Articles about the Grenfell Tower fire are written by our editors and updated regularly. Scroll to the bottom of the articles for the latest developments:
- The overall story.
- Hackitt review of the building regulations and fire safety, final report.
- Public Inquiry.
Other related articles include:
- ACM cladding.
- ACM cladding testing by BRE.
- Addressing building failures: Grenfell Tower and Edinburgh schools.
- Advice for External Wall Insulation (EWI) systems with a render or brick-slip finish.
- Advice note for external wall systems that do not incorporate ACM.
- BS 8414 Fire performance of external cladding systems.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- BS 9991:2015 Fire safety in the design, management and use of residential buildings. Code of practice.
- Building a safer future: an implementation plan.
- Building a safer future: proposals for reform of the building safety regulatory system.
- Building Safety Bill.
- Building Safety Charter.
- Building safety in Wales.
- Building Safety Regulator.
- Celotex insulation.
- Chief inspector of buildings.
- CIAT response to Grenfell inquiry.
- Competence Steering Group.
- Consultation on banning the use of combustible materials in the external walls of high-rise residential buildings.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire Safety Bill.
- Government response to the Building a Safer Future consultation.
- Grenfell and professional indemnity insurance.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower industry response group.
- Grenfell Tower Inquiry.
- Grenfell Tower Inquiry Phase 1 Report.
- CIAT Grenfell Tower working group.
- HPL cladding.
- ACA response to Hackitt report on Grenfell Tower.
- ICE Grenfell Tower review.
- Joint Competent Authority.
- Independent review of the building regulations and fire safety.
- Lakanal House fire.
- Non-ACM cladding.
- Private v social housing following the Grenfell Tower fire.
- Procurement after Grenfell.
- Rainscreen cladding.
- Raising the bar.
- Reform of building safety standards.
- Ronan Point.
- Setting the bar.
- Systems approach.
- The Cube.
- The Regulatory Reform (Fire Safety) Order 2005.
- Torre Windsor office building fire.
- Grenfell fire door investigation.
Featured articles and news
Guidance for listed building alterations
IHBC resource offers improved consistency.
New laws to ‘retain and explain’ historic statues.
The principles and art of the possible. Book review.
From horse and cart to hypermarket.
Interdependent and interconnected
How elements and processes work together in a systems approach.
Quality Management in Construction
CIOB offers digital guide to proactive methods of working.
Looking ahead to career advancement
Tech will drive professional development in fields tied to infrastructure.
Gereja Ayam (aka the Chicken Church)
The idea for the structure emerged from the architect's dream.
Making adjustments to flues and chimneys
Changing air tightness requirements prompt testing and revisions.
Government takes steps to revise building safety legislation.
Biocement building blocks from bacteria
Product can be 'grown' into bricks or used as a self-healing building material.
CLC offers guidance on contract claims and disputes
Anticipating COVID-19's continuing construction disruptions.