Quantity surveyor
Contents |
[edit] Role
Quantity surveyors (sometimes referred to as cost consultants or commercial managers) provide expert advice on construction costs. They help to ensure that proposed projects are affordable and offer good value for money, helping the client and the design team assess and compare different options, and then track variations, ensuring that costs remain under control as the project progresses. Quantity surveyors can specialise in a specific aspect of construction costs, or in a particular type of construction.
Tasks will vary depending on the nature of the project, but they might include:
- Helping determine the client's requirements and undertaking feasibility studies.
- Benchmarking requirements against similar projects.
- Assessing and comparing options.
- Helping define the project budget.
- Checking developing designs against the project budget.
- Assessing value for money.
- Checking designs meet legal and quality standards.
- Undertaking risk management and value management exercises.
- Preparing cost plans, estimates and cash flow projections.
- Advising on procurement strategy.
- Advising on packaging.
- Preparing bills of quantities.
- Preparing tender pricing documents.
- Collating and issuing tender documentation.
- Assessing tenders.
- Estimating the cost of variations.
- Preparing valuation statements for interim certificates.
- Assisting with the valuation of claims.
- Preparing regular cost reports, including out-turn cost and cash flow.
- Completing the final account.
Specialist activities might include:
- Allocating work to subcontractors (if working for the contractor).
- Advising on tax issues.
- Advising on facilities management.
- Life cycle costing.
- Obtaining funding.
- Advising on repairs and maintenance costs.
- Advising on specialist construction works and building types.
For further information, see Quantity surveyor’s fees.
[edit] Qualification
To become a Chartered Quantity Surveyor a degree or professional qualification accredited by the Royal Institution for Chartered Surveyors (RICS) is generally required, or trainees can study part-time whilst working in a technician role. Chartered Quantity Surveyor's must pass an Assessment of Professional Competence (APC) and become a member of the Royal Institution of Chartered Surveyors (RICS).
The RICS 'Black Book' provides a set of standards by which RICS members should operate.
The RICS provide a finder service to help find quantity surveyors appropriate for different types of work.
NB: Whilst cost consultants on construction projects are generally quantity surveyors by profession, accountants and other professionals can also prove effective.
To see some of the modules studied as part of quantity surveying degree courses, see Commercial management and Quantity surveying course essentials.
[edit] Cost planning
Cost plans evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by contractors and suppliers:
- Initial cost appraisal (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
Other than initial cost appraisals, these all relate to the construction cost of a project (rather than wider project costs that the client might incur, which could include; fees, equipment costs, furniture, the cost of moving staff, contracts outside of the main works and so on). It is important therefore that the client makes clear what costs should be monitored by the quantity surveyor and what will remain within the control of the client organisation.
Quantity surveyors rely on services such as Building Cost Information Service to help them determine accurate costs, and increasingly project information is generated from Building Information Modelling (BIM).
[edit] Related articles on Designing Buildings
- Accounting.
- Appointing consultants.
- Bill of quantities.
- Building People.
- Chartered surveyor.
- Commercial manager.
- Common arrangement of work sections.
- Comparison of SMM7 with NRM2.
- Cost.
- Cost and bonus surveyor.
- Cost consultant.
- Cost management techniques used to monitor the cost of construction projects.
- Cost plan.
- Design economics.
- Estimator.
- Life cycle assessment.
- Measurement.
- New Rules of Measurement.
- Professional indemnity insurance.
- Quantity surveyor’s fees.
- Royal Institution of Chartered Surveyors.
- Surveyor.
- Sustainability quantity surveyor.
- Whole life costs.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























Comments