Damp-proof course DPC
Contents |
[edit] What are the causes of damp in buildings?
The most common causes of persistent damp in buildings are:
- Condensation (surface or interstitial).
- Penetrating damp.
- Rising damp.
For more information see: Damp in buildings.
Rising damp is caused by capillary action drawing moisture up through the porous elements of a building’s fabric. Rising damp, and some penetrating damp, can be caused by faults to, or the absence of a damp-proof course (DPC) or damp-proof membrane (DPM).
[edit] What problems does damp cause?
Damp in buildings can cause a number of serious problems, such as:
- Damp patches.
- Mould growth, which is a cause of respiratory allergies.
- Mildew, salts, staining and ‘tide marks’.
- Damage to surface finishes.
- Corrosion and decay of the building fabric.
- Slip hazards.
- Frost damage.
- Poor performance of insulation.
- Damage to equipment, or electrical failure.
[edit] What is a damp-proof course?
A damp-proof course is a barrier, usually formed by a membrane, built into the walls of a property, typically 150 mm above ground level, to prevent damp rising through the walls. Historically, damp-proof courses may have been formed using bitumen, slates, lead, pitch, asphalt or low absorption bricks. They emerged during the Victorian era and are commonly found in buildings from around 1900.
For more information, see Types of damp-proof courses.
[edit] Are damp-proof courses required?
Damp-proof courses are now required in the construction of new buildings to prevent rising damp and in some situations to prevent penetrating damp. Approved document C of the Building Regulations, Site preparation and resistance to contaminants and moisture, suggests that a damp-proof course may be a, ‘…bituminous material, polyethylene, engineering bricks or slates in cement mortar or any other material that will prevent the passage of moisture.’
Approved document C requires that, to prevent rising damp, a damp-proof course should be:
- Continuous with any damp-proof membrane in the floor.
- At least 150 mm above the level of the adjoining ground if it is in an external wall.
- If it is in an external cavity wall, the cavity should extend at least 225 mm below the damp-proof course, or a cavity tray should be provided with weep holes every 900 mm so that water running down the cavity cannot pass to the inner leaf.
[image source Approved document C, Site preparation and resistance to contaminants and moisture]
A damp-proof course may also be required:
- In masonry walls below a coping, where the coping is constructed from a material that is not impervious to water.
- In the joints between walls and door and window frames.
- In suspended timber ground floors between the timber and materials that can carry moisture from the ground.
Standards for damp-proof courses are provided in BS 8215:1991 Code of practice for design and installation of damp-proof courses in masonry construction.
[edit] Inserting a damp-proof course in an existing building
The absence of a damp-proof course in older buildings can be rectified by creating a moisture-impermeable layer, either by the insertion of a damp-proof course, or by the injection of water-repellent chemicals. Treatment generally also involves remedial work to any corroded or decayed elements of the building fabric, as well as hacking off and replacing existing plaster to a height of 1 m.
For more information see: Chemical injected DPC.
However, damp in older buildings is actually often caused by a leak or a defect in the wall construction, such as a cracking, rather than by rising damp, and this may not be rectified by the insertion of a damp-proof course. It is important therefore that any defects are properly identified and corrected first before accepting the cost and disruption of inserting a damp-proof course.
Where it is not possible to insert a damp-proof course 150 mm above the external ground level, for example if the building has a solid external wall and the internal floor level is less than 150 mm above the external ground level, external drainage solutions may be necessary, such as the installation of a french drain.
[edit] Related articles on Designing Buildings
- Breather membrane.
- Building damp-free cavity walls.
- Cavity tray.
- Cavity wall.
- Chemical injected DPC.
- Condensation.
- Damp.
- Damp proof membrane.
- Dew point.
- Does damp proofing work?
- Flashing.
- French drain.
- Humidity.
- Interstitial condensation.
- Penetrating damp.
- Rising damp.
- Rising damp in walls - diagnosis and treatment (DG 245).
- Types of damp-proof courses.
- Vapour barrier.
- Weep hole.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.






















Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Please note that retrofitting damp proof courses does not work in solid walled constructed buildings and can cause more harm than good. Simply direct water away from the building by having lower external ground levels than internal floor levels where possible and install free flowing land drains around the building.
Can you explain why you think it doesn't work?
Solid walled structures are designed to operate differently from modern buildings. Solid walled structures are designed to allow moisture to freely flow within the brickwork and evaporate naturally. The application of a modern material/ damp proofing will prohibit this transfer of moisture and lead to interstitial condensation.
I have retrofitted a DPC to a Georgian house, and it did work with no condensation problems.
Good injected DPC companies give a ten year guarantee for their work.