BSRIA definitions A - I
This list provides links to definitions created by BSRIA that have been published on Designing Buildings, along with the date added.
This page includes definitions A to I. Click here to see definitions J to Z.
See also a list of articles by BSRIA on Designing Buildings.
- Ablative batt. April 2021.
- Absolute pressure. November 2022
- Absorption chiller. November 2021
- Absorption cooling. November 2021
- Accelerator heater. June 2023
- Acceptance factor. November 2022
- Acoustic camera. December 2023
- Acoustic flexible ductwork. December 2023
- Activated carbon filters. August 2022.
- Adenosine triphosphate. November 2021
- Adhesive anchor. December 2023.
- Adsorption cooling. November 2021
- AECB CarbonLite Building Standards. March 2024
- Aerobic. November 2021
- Aerobic count. July 2022.
- Air capture hood. January 2024.
- Air changes per hour. March 2024.
- Air turbulence. March 2023
- Alkalinity. November 2021
- Alpha-beta brass. November 2021
- Ambient loop heat pump system. January 2022
- American National Standards Institute. September 2021
- American Society of Heating and Air-conditioning Engineers. September 2021
- Amoeba. July 2022.
- Analogue control systems. July 2022.
- Analogue input. June 2023
- Analogue output. June 2023
- Anion. November 2021
- Annular space. April 2021.
- Anode. November 2021
- Antiflash margin. November 2022
- Antifreeze. November 2022
- Antigravity loop. November 2022
- Appliance isolation valve. July 2022.
- Approach temperature. July 2022.
- As-built data. June 2022
- As-installed drawing. March 2024.
- Atmospheric boiler. June 2021.
- Automat. November 2022.
- Automatic air vent. July 2022.
- BACnet. August 2023.
- Ball valve. June 2021.
- Barometric pressure. March 2023
- Base case: July 2022
- Basin isolation valve. July 2022.
- Batten luminaire. July 2021.
- Biocide. April 2021.
- Biogenic. March 2022
- Biomass CHP. November 2021
- Bladder. November 2022
- Blow-down. July 2022.
- Break tank. November 2022
- British Standard Pipe. July 2022.
- Builders’ work details. June 2021.
- Building energy management system v building management system. June 2023
- Building services concept design model. May 2021.
- Building services concept schematics. May 2021.
- Building services concept sketch drawings. May 2021.
- Building services contractor. May 2021.
- Building services developed design schematics. May 2021.
- Building services plant. August 2022.
- Building services technical design model. May 2021.
- Busbar. April 2021.
- Butterfly valve. June 2021.
- By-product. March 2022.
- Cable carrier. April 2021.
- Capital energy. March 2022
- Cascade control. July 2023
- Category A fit-out works. August 2021
- Category B fit-out works. August 2021
- Cathode. November 2021
- Cation. November 2021
- Cavitation. November 2021
- Cavity collector. November 2021
- Central plant. August 2022.
- Charged-media non-ionising filters. August 2022.
- Chelant. April 2021.
- Chemical cleaning. January 2024.
- Chlorinate. July 2022.
- Chlorine dioxide. July 2022.
- Circuit breaker. July 2021.
- Clash. May 2021.
- Cleanliness quality class. December 2023.
- Closed loop heat pump system. January 2022.
- Coefficient of expansion. November 2022
- Co-product. March 2022
- Coincidence factor. July 2022.
- Cold aisle containment. March 2024
- Cold smoke. April 2021.
- Collar. April 2021.
- Colour changing controls. August 2023.
- Colour temperature. July 2021.
- Commissionability December 2023.
- Commissionable system. December 2023.
- Commissioning management. December 2023.
- Commissioning set. June 2023
- Commissioning specialist. December 2023.
- Commissioning specification. December 2023.
- Compensators. July 2021.
- Compliance maintenance. July 2022
- Compressed air energy storage. January 2022.
- Condensation pipework. August 2022.
- Condition monitoring. July 2022.
- Constant flow regulator. August 2022.
- Constant volume damper. January 2024.
- Constant volume system. August 2022.
- Continuous commissioning. January 2024.
- Control damper. August 2023.
- Controller. July 2022.
- Coordinated-generic technical design model. May 2021.
- Coordinated-specific technical design model. May 2021.
- Copper / silver ionisation. July 2022.
- Corrective maintenance. March 2024
- Corrosion coupon. November 2021
- Corrosion inhibitor. November 2021
- Cradle. March 2022
- Crevice corrosion. November 2021
- Cyclic stress. July 2022.
- Dead zone. July 2023.
- Deaerator. November 2021
- Decentralised plant. August 2022.
- Delivered energy. March 2022
- Demand-controlled ventilation. August 2022.
- Desiccant cooling. November 2021
- Design criteria. December 2023.
- Detergent. April 2021.
- Dezincification. November 2021
- Differential pressure anemometer. January 2024.
- Differential pressure control valve. April 2021.
- Digital Addressable Lighting Interface. July 2023.
- Digital input. July 2023.
- Digital output. July 2023.
- Dip slide. November 2021
- Direct digital control systems. July 2021.
- Direct heat interface unit. July 2022.
- Dispersants. April 2021.
- Display lighting. July 2021.
- Domestic water services. July 2022.
- Double regulating valve. August 2022.
- Downlighter. July 2021.
- Downstream impacts. March 2022.
- Drain valve. July 2022.
- Drift eliminator. July 2022.
- Drinking fountain. July 2022.
- Dual-fuel boiler. June 2021.
- Electric current. July 2021.
- Electric quartz heaters. July 2021.
- Electrolyte. January 2022
- Entropy. January 2022
- Electrostatic filters. August 2022.
- Electronically positioned actuators. August 2023.
- EnerPHit Standard. March 2024
- Environmental monitoring. June 2022
- Equivalent annual cost. July 2022
- European Assessment Document. April 2021.
- Exhaust air vs extract air. August 2022.
- Expansion anchor. December 2023.
- Fan convector. July 2022.
- Feasible-generic technical Design model. May 2021.
- Feedstock energy. March 2022.
- Field device. July 2023.
- Fill water. November 2021
- Fixed gas cushion expansion vessel. November 2022
- Flat face seal. July 2022.
- Flexible construction. April 2021.
- Flexible ductwork December 2023.
- Float valve. July 2022.
- Flocculant. April 2021.
- Flow battery. January 2022
- Flow characteristic. April 2021.
- Flow coefficient. July 2023.
- Flow regulating valve. July 2022.
- Flushing. January 2024.
- Flywheel. January 2022
- Forced-draught boilers and induced-draught boilers. June 2021.
- Four-port control valve. June 2023
- Four-port valves. June 2021.
- Free cooling. August 2022.
- Front end. July 2023.
- Function critical maintenance. July 2022
- Functional specification. August 2023.
- Future value. July 2022.
- Gas absorption heat pump. January 2022
- Gas-fired plaque heaters. July 2021.
- Gas-fired radiant-tube heaters. July 2021.
- Gasification. November 2021
- Gate valve. June 2021.
- Gateway device. July 2023.
- Gauge pressure. November 2022
- Gateway protocol. August 2023.
- Globe valve. August 2023.
- Graphical user interface. July 2023
- Gravity drainage. July 2022.
- Hard water. November 2021
- Head end. July 2023.
- Health Technical Memorandum. May 2021.
- Heat substation. July 2022.
- Heating and cooling diversity. January 2024.
- Heating value. March 2022.
- Heat network mains. July 2022.
- High-bay luminaire. July 2021.
- High temperature heat network. July 2022.
- High temperature thermal storage. January 2022.
- Hold point. June 2022.
- Hot water radiant panels. July 2021.
- Hot water radiant-strip heating. July 2021.
- Human-machine interface. July 2023
- Hydronic system. March 2024.
- Hypocaust. November 2021
- Intermediate vessel. November 2022
- Indirect heat interface unit. July 2022.
- Inductive tachometer. January 2024.
- Inhibitor. April 2021.
- Initial project brief. April 2021.
- Initial success criteria. April 2021.
- Installation model. June 2021.
- Integral control. July 2023
- Integrated control system. July 2021.
- International Electrotechnical Commission. September 2021
- International Telecommunication Union. September 2021
- Ion. January 2022
- Ion exchange plant. November 2021.
--BSRIA
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.