About Buro Happold
Global engineers and consultants
Buro Happold is an independent international practice of consulting engineers. Since 1976 we have grown in size and reach to serve public and private clients across a full range of sectors through an international network of 27 offices.
We draw on the multidisciplinary skills, knowledge and experience of our local experts to design and deliver award winning building, infrastructure and environmental projects that excel for clients, engage with communities and enrich the lives of users.
Sustainability, innovation and holistic consulting are at the heart of everything we do and we are committed to touching the earth lightly. We think harder and are dedicated to addressing the big challenges that face the planet – climate change, population growth and scarcity of natural resources.
Current and recent projects include the Grand Museum of Egypt (Cairo), the Louvre (Abu Dhabi), the Aviva Stadium (Dublin), the London 2012 Olympic Parkwide Design and Olympic Stadium, the King Abdullah Financial District (Riyadh), the Royal Shakespeare Theatre (Stratford) and the O2 Arena (London).
Articles created by Buro Happold on Designing Buildings Wiki include:
Project pages created by Buro Happold on Designing Buildings Wiki include:
Patterns was an occasional, in-house technical journal published by Buro Happold between 1987 and 2011. There were 16 editions of Patterns and 2 special issues:
- Patterns 1: October 1987.
- Patterns 2: April 1988.
- Patterns 3: August 1988.
- Patterns 4: November 1988.
- Patterns 5: May 1989.
- Patterns 6: July 1990.
- Patterns 7: December 1990.
- Patterns 8: May 1991.
- Patterns 9: October 1991.
- Patterns 10: December 1991.
- Patterns 11: August 1993.
- Patterns 12: July 1997.
- Patterns 13: March 2001.
- Patterns 14: March 2005.
- Patterns 15: Autumn / Winter 2010.
- Patterns 16: Autumn / Winter 2011.
See also Buro Happold Inclusive Design.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















