Logistics management in construction
Logistics management is the process of planning, implementing and controlling supply chain resources, generally from the point of origin, such as raw material accumulation, to the point of destination, i.e. delivering goods to the correct location on the construction site.
Effective logistics management is important can enhance efficiency and productivity, having a positive overall impact on cost and time. For example, good logistics management ensures the workforce are able to carry out required activities without delays caused by materials being delivered to site.
Logistics management involves the integrating of many activities:
- Resource assessment.
- Lead time assessment.
- Supply and demand planning.
- Sourcing and procurement.
- Production planning and scheduling.
- Packaging and assembly.
- Inventory management and order fulfilment.
- Inbound and outbound transport management.
- Warehousing.
- Materials handling.
- On site vehicle and plant management.
- Customer services.
- Waste management.
Having a timeline of project stages planned in advance, with a full inventory of materials and tools required, is a key part of logistics management. Due to the complexity of the process, and the interaction of many supply streams, dedicated simulation software can be used to model, analyse, visualise and optimise logistics.
In addition to keeping the construction programme on-schedule, other advantages of good logistics management include:
- Cost savings and waste reduction as productivity is enhanced.
- Logistical planning on site enables materials to be stored correctly which improves efficiency and reduces the potential for damage
- Sites can be kept safe, clean and easy to move around.
- Deliveries can be received and handled promptly.
Construction consolidation centres (CCC) can be used as a part of logistics management. These are locations near to but not necessarily on site, to which deliveries are made and stored. They are then brought to the site on a ‘just in time’ basis as and when required. This has the advantage of keeping the site clear of obstacles, cutting down on required storage space, and ensures that the logistics manager is aware that the materials are available close-at-hand.
For more information, see Construction consolidation centre (CCC).
Typically, a construction logistics manager will be responsible for the logistics supply chain. The main responsibilities of a logistics manager will include the coordination of the workforce, goods and equipment at the construction site. They should engage with the project planner, commercial management and construction manager to ensure that all activities are properly coordinated across the project.
For more information, see Construction logistics manager.
See also: Site logistics.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
[edit] External resources
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.