Process Redesign: A Comprehensive Guide for Quality Professionals in Business and Engineering

Contents

[edit] Introduction

The engineering of a process is the design of the steps to realise a product/service and the release of the relevant procedures and instructions. The construction industry is featured by its complex projects, the fragmentation of stakeholders, and the pressure to respect clients' requirements while delivering on time and within budget. Hence, upon implementation or over time, the designed processes may prove to be inefficient. Process redesign can be a valid path to transform the work processes to achieve the initial goals.

This article aims to provide a comprehensive understanding of process redesign, tailored for quality professionals in the construction industry. It presents the fundamental principles, methodologies, and practical applications of process redesign, supported by academic research and real-world examples. The role quality professionals will be proven crucial in driving successful transformation.

For the scope for this article, we present the process redesign in its main configuration, giving our best advice how to take the most and proposing solutions that can be implemented in the construction industry.

[edit] Understanding Process Redesign:

The process redesign is mainly intended as Business Process Redesign (BPR), developed for industries other than the construction sector. However, conscious of the peculiarity of the construction market (customer focused, project based, process oriented, performance improved and value generated), researchers developed a more specific Construction Process Redesign (CPR) (Cham, Fan, Yu, 1999). The focus remains on the BPR, as supported by wider research and because the CPR advises for a flexible approach, which is underpinned by this article.

BPR was defined by Davenport and Short in 1990 as the “analysis and design of workflows and processes within and between organisations” (Earl, 1994). The origins are dated to the activities of companies like Xerox, Ford, IBM, Cigna, Texas Instruments, who were transforming their way of organising their business in the 1980s. The changes were mainly around three areas:

Process redesign was described by Hammer and Champy (1993) not only as incremental improvement but as a fundamental rethinking and radical redesign of business processes to achieve substantial positive impact in cost, quality, service, and speed. In the context of construction, this mandates to examine workflows to spot all the inefficiencies and implement appropriate change. Specifically:

As mentioned by Reijers&Mansar (2005), a “BPR initiative is commonly seen as a twofold challenge:

  • a technical challenge, which is due to the difficulty of developing a process design that is a radical improvement of the current design,
  • a socio-cultural challenge, resulting from the severe organisational effects on the involved people, which may lead them to react against those changes.”

Furthermore, the project management of a BPR is a challenge per se (Reijers&Mansar, 2005).

Finally, “the fundamental challenge is to come up with a new process design that is one or more ways superior to the existing plan” (Mansar&Reijers, 2005).

[edit] Why is Process Redesign Crucial in Construction?

The nature of the construction industry poses various challenges:

  1. Overproduction: Producing materials or components before they are needed.
  2. Waiting: Delays caused by lack of materials, equipment, or information.
  3. Transportation: Unnecessary movement of materials or equipment.
  4. Inventory: Excess materials stored on site.
  5. Motion: Unnecessary movement of workers.
  6. Defects: Rework and repairs caused by errors or omissions.
  7. Overprocessing: Performing unnecessary tasks.
  8. Non-utilised talent: Not using the full skill set of the workers. Process redesign can help identify and eliminate these forms of waste, leading to significant cost savings and improved productivity.
  9. The change out of personnel during process execution with a potential for a lack of training on how the process works in operation.

Process redesign can help for all above-mentioned challenges. As examples:

[edit] Principles of Process Redesign:

Effective process redesign is guided by several key principles:

[edit] Steps in Process Redesign:

A typical process redesign project involves the following steps:

Define the Scope: Clearly define the boundaries of the process to be redesigned. Define the objectives to be satisfied. Identify the key stakeholders and their requirements.

Analyse the Current Process: Document the existing process and decompose it into its parts. A complex process may first be divided into sub-processes; then, each sub-process can be listed as a sequence of individual tasks. Flowcharts, process maps, or BPMN diagrams can be used. Identify bottlenecks, inefficiencies, and areas for improvement.

Design the New Process: Develop a new process that addresses the identified issues and meets the project objectives. Consider the use of technology, automation, and best practices. While designing the new process, it is crucial to assess the potential impact that the change may have upon other processes, which the process being redesigned may interface or interact with.

Implement the New Process: Develop a detailed implementation plan, including training, communication, and change management. The new process should be first tested in a controlled environment before full-scale implementation.

Monitor and Evaluate: The implementation shall be monitored to verify the performance of the new process and the gaps, if any, to be filled. The use of KPIs is strongly advised in this phase.

Continuous Improvement: Once established, the new process shall become part of the continuous improvement efforts, benefiting from a culture of learning that includes lessons learned, regular reviews and feedback mechanisms.

[edit] How to select the best practice for the most common cases: the BPR Framework

After defining the BPR steps and before mentioning which tools and methodologies can be used to support the BPR effort, it is important to identify how to select the most appropriate best practice for our case.

Reijers&Mansar (2005) proposed a framework to lead the process redesign. Specifically, the scope is “to help the designer in selecting the proper best practices” for the BPR, collected over 20 years application in various areas (business planning, healthcare, manufacturing, and software development). The best practices are listed in the table below.

BPR best practices.jpg

The choice is facilitated by six elements, integral part of the framework:

  1. the operation view: how is a business process implemented? (number of tasks in a job, relative size of tasks, nature of tasks, degree of customisation), and
  2. the behaviour view: when is a business process executed? (sequencing of tasks, task consolidation, scheduling of jobs, etc.);
  1. the organisation structure (elements: roles, users, groups, departments, etc.), and
  2. the organisation population (individuals: agents which can have tasks assigned for execution and relationships between them);

The framework was not developed for the construction industry and is presented in this article for completeness. However, some of the practices listed above can be applied even in the construction world.

[edit] Methodologies for Process Redesign:

Once it is defined what we want to achieve, the target may be reached by several methodologies:

Lean Construction: Lean principles, derived from the Toyota Production System, focus on eliminating waste and maximising value. Lean construction tools, such as value stream mapping and 5S (refer to other articles from the ConSIG in DesignBuildingWiki), can be used to identify and eliminate inefficiencies in construction processes.
Example: Implementing a "Last Planner System" to improve workflow reliability and reduce schedule variability.

Six Sigma: Six Sigma is a data-driven methodology that aims to reduce variation and defects in processes. DMAIC (Define, Measure, Analyse, Improve, Control) is a key tool used in Six Sigma projects.
Example: Using statistical process control to monitor concrete strength and reduce the number of defective pours.

Business Process Modelling and Notation (BPMN): BPMN is a standardised graphical notation for representing business processes. It allows for clear communication and analysis of process flows.
Example: Using BPMN to model the procurement process and identify bottlenecks.

Building Information Modelling (BIM): BIM is a digital representation of physical and functional characteristics of a facility. It enables collaboration, coordination, and clash detection, leading to improved project outcomes.
Example: Using BIM to coordinate mechanical, electrical, and plumbing installations, reducing rework and delays.

Agile Project Management: Agile methodologies, such as Scrum and Kanban, emphasise iterative development, flexibility, and collaboration. They can be applied to construction projects to improve responsiveness to changing requirements.
Example: Using daily stand-up meetings to improve communication and coordination on site.

[edit] Practical Applications in Construction:

Here are some additional examples of how process redesign can be applied in different areas of construction:

Procurement: Streamlining the procurement process by implementing e-procurement systems, standardising contracts, and improving supplier relationships.

Material Management: Reducing material waste by implementing just-in-time delivery, using modular construction, and improving inventory control.

Site Logistics: Optimising site layout and material flow to improve efficiency and safety.

Quality Control: Implementing automated quality control systems, using BIM for clash detection, and improving communication between stakeholders.

Safety Management: Implementing safety training programs, conducting risk assessments, and using technology to monitor safety performance.

Project Management: Implementing agile project management methodologies, using BIM for project coordination, and improving communication between stakeholders.

Handover Process: Implementing a digital handover process to transfer project information efficiently.

Rework Reduction: Using root cause analysis to reduce the amount of rework needed on projects. Using better communication to reduce errors.

[edit] Challenges and Considerations:

Before starting with BPR, it is critical to consider some factors linked to its challenging nature:

[edit] The Role of Quality Professionals:

Quality professionals play a crucial role in process redesign in construction. They can:

[edit] Conclusion:

Process redesign is a powerful tool for construction professionals to improve efficiency, quality, and safety. By applying the principles and methodologies discussed in this article, construction companies can achieve significant performance gains and stay competitive in a dynamic market. Quality professionals are instrumental in leading and supporting process redesign initiatives, ensuring that projects are delivered on time, within budget, and to the highest standards. The research on CPR is not as wide as for BPR. However, the flexibility recognised by the CPR and the transverse nature of the CPR offer a robust base for continuous improvement.

[edit] References:


Original article written by Giorgio Mannelli and reviewed by Colin Harley on behalf of the Chartered Quality Institute, Construction Special Interest Group (ConSIG). Article peer reviewed by the ConSIG Thought Leadership Group (former Knowledge Working Group) and accepted for publication by the ConSIG Steering Committee.

--ConSIG CWG 11 Oct 2025 (BST)

[edit] Related articles on Designing Buildings

Designing Buildings Anywhere

Get the Firefox add-on to access 20,000 definitions direct from any website

Find out more Accept cookies and
don't show me this again