Lloyd's Register
Clarity of architectural language is the key to this development, where the function of all constituent elements is celebrated, revealing the secrets of their manufacture and operation.
Lloyd’s Register is an old-established City institution, its Fenchurch Street headquarters the centre of a worldwide operation. The growth of the business during the 1980s led Lloyd’s Register to commission Richard Rogers Partnership (RRP, now Rogers Stirk Harbour + Partners, RSH+P) to prepare proposals for redeveloping its City site. Set within a conservation area, access to the headquarters is through a landscaped churchyard. The site is surrounded by existing buildings, including 71 Fenchurch Street constructed for Lloyd’s Register in 1901.
This Grade II listed building has been incorporated into the new headquarters and extensively restored. The new building comprises fourteen stories of office space and two basements. The floorplates taper in response to the awkward geometry of the site, creating a fan-shaped grid composed of vaults formed around two atria spaces.
This design allows daylight penetration and provides thermal buffers between the offices and the exterior. The building steps up from six to fourteen levels within the centre of the site. Service cores are expressed as towers – two primary circulation cores face the churchyard, while secondary cores to the rear house toilets, goods lifts, staircases, and the main services risers. Highly transparent glazing offers instant legibility – people using the fully glazed wall-climber lifts and stairs animate the building’s exterior.
The glazed façade is designed to maximise daylight while limiting solar heat gain in summer and heat losses in winter. In addition to double glazing, the east and west facades feature panels of motorised louvres. Activated by photo-cells mounted at roof level, when the louvres are angled at 45 degrees the facade system reduces solar heat gain by 90 per cent. Chilled beams incorporating sprinklers, lighting and a PA system cool the air in the office space. The building’s energy efficiency means a reduction of carbon-dioxide emissions by 33 per cent and costs by 40 per cent when compared with a conventionally air conditioned building.
Project information:
- Place/Date: London, England 1993 - 2000
- Client: Lloyd’s Register
- Cost: £70 million
- Area: 34,000 m²
- Architect: Richard Rogers Partnership
- Structural Engineer: Anthony Hunt Associates
- Services Engineer: Ove Arup & Partners
- Quantity Surveyor: AYH Partnership
- Project Manager: Richard Ellis
- Landscape Architect: Edward Hutchison
- Lighting Consultant: Lighting Design Partnership
- Planning Consultant: Montagu Evans
- Fire Consultant: Warrington Fire Research Consultants
- Main Contractor: Sir Robert McAlpine & Sons Ltd
Awards:
- World Architecture Award for Best Commercial Building in the World, 2002
- Civic Trust Award, 2002
- RIBA Award/Stirling Prize Shortlist, 2002
- Aluminium Imagination Awards – Commendation, 2001
- Concrete Society Certificate of Excellence ‘Building Category’, 2000
--RSHP
[edit] Related articles on Designing Buildings Wiki
- 3 World Trade Center.
- 8 Chifley.
- 88 Wood Street.
- BBVA Bancomer headquarters.
- Centre Building at LSE shortlisted for RIBA award.
- Concept architectural design.
- International Towers Sydney.
- Leadenhall Building.
- Lloyd's of London.
- One Park Taipei.
- RSHP
- Skyscraper.
- Taiwan Taoyuan International Airport Terminal 3.
Featured articles and news
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.
Demolition and retrofit approaches in Planning Policy
MHCLG demolition and retrofit survey to inform future updates to national planning policy.
Expert taskforce to spearhead new, new town generation
Sir Michael Lyons given 12 months for recommendations.
Government policy statement on new towns
A coded vision for a new generation of new towns.