Detailed design stage in building design
Detailed design is sometimes referred to as 'developed design' or 'definition'. It is the process of taking on and developing the approved concept design.
By the end of the detailed design process, the design should be dimensionally correct and co-ordinated, describing all the main components of the building and how they fit together. However, technical aspects of the design may require further development, design by specialists may not yet have been fully incorporated into the design and it will not have been packaged for tender.
Detailed design should provide sufficient information for applications for statutory approval to be made.
Detailed design should include:
- Overall layout.
- Road layouts and landscape.
- Operational flows and departmental operational policies.
- Horizontal and vertical circulation routes, including accessibility requirements.
- Schedules of accommodation, including occupancy numbers for each space.
- Identification of standard and non-standard room layouts.
- If appropriate, room data sheets.
- Building dimensions and gridlines.
- Architectural plans sections and elevations of buildings, parts of buildings and components, including:
- Block plans.
- Site plans and external works.
- Changes in floor levels.
- Expansion joints.
- Demarcation of changes to finishes.
- Reflected ceiling plans.
- Outline specification including schedules of components, defining the performance and/or material standards required (including colours).
- Elements of design that require specialist input or early choice of manufacturer. Designers should investigate suppliers certificates, warranties and compliance with standards.
- Requirements for mock-ups, testing, samples or models necessary to satisfy performance or public relations requirements (including computer generated images).
- Key assemblies, component drawings and schedules with special attention to junctions and interfaces between elements which will influence the structural or services designs or have an effect on the spatial allowances. Key details will include:
- External walls, lining, cladding, glazing, windows and blinds.
- Balconies, canopies and entrances.
- Roofing and finishes, rooflights, drainage, gutters and outlets.
- Floor constructions and finishes.
- Staircases.
- Damp proof courses.
- Service duct and services plan enclosures.
- Load bearing internal walls and partitions, including lifts and other shafts.
- Non-load bearing partitions.
- Ceiling construction and support.
- Overall dimensions and fixing details for fixed equipment such as sanitary fittings and joinery.
- Roads, paths, paving, boundaries and retaining walls.
- External gradients and falls including gutters and outlets.
- Components that can be standardised, mass produced or prefabricated, resulting in reduced costs or reduced construction durations.
- Initial schedules indicating:
- The location of all structural elements in relation to gridlines.
- Dimensions and sizes of beams, columns, walls and slabs.
- Sketch details of junctions and proposed fixings.
- Superimposed loading allowances for each floor slab.
- The proposed discipline for all holes giving range and sizes permissible.
- An outline specification including total weights of reinforcement.
- The detailed design should highlight any changes from the concept design and provide the services engineer with sufficient information to undertake the services design.
- Building services plans, sections and elevations showing:
- Plumbing and drainage (high and low level).
- Ductwork.
- Heavy pipework.
- Electrical trunking.
- Light pipework.
- Electrical control wiring.
- Radiators.
- Plantroom layouts.
- Riser drawings.
- Access requirements and builders work in connection.
- Define phases if the project is to be phased. This can be complicated by items that appear in buildings intended for later phases, but that are required for the operation of earlier phases, for example boilers or escape stairs.
- Safety strategy.
- Fire strategy, including:
- Zoning and compartmentation.
- Separation (such as fire resistance of compartments, restriction of openings between compartments and distances to boundaries).
- Protected shafts (staircases and services).
- Surface spread of flame and escape strategy (including travel distances and staircase widths).
- Active measures such as detection, ventilation, alarms, sprinklers.
- Minimum ventilation requirements where no mechanical ventilation is provided.
- Dry risers and hose reels.
- Uninterrupted power supplies.
- Fire rated cables.
- Acoustic separation and acoustic conditions (reverberation times etc).
- The use of materials and the potential for re-use, recycling and waste handling (see site waste management plan).
- Detailed cost plan showing the capital and lifecycle costs for all the components.
- Risk assessment including operational issues such as; lifts (goods / passenger / fire and other equipment that may require a lifting certificate and cleaning cradles), cleaning of atrium roofs and facade etc.
[edit] Related articles on Designing Buildings
- Block plan.
- Briefing documents.
- Client.
- Concept design.
- Concept architectural design.
- Concept architectural design checklist.
- Demystifying design processes of architectural details.
- Design.
- Design phase.
- Design process essentials.
- Design quality.
- Design review.
- Design risk management.
- Detailed design report.
- Detailed services design.
- Detailed structural design.
- Location plan.
- Project performance management.
- Stakeholders.
- Structural design.
- User panels.
- Value management.
- Whole life costs.
[edit] External references
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.