Builder's work in connection
The term ‘builder’s work in connection’ (BWIC) refers to builder's work that is necessary as a result of other works, typically mechanical and electrical services but also specialist installations, such as lifts, escalators, roller shutters, hoists and cleaning cradles, and so on.
For example, the installation of mechanical and electrical services might require:
- Cutting, forming or drilling through walls, floors or ceilings to allow services to pass.
- Ensuring structural integrity is not compromised.
- Chasing block and brickwork for conduits or pipes.
- Lifting and replacing floors.
- Asbestos removal.
- Plant moving services.
- Sealing holes.
- Reinstating fire, thermal or acoustic separation.
- Constructing plinths.
- Making good plaster and other finishes.
- Maintenance access requirements such as access panels, decking, platforms, cat ladders and handrails.
This may involve works that require building regulations approvals and possibly testing certificates (for example, cleaning cradle restraining bolts).
Builder's work in connection is generally carried out by the main contractor for a mechanical and electrical sub-contractor and other such specialist trades. However, sometimes, the mechanical and electrical works might be part of the main contract and the builders work in connection sub-contracted.
Builder’s work in connection should not be confused general site preliminaries such as; welfare provisions, site offices, plant, site waste clearance, and so on, which are priced separately.
Estimators typically price builder's work in connection as 7% of the specialist work value.
[edit] Related articles on Designing Buildings
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”