Cost consultant
Typically cost consultants are quantity surveyors by profession, but accountants and other professionals can also be effective cost consultants.
The cost consultant provides estimates, and advice regarding the cost of construction works.
The cost consultant's role might include:
- Helping determine the client's requirements and undertaking feasibility studies.
- Benchmarking requirements against similar projects.
- Assessing and comparing options.
- Helping define the project budget.
- Checking developing designs against the project budget.
- Assessing value for money.
- Checking designs meet legal and quality standards.
- Undertaking risk management and value management exercises.
- Preparing cost plans, estimates and cash flow projections.
- Advising on procurement strategy.
- Advising on packaging.
- Preparing bills of quantities.
- Preparing tender pricing documents.
- Collating and issuing tender documentation.
- Assessing tenders.
- Estimating the cost of variations.
- Preparing valuation statements for interim certificates.
- Assisting with the valuation of claims.
- Preparing regular cost reports, including out-turn cost and cash flow.
- Completing the final account.
There are very many different names given to cost planning documents. Cost plans are generally prepared by cost consultants (often quantity surveyors). They evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers. They range from very early initial cost appraisals through to tender pricing documents and the final account.
As a consequence there area a great number of names that can be used for key cost planning information. On Designing Buildings Wiki we have standardised these as follows:
- Initial cost appraisals (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
Other than initial cost appraisals, these all relate to the construction cost of the project (rather than wider project costs that the client might incur, which could include; fees, equipment costs, furniture, the cost of moving staff, contracts outside of the main works, and so on). It is important that the client makes clear what costs should be monitored by the cost consultant and what will remain within the control of the client organisation.
Initial cost appraisals are carried out without the benefit of a design for the project. They include client costs that may not feature in later cost plans and as a result will almost certainly need input from the client's finance director or financial advisers. Once the initial cost appraisal is completed, the client will decide the scope of costs that will in future be monitored by the cost consultant and those that will be monitored and controlled by the client organisation.
For detailed descriptions of the sequence of activities necessary to appoint a cost consultant, see the work plan stages:
- Traditional contract: appointment.
- Design and build: appointment.
- Public project: appointment.
- Construction management: appointment.
- Management contract: appointment.
[edit] Related articles on Designing Buildings
- Accounting.
- Approximate quantities cost plan.
- Bid writer.
- Budget.
- Building People.
- Business plan.
- Cash flow.
- Chartered surveyor.
- Commercial manager.
- Consulting engineer.
- Construction buyer.
- Contract sum analysis.
- Cost control.
- Cost savings.
- Cost and bonus surveyor.
- Cost plans.
- Elemental cost plan.
- Estimator.
- Final account.
- Front-loaded costs.
- Initial cost appraisal.
- Interim certificate.
- New Rules of Measurement.
- Pre-tender estimate
- Professional indemnity insurance.
- Whole life costing.
- Quantity surveyor.
- Sustainability quantity surveyor.
- Tender pricing document.
- Variations.
- Whole life solution
[edit] External references
Featured articles and news
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.