Designers for buildings and other built assets
A designer is defined in the 2015 CDM Regulations as ‘…an organisation or individual, who prepares or modifies a design for a construction project (including the design of temporary works); or arranges for, or instruct someone else to do so.’
In the first instance, designers are likely to be members of the consultant team appointed by the client. Typically, this will include:
- Architects.
- Architectural Technologists.
- Structural engineers.
- Services engineers.
- Landscape designers.
However, the increasing complexity of building design means that there is an ever greater need for further specialist design input such as:
- Specialist facilities designer (such as kitchens, operating theatres, swimming pools, recording studios).
- Materials designers (such as structural systems, doors and window, glazing or flooring).
- Specialist fixtures and fittings.
- Audio visual equipment.
- Information and communications technology (ITC) installations.
- Safety and security installations.
- Specialist systems (such as baggage handling).
- Specialist lighting.
- Acoustic environment.
This means that as the design progresses, it may be necessary to appoint additional designers. Specialist designers input can be obtained from:
- Contractors or suppliers appointed in the first instance to carry out design and subsequently to carry out the works on site or to supply the goods or services.
- Consultants appointed by the client to carry out design and then monitor works on site (these may be sub-consultants to an existing member of the consultant team). Additional design consultants might include:
- Acoustic consultant.
- Ecologist.
- Environmental consultant.
- Facilities management consultant.
- Fire engineering consultant.
- Health and safety consultant.
- Inclusive Design (Access) consultant
- Interior designer.
- Information and communications technology consultant.
- Landscape consultant.
- Lighting designer.
- Masterplanner.
- Public health consultant.
- Security consultant.
- Transport/traffic engineer.
For designers to work effectively as a team they should adopt collaborative practices as early in the project as possible. The requirement to adopt such practices should be included in appointment documents. The client may wish to allocate the roles of lead designer and lead consultant to co-ordinate the work of the rest of the team.
It might also be appropriate to appoint a design co-ordinator (for the co-ordination and integration of design prepared by specialist contractors) and a computer aided design (CAD) and/or building information modelling (BIM) co-ordinator and BIM information manager. Contractors may appoint their own design managers to co-ordinate their own design and that of sub-contractors.
For detailed descriptions of the sequence of activities necessary to appoint designers, see the free work plan stages:
- Traditional contract: appointment.
- Design and build: appointment.
- Public project: appointment.
- Construction management: appointment.
- Management contract: appointment.
NB: In a submission to the Inquiry into the Construction of Edinburgh Schools in 2016, The Royal Incorporation of Architects in Scotland (RIAS) criticised the transfer of responsibility from construction professionals to other parties less involved with the design process and sited the dilution of the role of the design team as one of the causes of poor quality construction.
See Inquiry into the construction of Edinburgh schools view of the RIAS for more information.
Commissioning Air Systems (BG 49/2015), written by Chris Parsloe and published by BSRIA in March 2015, explains how to commission ducted air distribution systems in buildings. It defines the designer for the purposes of the guide as: ‘The organisation (firm or persons) responsible for the design of the air systems that are to be commissioned. Depending on the method of procurement this may be one or more organisation. In many instances the design intent of the air systems may be set out by one organisation, with the final selection of some, or all, of the individual components (main plant, fans, terminal equipment, control and regulating dampers etc.) by another organisation. Where this is the case the final system flow rates should be provided by the organisation that has selected the components, however this responsibility should be clearly set out in the contract documents.’
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Architect.
- Building Information Modelling.
- CDM 2015 designer duties.
- Collaborative practices.
- Concept design.
- Consultant team.
- Consultant team start-up meeting.
- Contractors.
- Construction team.
- Design.
- Design and build.
- Design liability.
- Design methodology.
- Design process essentials.
- Design responsibility matrix.
- Design team meeting.
- Design workshop.
- Detailed design.
- Fees.
- Fire safety engineer.
- Interior designer.
- Lead consultant.
- Lead designer.
- Professional indemnity insurance.
- Services engineer.
- Structural engineer.
- Specialist designers.
- Team management.
[edit] External references
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.