Hilton Tallinn Park case study
|
|
|
Contents |
[edit] Introduction
The Hilton Tallinn Park, Estonia is a landmark hotel striving towards more sustainable performance. By following BREEAM In-Use, the project management team could adhere to a clear system to help them evaluate the existing building and compare it with best practices to support a sustainable renovation.
[edit] Building specifics
The building is located in the city centre of Tallinn, Estonia. It was built on a previously developed plot. The previous structures were dismantled and the new building was built from 2014 to 2016.
The building has 11 above ground floor levels and one below ground parking floor. The total floor area is close to 20,000 m2. The dominant use of the building is hotel rooms on floors 3 to 11. The second largest occupant is a casino located at ground floor level.
The current main tenant Hilton is aspiring to fulfil increasing demand from clients for more sustainable buildings to stay in or organise conferences in. For that reason, the current BREEAM In-Use Part 1 certification can be considered the first step to improve building performance. It is hoped that Part 2 certification will be applied for and achieved.
[edit] Green Strategy
The client’s wish was to certify the building to the highest certification level possible. The aim from the beginning was to reach a rating of at least ‘Very Good’. Using BREEAM In-Use the client got an insight into how to achieve a high quality and sustainable building.
Even though the building is recently built, there were quite a few issues in different categories that were not clearly covered by project documentation. To overcome obstacles, a couple of additional surveys and audits were conducted to identify the actual situation.
[edit] Energy highlights
The building has a very large proportion of windows and a reasonably narrow floor plan, allowing high daylight levels. Hotel clients are able to regulate thermal comfort in their rooms. Guests are able to adjust heating and cooling as well as modifying the air speed.
The building is equipped with a heating system less than five years old along with cooling and mechanical ventilation equipment. The building is connected to a district heating network with high heat source efficiency. Some areas of the building have occupancy sensor-controlled lighting which helps to avoid unnecessary energy use when not needed.
The building is located very close to the city centre with excellent access to public transport and several amenities in walking distance. Employees have the opportunity to commute with bicycles; there are secure bicycle parking spaces as well as changing and showering facilities.
The building’s water consumption is measured and measurements are accessible through BMS. The building is equipped with water efficient dual-flush WCs. All urinals in the building are water efficient and controlled by PIR sensors which, in combination, guarantee low water consumption. The conference rooms' large toilet areas are equipped with water efficient contactless hand washing fixtures.
Building security systems have been designed according to local best practices. The installed security system is certified according to international security standards. The building is in an area where no natural hazards are present.
There are four separate waste containers to collect four types of recyclable waste streams. Additionally, batteries and light bulbs are collected separately to avoid disposal at landfill stations.
The landscaping contains grassed areas and trees around the asset.
[edit] Engineering assessment
Jüri Padisaar a chief engineer at Hilton Tallinn Park feels the outcome has been beneficial for Hilton, a global player in the hospitality market. He explains, "Clients are becoming more aware of the sustainability and are more interested in the steps that companies take to make a change in their everyday procedures. To be able to show our clients the efforts that the company goes through to make the hospitality a more eco-friendly business puts us in a better position to secure new business; it also makes us proud to make an effort to show kindness towards nature.”
This article originally appeared on the BREEAM website. It was published in August 2020.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.