Construction consolidation centre CCC
Contents |
[edit] Introduction
A construction consolidation centre (CCC) is a distribution facility that can be used in the process of managing project logistics, channelling material deliveries to a large, single construction site or a number of different sites. It facilitates the efficient flow of materials through the supply chain, reducing waste and other issues such as congestion.
Construction materials are delivered from suppliers to the CCC where they are stored until call-off from the site, at which point the CCC operator makes up and delivers a consolidated load. This is done on a ‘just in time’ basis, for enhanced efficiency.
Usually, the main contractor takes the decision to use a CCC and so carries the cost. However, subcontractors, suppliers and hauliers all see the benefit and so there can be an effort to spread the costs.
While distribution centres have been commonly used in other sectors in the UK, currently there are only a few examples of CCCs. The Heathrow Consolidation Centre (HCC) was established in 2001 for the ongoing work at Heathrow airport. In 2005, the London Construction Consolidation Centre (LCCC) was set up as a pilot study. Subsequently, Wilson James took over the LCCC and relocated it to Silvertown, near City Airport. The house builder Taylor Wimpey has set up Taylor Wimpey Logistics which consolidates materials in a Newmarket facility that then provides for its sites across England and Wales.
[edit] Specifications
[edit] Project size
The use of a CCC is not necessarily dependent on the size of a project, but rather whether there is an ongoing business volume to make it worthwhile. Shared user CCCs can be an option as opposed to single users, which allows the operating costs to be spread between users.
[edit] Location
As a general rule, CCCs are located close to a motorway or major road network. This is so that the impact on local roads is kept to a minimum and to minimise the turnaround times of hauliers.
Sometimes a CCC is situated where several different sites can be reached in 30-45 minutes, but it can be more sensible, if there are a reasonable number of sites, to have two smaller CCCs, each of which are closer to the respective sites, than one large CCC.
[edit] Advantages
There are several advantages associated with using CCCs. Studies looking into their general impact have found:
- Up to 70% reduction in freight traffic to site.
- A 6% productivity gain based on increased workforce productivity of 30 minutes per day.
- A 7-15% reduction in waste.
- More efficient utilisation of delivery vehicles.
- Reduced carbon emissions and traffic congestion.
- Noise and pollution reductions.
- Reverse logistics means that journeys from the site can be used for waste removal, return of unused materials, and so on.
- Cost savings associated with fewer and more efficient vehicle journeys.
- Improved programme certainty.
- Better storage facilities than are often available on site.
- Excess packaging can be removed at the CCC rather than creating clutter on site.
- Materials delivery can be sequenced.
- Manufacturer errors or damage can be detected at the CCC rather than when delivered to site.
[edit] Related articles on Designing Buildings
- Circular economy.
- Construction logistics manager.
- Design for Manufacture and Assembly (DfMA).
- Forklift.
- Lean construction.
- Logistics management.
- Materials on site.
- Mean lean green.
- Off site materials.
- Site storage.
- Site Waste Management Plan.
- Waste and Resources Action Plan WRAP.
- Warehouse.
[edit] External resources
Featured articles and news
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.