Construction consolidation centre CCC
Contents |
[edit] Introduction
A construction consolidation centre (CCC) is a distribution facility that can be used in the process of managing project logistics, channelling material deliveries to a large, single construction site or a number of different sites. It facilitates the efficient flow of materials through the supply chain, reducing waste and other issues such as congestion.
Construction materials are delivered from suppliers to the CCC where they are stored until call-off from the site, at which point the CCC operator makes up and delivers a consolidated load. This is done on a ‘just in time’ basis, for enhanced efficiency.
Usually, the main contractor takes the decision to use a CCC and so carries the cost. However, subcontractors, suppliers and hauliers all see the benefit and so there can be an effort to spread the costs.
While distribution centres have been commonly used in other sectors in the UK, currently there are only a few examples of CCCs. The Heathrow Consolidation Centre (HCC) was established in 2001 for the ongoing work at Heathrow airport. In 2005, the London Construction Consolidation Centre (LCCC) was set up as a pilot study. Subsequently, Wilson James took over the LCCC and relocated it to Silvertown, near City Airport. The house builder Taylor Wimpey has set up Taylor Wimpey Logistics which consolidates materials in a Newmarket facility that then provides for its sites across England and Wales.
[edit] Specifications
[edit] Project size
The use of a CCC is not necessarily dependent on the size of a project, but rather whether there is an ongoing business volume to make it worthwhile. Shared user CCCs can be an option as opposed to single users, which allows the operating costs to be spread between users.
[edit] Location
As a general rule, CCCs are located close to a motorway or major road network. This is so that the impact on local roads is kept to a minimum and to minimise the turnaround times of hauliers.
Sometimes a CCC is situated where several different sites can be reached in 30-45 minutes, but it can be more sensible, if there are a reasonable number of sites, to have two smaller CCCs, each of which are closer to the respective sites, than one large CCC.
[edit] Advantages
There are several advantages associated with using CCCs. Studies looking into their general impact have found:
- Up to 70% reduction in freight traffic to site.
- A 6% productivity gain based on increased workforce productivity of 30 minutes per day.
- A 7-15% reduction in waste.
- More efficient utilisation of delivery vehicles.
- Reduced carbon emissions and traffic congestion.
- Noise and pollution reductions.
- Reverse logistics means that journeys from the site can be used for waste removal, return of unused materials, and so on.
- Cost savings associated with fewer and more efficient vehicle journeys.
- Improved programme certainty.
- Better storage facilities than are often available on site.
- Excess packaging can be removed at the CCC rather than creating clutter on site.
- Materials delivery can be sequenced.
- Manufacturer errors or damage can be detected at the CCC rather than when delivered to site.
[edit] Related articles on Designing Buildings
- Circular economy.
- Construction logistics manager.
- Design for Manufacture and Assembly (DfMA).
- Forklift.
- Lean construction.
- Logistics management.
- Materials on site.
- Mean lean green.
- Off site materials.
- Site storage.
- Site Waste Management Plan.
- Waste and Resources Action Plan WRAP.
- Warehouse.
[edit] External resources
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.