Cost reporting
Cost reporting is a process used to inform a client (or other party) about the magnitude of a construction project’s predicted, or actual cost. This can be expressed either in absolute terms or as a variance compared to the project budget.
Cost reports are typically prepared by a cost consultant (such as a quantity surveyor) and updated regularly (perhaps monthly), to keep the client informed and to help them and the project team control costs.
Typically, cost reports will evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers, and actual costs incurred.
A cost report will generally include all the costs incurred by the date of the report, where they are known, a forecast of the costs likely to be incurred during the rest of the project, in so far as these can be foreseen and estimated, and risk allowances for the possibility of unforeseeable costs. Contingencies to cover these risks are often expressed in terms of percentages. The percentages applied are at their greatest in the early stages of the project when there are the greatest number of possible risks, but they can then be reduced as better particulars about the project become available and some risks have passed or been overcome.
It is important to be clear what costs will be included in cost reports. For example, the client may have costs that, whilst they are directly related to the project, they would prefer to account for them themselves. This might include; land acquisition costs, specialist plant or equipment, furniture, construction contracts outside of the main contract and so on.
In the absence of a single, standard type of cost report format, or specific formatting requirements by the client, most cost consultants will develop their own format for cost reports.
[edit] Related articles on Designing Buildings
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.