External wall insulation
Thermal insulation can be used to reduce the tranmission of heat between the inside and outside of an enclosed space such as a building.
External wall insulation (EWI) is the application of thermal insulation to the external walls of buildings - generally referring to the application of thermal insulation material and a finish system to the outside face of the external walls of an existign building to improve its thermal performance. The analogy that can be made is that of a tea cosy placed around the building.
Benefits of EWI can include:
- Reduced heat losses, lower heating bills and improved carbon footprint.
- Reduced the risk of condensation (if installed correctly).
- Allows a choice of colour and texture of finish that can enhance a building.
- Can reduce solar heat gains in the summer.
- It does not reduce internal floor area.
- Improved weather resistance.
- Improved internal comfort.
- Preserves the substrate (eg old brickwork), extends its life and reduces moisture content.
- Work can be undertaken without disruption to the building’s interior.
However, external wall insulation makes walls signicantly thicker. This is noticeable at door and window openings, and may be difficult to accommodate under roof overhangs, or may make roof overhangs less attractive. In addition, it can make walls more difficult to access, and can conceal problems cuased by the insulation, or problems that were not properly rectified before the insulation was applied.
[edit] Types of external wall insulation
Traditionally, thermal insulation and weather protection could be imparted to an external wall by fixing clay tiles, slate or brick slips. Alternatively, a cheaper and faster method was to apply a one-coat render that may include aggregates and painted for an attractive textured finish.
Rough cast render is widely used in Scotland and comprises a top-coat render and aggregate (or graded hard stones) applied as a slurry-type consistency and resulting in a lumpy finish. Such renders may include waterproofing agents for better moisture resistance
Today, there are numerous types of advanced external wall insulation (EWI) systems available for solid external walls (ie, those without a cavity) and many are based on the same three-layer concept, namely:
- Insulating layer: traditionally this was a render (typically cement and sand with an insulating material) trowelled over the substrate. More popular today are insulation boards of expanded/extruded polystyrene, polyurethane, phenolic, isocyanurate or other lightweight material. The insulating boards can be fixed relatively quickly to the substrate either by physical connectors or adhesive, or both.
- Reinforcing layer: once in place, the boards are given impact protection and resilience with a layer of metal or plastic mesh.
- Weatherproof finishing layer: the assembly is finished with a final layer of render that combines weather protection and decoration. Alternatively, tiles or brick slips held on a supporting backing plate can be used as the final top layer (see below). The thickness of the total build-up applied to the wall will depend on the heat transmission requirements (U-values) prevailing at the time in the relevant building regulations.
The UK-based Mortar Industry Association states that specialist renders available from its members may be used for external thermal insulation composite systems (ETICS). It states they will usually contain relatively large amounts of polymeric material and resist thermal shock, have acceptable impact resistance and have good adherence qualities.
The thermal properties of such renders are improved by additives that may include a lightweight mineral aggregate such as perlite, vermiculite or expanded or sintered clay, or an organic product such as expanded polystyrene.
[edit] Other types
Slips provide a traditional brick finish and can be used in place of a top-coat render. A backing plate attached to the insulation layer supports the slips and allows them to be placed quickly in horizontal rows. Once set, the gaps between them are filled with mortar to give a traditional 10mm brick joint.
Simulated brick renders: a brick effect is cut into the top layer of a polymer-modified external cementitious render (3-4mm thick) while it is setting. Cutting-in the brick effect exposes the coloured backing to give the effect of cement mortar joints.
Terracotta tiles: they can be supported on aluminium rails fixed to the substrate in a rainscreen-type application. Insulation is laid in the void. An alternative to terracotta is timber boards that have a shiplap profile.
Composite cladding systems: usually for larger commercial or residential buildings. An aluminium framework is fixed to the building's exterior. Insulated cladding panels are fixed to the new framework to provide better thermal insulation and possibly better aesthetics. This is similar to the system used on the ill-fated Grenfell Tower.
[edit] Related articles on Designing Buildings Wiki
- ACM cladding.
- Approved Document B.
- Brick veneer.
- BS 8414 Fire performance of external cladding systems.
- Building a safer future: an implementation plan.
- Celotex RS5000 PIR insulation.
- Cladding for buildings.
- Consultation on banning the use of combustible materials in the external walls of high-rise residential buildings.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire risk in high-rise and super high-rise buildings DG 533.
- Grenfell fire door investigation.
- Grenfell Tower articles.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower Inquiry.
- Independent review of the building regulations and fire safety.
- Masonry.
- Pebbledash.
- Rendering.
- U-values.
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.