Curtain wall systems
Curtain wall systems are non-structural cladding systems for the external walls of buildings. They are generally associated with large, multi-storey buildings.
Curtain walls separate the interior from the exterior, but only support their own weight and the loads imposed on them (such as wind loads, seismic loads, and so on) which they transfer back to the primary structure of the building. This is in contrast to many forms of traditional construction in which the external walls are a fundamental part of the primary structure of the building.
Typically curtain wall systems comprise a lightweight aluminium frame onto which glazed or opaque infill panels can be fixed. These infill panels are often described as 'glazing' whether or not they are made of glass.
Curtain wall systems emerged in the 19th century with the development of large glass panels and became more common from the 1930's when aluminium was made available as a construction material for the first time.
They are now closely associated with the modernist movement and in particular, the International style, which became popular in the middle of the 20th century. This was an ornament-free, stark form of modernism, characterised by the repetition of units and the extensive use of glass. It is a style that is still in widespread use for tall buildings in cities around the world.
Curtain wall systems can be custom designed and manufactured, but are often manufacturer's proprietary systems that can be bought 'off the shelf'. Custom-designed systems are generally only cost effective for larger buildings.
Curtain walls can adopt a 'stick' system, or can be unitised:
- Stick systems are installed piece by piece on site, with the glazing inserted into the frame from the inside or the outside depending on access conditions.
- Unitised systems are pre-fabricated in modules off-site and delivered in panels. Unitised systems are better able to exploit the benefits of factory condition manufacturing and quality control and require lower installation time on site.
There are a wide range of possible infill panels for curtain wall systems, including:
- Vision glass (which may be double or triple glazed, may include low-e coatings, reflective coatings and so on).
- Spandrel (non-vision) glass.
- Aluminium or other metals.
- Stone or brick veneer.
- Terracotta.
- Fibre-reinforced plastic (FRP).
- Louvres or vents.
Panels are often composites, with the facing materials bonded to, or 'sandwiching' an insulated core such as polyethylene (PE) or polyurethane (PUR), a profiled metal core or a mineral core. See Metal composite panels for more information.
Frame and panel designs are very complex, as they need to perform multiple functions:
- Transferring loads back to the primary structure of the building.
- Providing thermal insulation and avoiding cold bridging and condensation.
- Providing fire, smoke and acoustic separation. This is particularly difficult at joints between the curtain wall system and interior walls and floors.
- Creating a barrier to water penetration.
- Accommodating differential movement and deflection.
- Preventing panels from falling out of the frame.
- Allowing for opening windows.
- Preventing the accumulation of dirt.
On tall buildings, access systems must be provided to allow regular inspection, maintenance, cleaning and replacement (in particular, replacement of external seals).
Systems used to prevent the passage of water through joints (driven by pressure differences between the inside and outside) include; face-sealed, water-managed and pressure-equalised (PE or 'rainscreen') systems.
Pressure-equalised systems create a rebate between the internal and external gasket that is ventilated to the outside so that there is no pressure difference between the outside and the rebate. As a result, water is not driven into the rebate by a pressure difference that would otherwise build up across the outer gasket. Any rain that penetrates the outer seal can be drained to the outside through the vents, or weep holes. This is considered to be more reliable than face-sealed systems that attempt to create a 'perfect' seal which inevitably fails due to pressure-driven moisture.
Water-managed systems are similar to pressure-equalised systems, but there is no attempt to prevent water penetrating the outer seal, and so the primary function of weep holes or drains is to drain water rather than to allow pressure equalisation.
See Rainscreen for more information.
There is very good technical information about the design of curtain wall systems on the Whole Building Design Guide website (USA National Institute of Buildings Sciences), including typical details.
[edit] Related articles on Designing Buildings Wiki
- Brick veneer.
- British post-war mass housing.
- Building fabric.
- Cladding.
- Composites.
- Facade cleaning.
- Fire.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Glass block wall.
- Glass mullion system.
- Infill panel walls.
- Load-bearing wall.
- Louvre specifications.
- Metal composite panels.
- Off-site prefabrication of buildings: A guide to connection choices.
- Patent glazing.
- Polyurethane (PUR).
- Prefabrication.
- Rainscreen.
- Sandwich panel.
- Structural glass assembly.
- Structural Insulated Panels.
- Stud.
- The David Lloyd Lymington Sports Village.
[edit] External references
Featured articles and news
Apprenticeship announcement by the Prime Minister
Welcomed but with call for more actionable detail.
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Comments