BSRIA Power quality guide (AG 2/2000) was written by C C Pearson and V Uthayanan and published by BSRIA in July 2000. It states:
Variations in supply voltage outside the normally accepted limits of ± 10% are subdivided according to the length of the variation.
Long duration variations encompass rms deviations at power frequencies for longer than one minute. EN 50160 specifies the steady state voltage tolerances expected on a power system. A voltage variation is considered to be of long duration when the limits are exceeded for more than 3 minutes (the international standards use a period of one minute).
Long duration variations can be:
- sustained interruptions
- undervoltages
- overvoltages.
Overvoltages and undervoltages generally are not the result of system faults, but are caused by load variations on the system and system switching operations. Such variations are typically displayed as plots of rms voltage versus time.
An overvoltage is an increase in the rms ac voltage greater than 110% at the power frequency for a duration longer than 3 minutes.
Overvoltages are usually the result of load switching (e.g. switching off a large load, or energizing a capacitor bank). The overvoltages result because the system is either too weak for the desired voltage regulation or voltage controls are inadequate. Incorrect tap settings on transformers can also result in system overvoltages.
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.