Keep
The Guild of Architectural Ironmongers publication Glossary of architectural hardware terms defines a keep as an 'alternative word for a staple or strike plate i.e. the part of the lock which receives the bolt and secures the door.'
A strike plate is defined in the same document as 'a flat metal plate fixed to the door frame into which the bolt or bolts shoot. There is a shaped or bevelled lip on one side to guide the latchbolt. A strike plate is always provided with a mortice lock or latch, and with rim locks on an outward opening door.'
[edit] Related articles on Designing Buildings
- Access control.
- Active door leaf.
- Digital door lock market.
- Doors.
- Emergency Exit Device.
- Entry control.
- External doors..
- Fire Door Inspection Scheme.
- Fire door.
- Fire Doors (DG 524).
- Fire.
- Grenfell tower.
- Hinge.
- Home security solutions market.
- How door locks work.
- Installing fire doors and doorsets (GG 86).
- Intumescent strip.
- Mortice lock.
- Mortise vs mortice.
- Noise - doors and windows.
- Outbuildings security.
- Perimeter security.
- Protected door.
- Self-closing device.
- Security and the built environment.
- Security glazing.
- Slave door leaf..
- Smoke control door.
- Sneck.
- Types of alarm.
- Types of door
- Types of lock.
- Width of doors stairs and escape routes.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
















