Client requirements
The client's requirements for a project might initially include a vision, mission and objectives for what they wish the project to achieve. They might first be explored by a client when they identify a need which might result in the requirement for a certain equilibrium that has been neutralised and factored into the equation.
A statement of need, might then be prepared which is a first attempt to describe the possible requirements of the project. This may or may not result in the development of a new project.
See Statement of need for more information.
If the project does proceed, the client may then develop their requirements into a strategic brief. Initially, this just describes the client's requirements in sufficient detail to allow the appointment of consultants (such as an architect, engineers and so on). Once consultants are appointed, the strategic brief may be developed further to allow feasibility studies and options appraisals to be carried out.
See Strategic brief for more information.
Once the preferred option for the project has been selected, the strategic brief is typically developed into a full project brief. This is the key document upon which the design will be based.
See Project brief for more information
- The RIBA Plan of Work 2020 suggests that the client requirements are: 'A statement or document that defines the Project Outcomes and sets out what the client is seeking to achieve. It is used to develop the Business Case, which examines any viable options that meet the Client Requirements.' It goes on to suggest that: 'The Client Requirements set out what the client is trying to achieve. For example, two residential clients might have the same Spatial Requirements (say, a new kitchen and an extra bedroom); however, one might be about to sell their property and is looking to increase its sale price while the other has a new baby and wants to consolidate their position close to good local schools. While the Spatial Requirements for both clients are the same, it is unlikely that their desired Project Outcomes will be the same, so a different Business Case and Project Budget is required for each. The Client Requirements allow the project team to explore viable options, determine the pros and cons for each and, ultimately, recommend the option best suited to deliver the Client Requirements. When this recommendation constitutes a project, and it is signed off by the client, the more nuanced and detailed Project Brief can be prepared.'
- The term 'Employer's requirements' refers to the formal client's requirements on design and build projects or on a traditional contract where the contractor is to design discrete parts of the works. See Employer's requirements for more information.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.