[edit] Introduction
The origins of supply chain management (SCM) lie in the manufacturing industries. The armoury practices of the late-19th century, and later the production methods of Henry Ford in the 1920s, created the SCM system that remains largely unchanged today. The central focus is on the prouction process of goods through the control of material flows.
Large efficiency gains can be achieved through managing the interfaces between organisations. Latham and Egan recognised this as being relevant to construction in their respective reports.
SCM exists alongside and overlaps with many other management approaches including:
[edit] What is supply chain management?
‘Supply’ is the flow of resources used to satisfy a demand, such as materials, labour, information, skills, and so on. It can also refer to competencies, and represent combinations of resources. Commodity suppliers tend to be more price focused, whilst strategic suppliers are more quality/delivery focused.
‘Chains’ represents the notion of links within and between both resources and competencies. They are based upon relationships between people and organisations, and processes within and between organisations.
‘Management’ is the exercise of formal authority within a structured organisational setting that is directed towards aims and objectives through the efforts of other people using systems and procedures.
Supply chain management requires a holistic perspective and a view of organisations as parts of a process. It requires the ability to look beyond organisational boundaries, and a recognition of the interdependence of organisations.
Most definitions of supply chain management share generic characteristics:
- Holistic.
- Networks.
- Relationship-focused.
- Attitudinal.
- Responsibility of managing chain.
- Necessity for change of culture.
[edit] The need for SCM in construction
Managing the supply chain involves understanding the breakdown and traceability of products and services, organisations, logistics, people, activities, information and resources that transform raw materials into a finished product that is fit for its purpose.
Buildings are becoming increasingly complex, and require more design input by specialist suppliers. At the same time there is increasing fragmentation of the industry as can be seen from the growth of specialist suppliers/contractors, the proliferation of products and the fragmentation of design and control activities.
The supply chain is relatively unstable, and the industry is project-based with defined start and end points, and a traditional separation between design and construction. Demand is treated as a series of competitively tendered prototypes constructed by temporary coalitions. This all has an impact on organisational relationships.
Project relationships are short term and have defined start and end points, they are usually informal/ad-hoc and focused on the project not the business. Relationships between competencies vary from project to project. The resulting lack of continuity prevents the innovation and improvement of process as well as the development of more complex relationships. The client may also have an impact on the procurement route and choice of strategic suppliers.
On large or complex projects, responsibility and performance generally cascades down the supply chain to a plethora of suppliers sometimes unknown at the top of the chain. The first and second tier of the supply chain may sign up to fairly onerous agreements but as the chain develops, so the contractual liabilities decrease until suppliers at the end of the chain are often not locked in at all.
Changing the perspective from delivery of a ‘project’ to the process of ‘project delivery’ requires the building of long-term relationships (formal and informal), partnering, and alliancing.
Companies offering continuity in construction have taken an increasing interest in establishing relationships beyond direct, first tier suppliers. Framework contracts and partnering agreements have pioneered this approach, encouraging the involvement of selected suppliers at relatively early stages of projects while offering continuity of work. This has led to greater collaboration between lead designers and product designers to the advantage of all parties.
The Government Construction Strategy, recommended three different procurement routes that aimed to improve the SCM process; private finance initiative (PFI), prime contracting and design and build. With each of these, the client enters into a relationship with a single integrated supply team, which may include the main contractor, designers, sub-contractors, suppliers, facilities managers, and so on.
[edit] Related articles on Designing Buildings
- Business process reengineering BPR.
- Business to business.
- Call-off contract.
- Collaborative practices.
- Construction strategies for SE Asia.
- Contract conditions.
- Contractor vs supplier.
- Dynamic conditions for project success.
- Framework agreements.
- Government to support businesses through Trade Credit Insurance guarantee.
- Green supply chain management.
- Integrated supply team.
- Latham Report.
- Logistics management.
- Manufacturer.
- Point of supply.
- Products v goods v materials.
- Subcontractor vs supplier.
- Supplier.
- Supplier monitoring.
- Supplier selection.
- Supply.
- Supply chains in construction.
- Understanding agile in project management.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.