Post-Grenfell product code combats misleading marketing
On 21 September 2021, the Code for Construction Product Information (CCPI) was introduced. The development of the code was to combat misleading marketing claims made by manufacturers relating to the fire safety of their products. This action followed the public inquiry into the Grenfell Tower fire.
The CCPI was developed by the Construction Products Association’s (CPA) Marketing Integrity Group (MIG), which was tasked with responding to the issues raised in Dame Judith Hackitt’s 2018 report on building safety.
Dame Hackitt said in Building magazine, “Clear and unambiguous product information is an essential element in rebuilding confidence and trust which was lost after the tragedy of Grenfell Tower. I am pleased to see industry taking action.”
Adam Turk, chairman of the CPA’s Marketing Integrity Group, added, “There has been overwhelming support for the principle of the code itself as we endeavour to re-instil confidence in construction products generally. It is now time for our Industry to demonstrate its integrity by getting behind the code and putting building safety first.”
This article originally appeared on the ECA website. It was published on 21 September 2021.
--ECA
[edit] Related articles
- Accreditation body.
- Articles by the Electrical Contractors' Association (ECA).
- Code for Construction Product Information CCPI.
- Construction Products Association CPA.
- Grenfell Tower articles.
- Hackitt review.
- Product manufacturers must regain confidence.
[edit] External resources
Featured articles and news
A transformative shift in the design, construction and management of built assets.
Apprenticeship announcement by the Prime Minister
Welcomed but with call for more actionable detail.
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach 7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Comments