Cost saving
Cost saving is a simple term referring mainly to spending less money than planned, or money saved and not spent. In the design and construction of buildings it can be a crucial element of procurement within which processes are set up directly with the aim of making cost efficiencies or savings such as value engineering processes, cost benefit analysis and so on.
In a construction project financial cost savings might be loosely categorised into two different types;
- Operational cost savings.
- Capital cost savings.
Operational cost savings refer to the savings associated with the running of a building once it is completed or prior to and after refurbishment. These costs might relate to service provisions such as electricity, gas, water sewage and those within the local vicinity such as waste collection and council services. In the case of buildings that house organisations these may extend further to cover overall running costs of their operation from that building, which might include staffing, office material and consumables. The definition of these is usually described in detail by local tax offices, some of which will relate to taxes paid yearly or taxes due to be paid over a period of years. These costs in a similar way might also be described in terms of time period as short term financial cost savings and longer term financial cost savings.
For more information see: Operational costs.
Capital cost savings refer to savings made on the initial purchase of equipment or materials that may be used over a number of years. The capital cost savings therefore need to be balanced with the number of years an item is likely to be used. In tax terms this might be called depreciation or in a case where the capital costs claimed in the first year is higher (rather than spread equally over the years of use) accelerated depreciation, which is normally for equipment that might rapidly decrease in value.
For more information see: Capital costs.
In perhaps more philosophical terms cost might be described as something that is given, needed, or lost in order to get something else, a particular gain or thing - a saving would be a reduction in some form. In this context finances can be considered as only one aspect in the interpretation of potential costs to be considered, other cost definitions that are increasingly being considered might be expanded to environmental costs and social costs. In particular the Brundtland report talks about the subject of sustainable development as one that "meets the needs of the present without compromising the ability of future generations to meet their own needs” (United Nations, 1987). In this understanding costs that lie beyond the financial, over longer periods of time, become a consideration. In this context terms such as whole-life costs and carbon costs might be discussed further when considering the design, construction and use of buildings.
For more information about methods of cost saving on construction projects see: Cost control.
[edit] Related articles on Designing Buildings
- Accounting.
- Approximate quantities cost plan.
- Budget.
- Business plan.
- Cash flow.
- Contract sum analysis.
- Cost control.
- Cost and bonus surveyor.
- Cost plans.
- Elemental cost plan.
- Estimator.
- Front-loaded costs.
- Initial cost appraisal.
- Interim certificate.
- New Rules of Measurement.
- Professional indemnity insurance.
- Whole life costing.
- Tender pricing document.
- Variations.
- Whole life solution
Featured articles and news
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.