023.
- Pumped drainage. July 2022.
- Pumped hydro. January 2022.
- Quarter turn ball valve. July 2022.
- Raised access floor. December 2024
- Raised access plenum floor. December 2024
- Rangeability. July 2023
- Rapid voltage changes. October 2024
- Reactive load. October 2024
- Recessed luminaire. July 2021.
- Re-circulation air. August 2022.
- Recurring cost. July 2022.
- Recycled content. March 2022.
- Reduced pressure zone valve. July 2022.
- Regulating flow rates. January 2024.
- Re-usable filters. August 2022.
- Resistive load. October 2024
- Reset control. July 2023
- Reverse cycle heat pump system. January 2022
- Rigid construction. April 2021.
- Roll filter. August 2022.
- Rotating vane anemometer. January 2024.
- Rotary actuators. August 2023.
- Rotary shoe valve. August 2023.
- Room air cleaners. August 2022.
- Room-based heat pump. July 2021.
- Rosette corrosion. July 2022.
- Run to Fail Maintenance. July 2022.
- Savings-to-investment ratio. July 2022.
- Seasonal commissioning. January 2024.
- Second fix. March 2024.
- Second party operation and maintenance audit. October 2024.
- Secondary filters. August 2022.
- Secondary stakeholder. June 2022
- Security tracking. July 2023
- Self-discharge. January 2022
- Sentinel taps. July 2022.
- Sensitivity studies. October 2024.
- Sequestrant. April 2021.
- Serogroup. July 2022.
- Service support construction. April 2021.
- Sewage heat pump. January 2022.
- Shower mixers. July 2022.
- Simulation. October 2024.
- Single opening. April 2021.
- Single-phase v three-phase ac current systems. August 2021
- Single-sided ventilation. July 2021.
- Singularity. October 2024.
- Sintering. September 2024
- Sleeve. April 2021.
- Smart actuators. August 2023.
- Smart hub. July 2023
- Smart smoke sensors. August 2023.
- Smart temperature sensor. August 2023.
- Smart thermostat. August 2023.
- Soft water. November 2021
- Solar air heating. November 2021
- Solar cooling. November 2021
- Solar water heating. November 2021
- Soldering flux. July 2022.
- Spa pool. July 2022.
- Specific fan power. July 2024
- Spring actuators. August 2023.
- Spyware. August 2023.
- Stage 2 cost plan. June 2021.
- Stage 2 design report. June 2021.
- Stage 3 cost plan. June 2021.
- Stage 3 design report. June 2021.
- Stagnation. July 2022.
- Static completion. January 2024.
- Static height. November 2022.
- Static pressure. July 2024.
- Stereolithography. September 2024.
- Sterilise. July 2022.
- STL file. September 2024
- Strategic operation and maintenance audit. October 2024.
- Stop valve. July 2022.
- Stroboscope. January 2024.
- Strong AI. October 2024.
- Study period. July 2022
- Subtractive manufacturing. September 2024
- Success criteria. June 2021.
- Surface water cooling. November 2021
- Surfactant. April 2021.
- Susceptible population. July 2022.
- Suspended solids. November 2021
- Sustained interruptions. October 2024
- System boundaries. March 2022
- System expansion. March 2022.
- System lag. July 2023
- Temperature and pressure relief valve July 2022.
- Terminal. August 2022.
- Thermal anemometer. January 2024.
- Thermal response. August 2022.
- Thermoelectric actuators. August 2023.
- Thermostatic bypass valve. July 2022.
- Thermostatic radiator valve. May 2023.
- Thermosyphon. November 2021
- Three-port motorised valve. July 2023
- Three-port control valve. June 2023
- Three-port valve. June 2021.
- Total dissolved solids. November 2021
- Total pressure. July 2024.
- Total viable count. November 2021
- Transient voltage. October 2024
- Transformer. July 2021.
- Tri-generation. November 2021
- Triplen harmonics. October 2024
- Trojans. August 2023.
- Trunking. April 2021.
- Tubercle. November 2021
- Turing test. October 2024.
- Turning. September 2024
- Two-port control valve. June 2023
- Two-port motorised valve. July 2023
- Two-port valve. June 2021.
- Two-port (variable flow) control strategy. July 2022.
- Ultraviolet disinfection. July 2022.
- Ultraviolet germicidal irradiation. August 2022.
- Under-deposit corrosion. November 2021
- Underfloor void. December 2024
- Undervoltage. October 2024
- Universal input. July 2023
- Universal output. July 2023
- Up-and-down luminaire. July 2021.
- Upstream burden. March 2022.
- Vacuum relief valve. July 2022.
- Value engineering report. April 2021.
- Valve authority. March 2024.
- Valve characterisation. June 2023
- Variable gas cushion expansion vessel. November 2022.
- Variable occupancy controller. July 2021.
- Velocity pressure. July 2024.
- Virus. August 2023.
- Voltage interruptions. October 2024
- Voltage sag. October 2024
- Voltage swell. October 2024
- Waste product. March 2022.
- Waste-to-energy. January 2022.
- Water fittings. July 2022.
- Water stratification. July 2022.
- Water treatment programme. November 2021.
- Water undertaker. November 2022.
- Waveform distortion. October 2024
- Waveform distortion noise. October 2024
- Weak AI. October 2024.
- Weight sensor. November 2022.
- Witnessing authority. January 2024.
- Written scheme. July 2022.
--BSRIA
Featured articles and news
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.