User contributions
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
- 16:22, 31 October 2011 (diff | hist) Adjudication in construction contracts
- 16:17, 31 October 2011 (diff | hist) Building regulations
- 15:45, 31 October 2011 (diff | hist) Get started - top tips and help
- 15:21, 31 October 2011 (diff | hist) Traditional contract: business justification
- 15:20, 31 October 2011 (diff | hist) N Category:Traditional contract (Created page with "Category:Free_Work_Plans") (top)
- 15:20, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 14:51, 31 October 2011 (diff | hist) Environmental impact assessment EIA
- 14:48, 31 October 2011 (diff | hist) Detailed planning application
- 14:47, 31 October 2011 (diff | hist) Appointing consultants for building design and construction
- 14:05, 31 October 2011 (diff | hist) N Management structure for construction clients (Created page with "The management structure describes how the client intends to organise itself for the proposed project: *Appint a project director (senior responsible owner in the public sector)...")
- 13:19, 31 October 2011 (diff | hist) N Management contractor (Created page with "See also management contract: oultine work plan. Management contracting is a procurement route in which the works are constructed by a number of different works contractors who ...")
- 13:14, 31 October 2011 (diff | hist) N Loss and expense (Created page with "Construction contracts will generally provide for the contractor to claim direct loss and/or expense that has resulted by the progress of the works being materially affected by r...")
- 13:08, 31 October 2011 (diff | hist) N Legal agreements for design and construction (Created page with "Listed below are the draft heads of terms for likely legal agreements: *Procurement and contract strategy with carefully thought out risk allocation (many of these methods can b...")
- 12:51, 31 October 2011 (diff | hist) m Construction contract (moved Contracts to Contract)
- 12:50, 31 October 2011 (diff | hist) N Lead designer (Created page with "The role of lead designer is identified in some forms of contract and appointment such as: *[http://www.cic.org.uk/activities/liabilityCC.shtml The Construction Industry Council...")
- 12:44, 31 October 2011 (diff | hist) N Latent defects (Created page with "It is the nature of construction projects that faults and defects caused by failures in design, workmanship or materials, may not become apparent or readily detectable (even with...")
- 12:40, 31 October 2011 (diff | hist) N Liquidated damages in construction contracts (Created page with "Liquidate damages (or liquidated and ascertained damages) are not penalties, they are pre-determined damages set at the time the contract is entered into based on a calculation o...")
- 12:37, 31 October 2011 (diff | hist) N Lead consultant for building design (Created page with "The role of lead consultant is identified in some forms of appointment such as: *[http://www.cic.org.uk/activities/liabilityCC.shtml The Construction Industry Council (CIC) cond...")
- 12:32, 31 October 2011 (diff | hist) N Key performance indicators KPI (Created page with "Key performance indicators can be used to: *Monitor costs. *Track progress. *Assess client satisfaction. *Identify strengths & weaknesses. *Compare performance across and be...")
- 12:29, 31 October 2011 (diff | hist) N Invitation to negotiate for PFI (Created page with "The invitation to negotiate for private finance initiative (PFI) projects is equivalent to the invitation to tender for traditional contracts. It sets out the project particulars...")
- 12:25, 31 October 2011 (diff | hist) N Invitation to tender for construction contracts (Created page with "An invitation to tender is a formal invitation to make an offer for the supply of goods or services. An invitation to tender might be issued for a range of contracts, including: ...")
- 12:18, 31 October 2011 (diff | hist) N Investment decision maker for building design and construction (Created page with "On publicly-funded projects following the [http://webarchive.nationalarchives.gov.uk/20100503135839/http://www.ogc.gov.uk Office of Government Commerce ](OGC) ( now part of the n...")
- 11:51, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:47, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:45, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:41, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:40, 31 October 2011 (diff | hist) Public project: outline work plan
- 11:38, 31 October 2011 (diff | hist) Public project: outline work plan
- 11:32, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:26, 31 October 2011 (diff | hist) Construction management: outline work plan
- 11:24, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:18, 31 October 2011 (diff | hist) N Category:Management contract (Created page with "Category:Free_Work_Plans") (top)
- 11:16, 31 October 2011 (diff | hist) N Management contract: outline work plan (Created page with "An outline work plan for a project following a management contract procurement route is presented below. Clicking on any of the stages will open up the detailed tasks which the i...")
- 11:11, 31 October 2011 (diff | hist) N Category:Construction manager (Created page with "Category:Free_Work_Plans") (top)
- 11:10, 31 October 2011 (diff | hist) N Construction management: outline work plan (Created page with "An outline work plan for a project following a construction management / management contract procurement route is presented below. Clicking on any of the stages will open up the ...")
- 10:54, 31 October 2011 (diff | hist) N Category:Design and build (Created page with "Category:Free_Work_Plans") (top)
- 10:52, 31 October 2011 (diff | hist) Design and build: outline work plan
- 10:51, 31 October 2011 (diff | hist) N Design and build: outline work plan (Created page with "An outline work plan for a design and build procurement route (in the private sector) is presented below. Clicking on any of the stages will open up the detailed tasks which the ...")
- 10:35, 31 October 2011 (diff | hist) Public project: business justification
- 10:35, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:30, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:28, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:24, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:21, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:20, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:15, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:11, 31 October 2011 (diff | hist) m Appointing consultants for building design and construction (moved Appointments to Appointment)
- 10:08, 31 October 2011 (diff | hist) Public project: business justification
- 10:07, 31 October 2011 (diff | hist) Public project: business justification
- 10:05, 31 October 2011 (diff | hist) Public project: business justification
- 10:05, 31 October 2011 (diff | hist) Public project: business justification
- 10:01, 31 October 2011 (diff | hist) Public project: business justification
- 10:00, 31 October 2011 (diff | hist) Public project: business justification
- 09:56, 31 October 2011 (diff | hist) Public project: business justification
- 09:54, 31 October 2011 (diff | hist) Public project: business justification
- 09:51, 31 October 2011 (diff | hist) N Public project: business justification (Created page with "NB There is no equivalent RIBA stage because business justification takes place before the appointment of an architect. Publicly funded projects are required by the Office of Go...")
- 09:38, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:37, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:36, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:33, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:31, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:28, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:24, 31 October 2011 (diff | hist) Public project: outline work plan
- 09:20, 31 October 2011 (diff | hist) N Public project: outline work plan (Created page with "Public project: outline work plan<br>An outline work plan for a traditional procurement route / fully designed project is presented below. Clicking on any of the stages will open...")
- 08:14, 31 October 2011 (diff | hist) N User:Designing Buildings (Created page with "test")
- 14:00, 29 October 2011 (diff | hist) Integrated project team
- 13:59, 29 October 2011 (diff | hist) Integrated project team
- 13:45, 29 October 2011 (diff | hist) N File:Integr2.jpg (integrated project team) (top)
- 13:43, 29 October 2011 (diff | hist) N Integrated project team (Created page with "Integrated project team<br>Integrated project team is a term used by OGC (The Office of Government Commerce, now part of the new Efficiency and Reform Group (ERG) within the Cabi...")
- 13:42, 29 October 2011 (diff | hist) N Interim certificates in construction contracts (Created page with "Interim certificates provide a mechanism for the client to make payments to the contractor before the works are complete. [http://www.legislation.gov.uk/ukpga/1996/53/contents Th...")
- 13:35, 29 October 2011 (diff | hist) N Initial cost appraisal for design and construction (Created page with "Cost plans are generally prepared by cost consultants (often quantity surveyors). They evolve through the life of the project, developing in detail and accuracy as more informati...")
- 13:31, 29 October 2011 (diff | hist) N Information release schedule for construction (Created page with "If not all the information required to construct the building has been prepared or issued when the tender documentation is prepared or the contract executed, then an information ...")
- 13:28, 29 October 2011 (diff | hist) N Independent client adviser for building design and construction (Created page with "Publicly funded projects are required by the Office of Government Commerce (OGC) to follow the OGC gateway procedure and to adopt either a design and build, private finance initi...")
- 13:15, 29 October 2011 (diff | hist) CDM 2007 Health and safety file
- 13:14, 29 October 2011 (diff | hist) CDM 2007 Health and safety file
- 13:13, 29 October 2011 (diff | hist) CDM 2007 Health and safety file
- 13:13, 29 October 2011 (diff | hist) N CDM 2007 Health and safety file (Created page with "[http://www.legislation.gov.uk/uksi/2007/320/regulation/20/made The Construction (Design and Management) Regulations] <span id="fck_dom_range_temp_1319893726309_533" /><span...")
- 13:06, 29 October 2011 (diff | hist) Health and safety for building design and construction
- 13:05, 29 October 2011 (diff | hist) Health and safety for building design and construction
- 12:55, 29 October 2011 (diff | hist) N Handing over possession of the construction site to the contractor (Created page with "On commencement of the contract, the client hands over possession of the site (and contractor's work area(s)) to the contractor. A formal handover meeting is an opportunity to:...")
- 12:51, 29 October 2011 (diff | hist) N Handover of the construction site to the client (Created page with "The handover of the site to the client takes place once the contractor has confirmed that the works defined in the contract are complete and may take place during a handover meet...")
- 12:47, 29 October 2011 (diff | hist) N Funding prospectus for new developments (Created page with "It is rare in the private sector for the client to provide all the funding of its capital projects. In the public sector, the government has sought to use external funding for it...")
- 16:48, 28 October 2011 (diff | hist) Adjudication in construction contracts
- 16:30, 28 October 2011 (diff | hist) Editorial policy
- 16:28, 28 October 2011 (diff | hist) Help:Editing
- 16:27, 28 October 2011 (diff | hist) N Funding options for building developments (Created page with "A preliminary assessment of funding options should be carried out whne considering whether to proceed with a project. This assessment might consider: *Budget. *Draw down facili...")
- 16:23, 28 October 2011 (diff | hist) N Fluctuations in construction contracts (Created page with "Fluctuations are a way of dealing with inflation on large projects that may last for several years. On smaller projects, the contractor will be considered to have taken into acco...")
- 16:16, 28 October 2011 (diff | hist) N Final certificate for construction contracts (Created page with "The final certificate is certification by the contract administrator that the contract has been fully completed. It is issued at the end of the defects liability period and has t...")
- 16:12, 28 October 2011 (diff | hist) N Feasibility studies for construction projects (Created page with "Feasibility studies do not involve 'design' as such. They are preliminary studies whose purpose is to: *Establish whether the project is viable. *Assist in the development of th...")
- 16:08, 28 October 2011 (diff | hist) N Extension of time EOT in construction contracts (Created page with "Many construction contracts allow the construction period to be extended where there are delays that are not the contractor's fault. Some contracts allow the an extension of time...")
- 16:02, 28 October 2011 (diff | hist) Employer's agent for design and build
- 16:01, 28 October 2011 (diff | hist) Domestic sub-contractor
- 16:00, 28 October 2011 (diff | hist) Construction contractor
- 15:59, 28 October 2011 (diff | hist) Types of consultant in the construction industry
- 15:59, 28 October 2011 (diff | hist) Construction manager
- 15:58, 28 October 2011 (diff | hist) CDM co-ordinator
- 15:55, 28 October 2011 (diff | hist) Client's representative
- 15:53, 28 October 2011 (diff | hist) Cost consultant
- 15:52, 28 October 2011 (diff | hist) Architect
- 15:51, 28 October 2011 (diff | hist) N Category:Products / components (Created page with "Category:Design")
- 15:50, 28 October 2011 (diff | hist) N Equipment installed in buildings (Created page with "It is important to identify equipment that will be provided within the main contract and equipment which, whilst it may be provided outside of the main contract (because the clie...")
- 15:47, 28 October 2011 (diff | hist) N Environmental impact assessment EIA (Created page with "[http://www.legislation.gov.uk/uksi/1999/293/made The Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999]<br>set out a requirem...")
- 15:39, 28 October 2011 (diff | hist) N Terms and Conditions (Created page with "we or others may alter or remove text you have contributed for reasons of editorial quality, content or accuracy<br>the locking of articles by registered users is subject to revi...")
- 15:39, 28 October 2011 (diff | hist) Editorial policy
- 15:37, 28 October 2011 (diff | hist) N Help:Editing (Created page with "see also quick style guide")
- 15:35, 28 October 2011 (diff | hist) Editorial policy
- 15:33, 28 October 2011 (diff | hist) Editorial policy
- 15:32, 28 October 2011 (diff | hist) N Editorial policy (Created page with "A guide to the use of language on designing buildings wiki. The quality of this website is dependent on you. When you are writing an article for designing buildings wiki pleas...")
- 15:27, 28 October 2011 (diff | hist) Get started - top tips and help
- 15:24, 28 October 2011 (diff | hist) m Get started - top tips and help (Protected "Help" ([edit=sysop] (indefinite) [move=sysop] (indefinite)))
- 15:11, 28 October 2011 (diff | hist) Appointing consultants for building design and construction
- 15:10, 28 October 2011 (diff | hist) Appointing consultants for building design and construction
- 15:09, 28 October 2011 (diff | hist) Appointing consultants for building design and construction
- 14:26, 28 October 2011 (diff | hist) Business case for construction projects
- 13:56, 28 October 2011 (diff | hist) Construction contractor
- 08:48, 28 October 2011 (diff | hist) N Category:Client procedures (Created page with "Category:Procedures") (top)
- 08:47, 28 October 2011 (diff | hist) N Energy targets for buildings (Created page with "Minimum standards for the conservation of fuel and power are set out in part L of the building regulations. The broad aim of the 2010 Part L is to reduce building CO2 emissions b...")
- 08:17, 28 October 2011 (diff | hist) Energy certificates for buildings
- 07:56, 28 October 2011 (diff | hist) N Energy certificates for buildings (Created page with "The [http://www.legislation.gov.uk/uksi/2010/1456/contents/made Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations ]require energy cer...")
- 07:45, 28 October 2011 (diff | hist) N Employer's requirements for building design and construction (Created page with "Employer's requirements are typically used on design and build projects (such as Joint Contracts Tribunal (JCT) BD 05) or on a traditional contract where the contractor is to des...")
- 06:00, 28 October 2011 (diff | hist) N Employer's agent for design and build (Created page with "In construction the term 'employer's agent' is used to describe an agent acting on behalf of the client as the contract administrator for design and build contracts (such as the ...")
- 05:56, 28 October 2011 (diff | hist) N Category:Sustainability (Created page with "Category:Design")
- 05:55, 28 October 2011 (diff | hist) Target emission rate TER
- 05:51, 28 October 2011 (diff | hist) N Elemental cost plan for design and construction (Created page with "Key cost planning information prepared by the cost consultant include: *Initial cost appraisals of options (feasibility studies) *Elemental cost plan (from project brief throu...")
- 05:46, 28 October 2011 (diff | hist) N Easements (Created page with "An easement is a right which a person has over land which owned by someone else. Easements are normally attached to the land rather than to a person and can be considered to last...")
- 05:40, 28 October 2011 (diff | hist) N Earned value for construction contracts (Created page with "Earned value analysis is a technique used to assess project progress by comparing the amount and cost of work that was planned to have been done by a particular stage with the am...")
- 17:29, 27 October 2011 (diff | hist) N Domestic sub-contractor (Created page with "A domestic sub contractor is any sub contractor other than a nominated sub contractor, that the main contractor sub contracts to carry out part of the works. Contractually, this ...")
- 17:26, 27 October 2011 (diff | hist) Document control in building design and construction
- 17:26, 27 October 2011 (diff | hist) Document control in building design and construction
- 17:25, 27 October 2011 (diff | hist) Document control in building design and construction
- 17:21, 27 October 2011 (diff | hist) N Detailed planning application (Created page with "Before making a planning application it is important to check with the local planning authority; when planning meetings are held and the what the procedures are. A detailed plan...")
- 17:12, 27 October 2011 (diff | hist) N Detailed design report (Created page with "The detailed design report is prepared when the design is detailed but has yet to be packaged. The detailed design report might include: *Design and access statement. *Site la...")
- 17:11, 27 October 2011 (diff | hist) Detailed design stage in building design
- 17:09, 27 October 2011 (diff | hist) N Detailed design stage in building design (Created page with "NB. Within designing buildings wiki, detailed design is equivalent to RIBA stages D: design development and E: technical design. For further information see the detailed design w...")
- 17:02, 27 October 2011 (diff | hist) N Designers for buildings and other built assets (Created page with "In the first instance, designers are likely to be members of the consultant team appointed by the client. Typically, this will include and architect, structural engineer and serv...")
- 16:59, 27 October 2011 (diff | hist) Design quality for buildings
- 16:59, 27 October 2011 (diff | hist) Design review
- 16:57, 27 October 2011 (diff | hist) Design review
- 16:56, 27 October 2011 (diff | hist) Design quality for buildings
- 16:55, 27 October 2011 (diff | hist) N Design quality for buildings (Created page with "The client should appoint an internal senior design champion to be responsible for ensuring the design meets the required standard. The design champion’s role is to ensure that...")
- 16:39, 27 October 2011 (diff | hist) N Risk management for building design (Created page with "The process of design risk management is a requirement of the CDM (The Construction (Design and Management) Regulations 2007 ). The key aim of CDM2007 '...''is to integrate heal...")
- 16:30, 27 October 2011 (diff | hist) N Design review (Created page with "Regular design reviews should be co-ordinated by the lead designer (or integrated supply team on publicly-funded projects). These reviews may include the consultant team, client,...")
- 16:25, 27 October 2011 (diff | hist) N Design and build procurement route (Created page with "Design and build is a route in which the main contractor is appointed to design and construct the works as opposed to a traditional contract where the client appoints consultants...")
- 16:21, 27 October 2011 (diff | hist) N Design and access statement (Created page with "A design and access statement for a planning application should explain the design principles and concepts that have been applied to particular aspects of the proposal design and...")
- 16:16, 27 October 2011 (diff | hist) N Defects liability period DLP (Created page with "The defects liability period (now called the 'rectification period' in Joint Contracts Tribunal (JCT) contracts) begins upon certification of practical completion and typically l...")
- 16:15, 27 October 2011 (diff | hist) Defects in construction
- 16:13, 27 October 2011 (diff | hist) N Defects in construction (Created page with "Defects are aspects of the works that are not in accordance with the contract. Defects can be 'patent' or 'latent'. Patent defects are those which can be discovered by reasonable...")
- 16:03, 27 October 2011 (diff | hist) Contract sum
- 16:02, 27 October 2011 (diff | hist) N Final account (Created page with "Cost plans are generally prepared by cost consultants (often quantity surveyors). They evolve through the life of the project, developing in detail and accuracy as more informati...")
- 16:00, 27 October 2011 (diff | hist) N Cost plans for construction projects (Created page with "Cost plans are generally prepared by cost consultants (often quantity surveyors). They evolve through the life of the project, developing in detail and accuracy as more info...")
- 15:50, 27 October 2011 (diff | hist) N Cost consultant (Created page with "Typically cost consultants are quantity surveyors by profession, but accountants and other professionals may also be effective cost consultants. The cost consultant provides esti...")
- 15:48, 27 October 2011 (diff | hist) N Contract sum (Created page with "The contract sum is the price that the client has agreed to pay for the works described in the contract documents. The contract sum may be subject to adjustment under the terms...")
- 15:46, 27 October 2011 (diff | hist) Construction contract
- 15:35, 27 October 2011 (diff | hist) N Category:Procurement (Created page with "Category:Procedures") (top)
- 15:34, 27 October 2011 (diff | hist) N Contractor's proposals for building design and construction (Created page with "Contractors proposals are prepared by tenderers for design and build projects (or on a traditional contract where the contractor is to design discrete parts of the works) as a re...")
- 15:25, 27 October 2011 (diff | hist) N Contractor's master programme (Created page with "Contracts such as the the Joint Contracts Tribunal (JCT) Standard form of building contract require that the contractor produces for the contract administrator a contractor’s m...")
- 15:24, 27 October 2011 (diff | hist) N Construction contractor (Created page with "A contractor is appointed by the client to construct all or part of the project. Continuity of construction activity after the post war era of reconstruction in combination with ...")
- 15:20, 27 October 2011 (diff | hist) N Contract documents for construction (Created page with "On a traditional, fully-designed project, the contract documents may include: *Articles of agreement and conditions of contract for completing as a simple contract (or as a deed...")
- 15:13, 27 October 2011 (diff | hist) N Construction contract conditions (Created page with "Disputes procedure<br>Phased handover requirements<br>Information schedule (dates by which the Contractor needs certain sets of information)<br>Liquidated and ascertained damages...")
- 15:10, 27 October 2011 (diff | hist) N Contract administrator for construction contracts (Created page with "The contract administrator is the individual responsible for administering the construction contracts. The contract administrator is likely to be the architect, and indeed the JC...")
- 07:04, 27 October 2011 (diff | hist) Traditional contract: business justification
- 07:00, 27 October 2011 (diff | hist) Traditional contract: business justification
- 05:54, 27 October 2011 (diff | hist) Construction contract
- 05:38, 27 October 2011 (diff | hist) N Contingency plan (Created page with "Contingency plans are plans than could be enacted to mitigate project risks identified during risk assessment if those risks increase or actualise. Predictable risks that could...")
- 05:36, 27 October 2011 (diff | hist) N Contingencies in construction (Created page with "Contingencies are downside risk estimates generally applied to cost planning and timescales. Percentages applied are at their greatest in the concept stages of a project and are ...")
- 05:34, 27 October 2011 (diff | hist) N Consultation process (Created page with "This article refers to external consultation processes. For internal consultations see user panels and stakeholders. On large or sensitive projects it may be desirable to carry ...")
- 05:23, 27 October 2011 (diff | hist) N Consultant's proposals for design and construction (Created page with "A document requesting consultant's proposals sometimes called a 'request for proposals' should be collated and sent out to each prospective consultant listing the assumptions upo...")
- 05:20, 27 October 2011 (diff | hist) N Consultant team start-up meeting (Created page with "A consultant team start-up meeting should be chaired by the client and attended by the consultant team. It is an opportunity to agree working methods, along with means for report...")
- 05:17, 27 October 2011 (diff | hist) N Types of consultant in the construction industry (Created page with "Consultants may be appointed by the client to provide advise on the development of the project, to develop and co-ordinate the design, prepare production information and tender d...")
- 05:14, 27 October 2011 (diff | hist) N Construction stage report (Created page with "The construction stage report is prepared by the contract administrator at the end of the construction stage. It is the final construction progress report and as such may include...")
- 05:12, 27 October 2011 (diff | hist) Construction progress report
- 05:11, 27 October 2011 (diff | hist) N Construction progress report (Created page with "Construction progress reports are prepared regularly (often monthly) during the construction phase by the contract administrator and issued to the client. They will generally be ...")
- 05:08, 27 October 2011 (diff | hist) N Construction progress meeting (Created page with "During the construction stage the Contract Administrator holds regular (often monthly) construction progress meetings attended by the contractor and members of the Consultant Tea...")
- 05:04, 27 October 2011 (diff | hist) N CDM 2007 Construction phase plan (Created page with "Under the CDM regulations, the principal contractor is required to develop a construction phase plan setting out how health and safety will be managed during the construction pha...")
- 19:02, 26 October 2011 (diff | hist) N Construction manager (Created page with "See also Construction management / management contracting: outline work plan, available from the designing buildings wiki home page. Construction management is a procuremen...")
- 18:54, 26 October 2011 (diff | hist) Concept architectural design checklist
- 18:53, 26 October 2011 (diff | hist) Concept services design
- 18:52, 26 October 2011 (diff | hist) Concept structural design of buildings
- 18:51, 26 October 2011 (diff | hist) N Concept structural design of buildings (Created page with "Concept design proposals from the structural engineer might include: *Preferred foundation design. *Frame system. *Structural grid with column sizes. *Primary and secondary beam...")
- 18:48, 26 October 2011 (diff | hist) N Concept services design (Created page with "Concept design proposals from the services engineer might include: *Weights and location of all major plant and equipment. *Position of vertical service risers. *Routes for dist...")
- 18:46, 26 October 2011 (diff | hist) Concept design report
- 18:39, 26 October 2011 (diff | hist) N Concept design report (Created page with "The final output of the concept design stage is to produce a report which record the basic design concepts that might be options worth further investigation focusing on the major...")
- 18:34, 26 October 2011 (diff | hist) N Concept design (Created page with "NB for detailed tasks undertaken during the concept design stage see the free work plans available from the home page. Concept design is the first design stage. Feasibility stud...")
- 17:49, 26 October 2011 (diff | hist) Traditional contract: business justification
- 15:00, 26 October 2011 (diff | hist) N Category:Design (Created page with "Category:Design")
- 14:59, 26 October 2011 (diff | hist) N Concept architectural design checklist (Created page with "Concept architectural (as opposed to concept structural design or concept services design) design should take the development of the design to a level where it is suffi...")
- 14:50, 26 October 2011 (diff | hist) N Category:Planning permission (Created page with "Category:Regulations") (top)
- 14:49, 26 October 2011 (diff | hist) N Community infrastructure levy CIL (Created page with "In 2010 measures within the [http://www.legislation.gov.uk/ukdsi/2010/9780111492390/contents community infrastructure levy regulations ]came into force clarifying the relationshi...")
- 14:40, 26 October 2011 (diff | hist) N Commissioning building systems (Created page with "Commissioning refers to the process of bringing an item into operation and ensuring that it is in good working order. On building projects, this usually refers to building servic...")
- 14:35, 26 October 2011 (diff | hist) Collateral warranties for building design and construction
- 14:26, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:22, 26 October 2011 (diff | hist) N Collateral warranties for building design and construction (Created page with "#Collateral warranties are agreements associated with another 'primary' contract. They came into being as a result of the courts deciding that defects in buildings were not recov...")
- 14:18, 26 October 2011 (diff | hist) Traditional contract: business justification
- 14:16, 26 October 2011 (diff | hist) N Traditional contract: business justification (Created page with "NB there is no equivalent RIBA stage as business justification takes place before the appointment of an architect. The business justification stage is the first stage to take pl...")
- 13:59, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:58, 26 October 2011 (diff | hist) Arbitration in the construction industry
- 13:57, 26 October 2011 (diff | hist) Adjudication in construction contracts
- 13:55, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:52, 26 October 2011 (diff | hist) Traditional contract: outline work plan
- 13:42, 26 October 2011 (diff | hist) Get started - top tips and help
- 13:41, 26 October 2011 (diff | hist) N Get started - top tips and help (Created page with "= = = How to create an article. = <br>formatting might change on import<br>Locked out<br>How to edit an article.<br>Locked out = <br>Creating links. = <br>Wiki sites work be...")
- 13:34, 26 October 2011 (diff | hist) N Collaborative practices for building design and construction (Created page with "The establishment of collaborative practices is of particular importance on building design and construction projects as they are likely to involve the bringing together of a lar...")
- 13:22, 26 October 2011 (diff | hist) Base date in construction contracts
- 13:17, 26 October 2011 (diff | hist) Building user's guide
- 13:13, 26 October 2011 (diff | hist) Change control procedure for building design and construction
- 13:08, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 13:04, 26 October 2011 (diff | hist) N Category:Other legislation (Created page with "Category:Regulations") (top)
- 13:03, 26 October 2011 (diff | hist) Alternative dispute resolution for construction ADR
- 12:58, 26 October 2011 (diff | hist) N Change control procedure for building design and construction (Created page with "Changes to a design may have impacts on time, cost or quality. Broadly, the later in the development of the project that changes occur, the greater those impacts are likely to be...")
- 12:51, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 12:45, 26 October 2011 (diff | hist) Champions for construction clients
- 12:39, 26 October 2011 (diff | hist) Champions for construction clients
- 12:37, 26 October 2011 (diff | hist) Champions for construction clients
- 12:36, 26 October 2011 (diff | hist) Champions for construction clients
- 12:36, 26 October 2011 (diff | hist) Champions for construction clients
- 12:35, 26 October 2011 (diff | hist) N Champions for construction clients (Created page with "It is important on all projects that there are designated client 'champions' On public sector projects, the Office of Government Commerce (OGC) recommend early appointment of a ...")
- 12:27, 26 October 2011 (diff | hist) N Certificate of making good defects (Created page with "Once practical completion has been certified, the defects liability period begins (now called the 'rectification period' in JCT contracts). Typically, the defects liability perio...")
- 12:21, 26 October 2011 (diff | hist) N CDM co-ordinator (Created page with "Under the CDM Regulations (The Construction (Design and Management) Regulations 2007), A CDM co-ordinator must be appointed on projects that last more than 30 days or involve 500...")
- 12:14, 26 October 2011 (diff | hist) N 2007 CDM Regulations (Created page with "The Construction (design and management) regulations (2007) (CDM Regulations) are intended to ensure that healt...")
- 12:04, 26 October 2011 (diff | hist) N Client's representative (Created page with "Some procurement systems such as the British Property Federation (BPF) system define the role of client’s representative. This is the person responsible for managing the pro...")
- 11:07, 26 October 2011 (diff | hist) Client for building design and construction
- 11:06, 26 October 2011 (diff | hist) Client for building design and construction
- 11:05, 26 October 2011 (diff | hist) Client for building design and construction
- 11:02, 26 October 2011 (diff | hist) Client for building design and construction
- 10:56, 26 October 2011 (diff | hist) Client for building design and construction
- 10:50, 26 October 2011 (diff | hist) Client for building design and construction
- 10:44, 26 October 2011 (diff | hist) N Client for building design and construction (Created page with "The client here refers to the organisation that is procuring the building development. This client is sometimes referred to as the employer as they are the organisation that empl...")
- 10:32, 26 October 2011 (diff | hist) N File:Client1.jpg (OGC illustration of project organisation) (top)
- 10:19, 26 October 2011 (diff | hist) N Cash flow in construction (Created page with "The cash flow sets out when costs will be incurred and how much they will be during the life of the project. <br>Predicting the cash flow that will be required is important in ...")
- 10:16, 26 October 2011 (diff | hist) Capital allowances for construction
- 10:16, 26 October 2011 (diff | hist) Capital allowances for construction
- 10:14, 26 October 2011 (diff | hist) Capital allowances for construction
- 10:10, 26 October 2011 (diff | hist) Capital allowances for construction
- 10:10, 26 October 2011 (diff | hist) N Capital allowances for construction (Created page with "Capital allowances can play a big part in the business plan and setting budgets The client is allowed to deduct capital allowances from taxable profits. These relate to the cost...")
- 10:07, 26 October 2011 (diff | hist) Computer aided design CAD
- 10:06, 26 October 2011 (diff | hist) N Computer aided design CAD (Created page with "Computer Aided Design (CAD) can be used to improve the speed of production and quality of drawn information. Uses range from the creation of Computer Generated Images (CGI) for p...")
- 10:01, 26 October 2011 (diff | hist) N Category:Cost / business planning (Created page with "Category:Procedures") (top)
- 10:00, 26 October 2011 (diff | hist) N Business case for construction projects (Created page with "In the esrly stages of the project, an outline business case should be prepared. This is then developed into a detailed business case for preferred option. This detaile...")
- 09:51, 26 October 2011 (diff | hist) Building log book
- 07:39, 26 October 2011 (diff | hist) Building regulations
- 07:37, 26 October 2011 (diff | hist) N Building regulations (Created page with "The Department for Communities and Local Government is responsible for building regulations in England and Wales, which exist to ensure the health and safety of people in and aro...")
- 07:15, 26 October 2011 (diff | hist) Building owner's manual - O and M manual
- 07:10, 26 October 2011 (diff | hist) Building owner's manual - O and M manual
- 07:08, 26 October 2011 (diff | hist) N Building owner's manual - O and M manual (Created page with "The building owner's manual (or operation and maintenance manual (O&M manual)) contains the information required for the operation, maintenance, decommissioning and demolitio...")
- 05:57, 26 October 2011 (diff | hist) Building log book
- 05:55, 26 October 2011 (diff | hist) N Building log book (Created page with "Part L of the building regulations requires that the building owner is issued with information about the building services to help them to operate the building properly and effic...")
- 05:36, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 05:26, 26 October 2011 (diff | hist) Appointing consultants for building design and construction
- 12:05, 25 October 2011 (diff | hist) N Category:Regulations (Created page with "Category:Regulations") (top)
- 12:02, 25 October 2011 (diff | hist) N Target emission rate TER (Created page with "Emission rates (TER, DER, BER) It is now a requirement of the building regulations to submit target CO2 emission rates (TER) and dwelling / building CO2 emission rates (DER / BE...")
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.