Seasonal commissioning
The CIBSE Commissioning Codes generally use the following description to define ‘commissioning’: ‘The advancement of an installation from the state of static completion to full working order to specified requirements. It includes the setting to work of an installation, the recording of set values and performance for future reference, and the regulation of the system.’
The concept of seasonal commissioning recognises that some aspects of the systems need to be commissioned when the external temperatures and indoor occupancy patterns are close to the peak conditions for which the system was designed.
Seasonal commissioning is the performance evaluation of a building and its engineering services under full load conditions during peak heating and cooling seasons, as well as part-load conditions in spring and autumn.
Ref Seasonal Commissioning (BG 44/2013), written by Sands J and published by BSRIA in January 2013.
NB BG 88 Commissioning Responsibilities Framework, by Matt Lowry, published by BSRIA in January 2025, defines seasonal commissioning as: ‘The performance evaluation of a building and its engineering services under full load conditions during peak heating and cooling seasons, as well as part-load conditions in spring and autumn.’
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.
CIAT confirm the winners of the 2026 architectural technology awards.
Government launches a one stop shop for flood preparedness.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.