Design for Manufacture and Assembly (DfMA)
Contents |
[edit] Introduction
Design for Manufacture and Assembly (DfMA) is a design approach that focuses on ease of manufacture and efficiency of assembly. By simplifying the design of a product it is possible to manufacture and assemble it more efficiently, in the minimum time and at a lower cost.
Traditionally, DfMA has been applied to sectors such as the design of automotive and consumer products, both of which need to efficiently produce high quality products in large numbers. More recently, construction contractors have begun to adopt DfMA for the off-site prefabrication of construction components such as concrete floor slabs, structural columns and beams, and so on.
DfMA combines two methodologies – Design for Manufacture (DFM) and Design for Assembly (DFA):
[edit] Design for Manufacture (DFM)
DFM involves designing for the ease of manufacture of a product’s constituent parts. It is concerned with selecting the most cost-effective materials and processes to be used in production, and minimising the complexity of the manufacturing operations.
[edit] Design for Assembly (DFA)
DFA involves design for a product’s ease of assembly. It is concerned with reducing the product assembly cost and minimising the number of assembly operations.
Both DFM and DFA seek to reduce material, overhead, and labour costs.
[edit] DfMA principles
In a similar approach to lean construction, applying DfMA enables the identification, quantification and elimination of waste or inefficiency in product manufacture and assembly. It can also be used as a benchmarking tool to study the products of competitors.
The main principles of DfMA are:
- Minimise the number of components: Thereby reducing assembly and ordering costs, reducing work-in-process, and simplifying automation.
- Design for ease of part-fabrication: The geometry of parts is simplified and unnecessary features are avoided.
- Tolerances of parts: Part should be designed to be within process capability.
- Clarity: Components should be designed so they can only be assembled one way.
- Minimise the use of flexible components: Parts made of rubber, gaskets, cables and so on, should be limited as handling and assembly is generally more difficult.
- Design for ease of assembly: For example, the use of snap-fits and adhesive bonding rather than threaded fasteners such as nuts and bolts. Where possible a product should be designed with a base component for locating other components quickly and accurately.
- Eliminate or reduce required adjustments: Designing adjustments into a product means there are more opportunities for out-of-adjustment conditions to arise.
[edit] Advantages of DfMA
Some of the main advantages of DfMA include:
[edit] Speed
One of the primary advantages of DfMA in construction is the significantly reduced programme on-site through the use of prefabricated elements.
[edit] Lower assembly cost
By using fewer parts, decreasing the amount of labour required, and reducing the number of unique parts, DfMA can significantly lower the cost of assembly.
[edit] Higher quality and sustainability
A highly automated approach can enhance quality and efficiency at each stage.
There may be less waste generation in the construction phase, greater efficiency in site logistics, and a reduction in vehicle movements transporting materials to site.
[edit] Shorter assembly time
DFMA shortens assembly time by utilising standard assembly practices such as vertical assembly and self-aligning parts. DFMA also ensures that the transition from the design phase to the production phase is as smooth and rapid as possible.
[edit] Increased reliability
DfMA increases reliability by lowering the number of parts, thereby decreasing the chance of failure.
[edit] Safety
By removing construction activities from the site and placing them in a controlled factory environment there is the possibility of a significant positive impact on safety.
[edit] Platform approach to design for manufacture and assembly
In November 2018, as part of the National Infrastructure and Construction Pipeline 2018, the government committed to increasing the use of prefabrication and other off-site construction methods on public projects. Details of a preferred approach were published, called 'Platform Approach to Design for Manufacture and Assembly' (P-DfMA).
The government are pushing for a digitally-designed set of components to be used 'wherever possible' across a range of government construction programmes and projects. These components would be manufactured in factories and assembled on site. The Treasury believes that adopting this approach can boost productivity whilst also reducing waste by up to 90%.
Exchequer secretary to the Treasury, Robert Jenrick said; “Over the course of this Parliament, investment in economic infrastructure will reach the highest sustained levels in over 40 years. And as the pace of technological change accelerates, we are stepping up our commitment to digital infrastructure, use of data to drive greater productivity and embrace new methods of construction. With £600bn of investment over the next decade, including the largest ever investment in our strategic road network, we are taking the long term action required to raise productivity and ensure the economy is fit for the future.”
For more information see: Platform approach to design for manufacture and assembly.
NB DfMA Overlay to the RIBA Plan of Work, Mainstreaming Design for Manufacture and Assembly in Construction, 2nd Edition, published by the RIBA in 2021, suggests that: ‘DfMA is a formal design approach that focuses on designing for ease and efficiency of manufacture and assembly. It is a prerequisite for considering modern methods of construction, especially offsite solutions. It extends the business-as-usual focus of building design to resolve designs in terms of how efficiently they can be manufactured and assembled on site.’
[edit] Related articles
- Advanced manufacturing.
- BSRIA launches Offsite Construction for Building Services topic guide.
- Construction consolidation centre (CCC).
- Design for deconstruction.
- Design for maintenance.
- Fabrication.
- Mean lean green.
- Modern methods of construction.
- Modular buildings.
- Offsite manufacturing.
- Offsite manufacturing and standardised design.
- Off-site construction.
- Off site materials.
- Off-site prefabrication of buildings: A guide to connection choices.
- Platform approach to design for manufacture and assembly.
- Prefabrication.
- Pre-manufactured value.
- Whole life costs.
[edit] External resources
- Engineering Exchange - 11 principles
Featured articles and news
Corruption in the construction industry.
What will it take to stop it ?
To celebrate world bee day 2022 !
Just one month until the changes to part L come into effect.
Not forgetting part F and the new part overheating part O.
Heat Pump demand rises by one quarter.
As energy prices jump up in cost.
With people in the UK from Ukraine.
Industry leader Steve Murray takes on role.
An abundant and versatile building material.
How overheating complicates ending gas in the UK.
600,000 heat pump installations targeted per year by 2028.
Cost planning, control and related articles on DB.
Helping prevent those unwanted outcomes.
ICE debate Public transport - post pandemic.
How has transport changed due to Covid-19 ?
Cross-ventilation in buildings. Do you have it ?
Will you need it ? after June 15 and the new Part O ?
Share your knowledge with the industry.
Create an account and write the first of many articles.
The green jobs delivery group.
CIAT commentary after the first meeting.
Liverpool's world heritage site status
Who is to blame?
Research recommends focussing on portfolio success rather than project success.
ICE and BSI launch revised PAS 128 standard.
The revised standard for mapping underground utilities.
Launching the UK net zero carbon buildings standard.
Cross-industry steering group seeks support in delivery.
Comments