Work at height is an everyday occurrence. But if it is not planned and managed properly, experience shows that even simple activity can kill or cause life changing injury.
Although there are many types of work from height, ranging from using mobile elevated work platforms (MEWPs) to step ladders, guidance from the Health and Safety Executive (HSE) refers to a basic ‘hierarchy’ of safety measures, applicable in all cases.
HSE’s hierarchy begins with consideration of how work at height can be avoided, and it ends with using personal equipment that is designed to prevent fall injury. Below, we give examples of what HSE’s hierarchy can mean in building engineering services. We also highlight other essential considerations that will enable managers to develop safe systems of work, help onsite supervisors and crucially, help to protect operatives from falls at work.
Managers (or anyone managing work at height) should follow this general hierarchy of measures wherever possible… | Examples relevant to various types of building engineering services may include… |
1. Avoid working at height Fully assess the task to be undertaken – is it reasonably practicable carry the work out another way other than at height |
|
2. Adopt a practical approach to planning work at height Assess the risks associated with the activity, the working environment and the work style. Consider any situations that may increase the risk of harm. Ensure any changes to work activity are re-assessed, and any changes to the risk of harm are dealt with before work continues. |
|
3. Prevent falls from occurring Identify and utilise an existing safe place of work. |
|
4. Prevent falls through providing collective protection Select appropriate control measures. |
|
5. Prevent falls through providing personal protection Use a work restraint/travel restriction system that prevents a worker getting into a fall position. |
|
6. Minimise the distance and/or consequences of a fall using collective protection Select equipment appropriate to the task and environment. |
|
7. Minimise the distance and/or consequences of a fall using personal protection (the last resort) Select appropriate equipment to the task and environment. |
|
Other essential considerations include…
Skills, knowledge and experience – ensure that
- Work at height is planned and supervised by people who have sufficient skills, knowledge and experience to do the job safely
- Everyone engaged with work at height understands the task-relevant safe system of work (SSoW) and any relevant parts of a Construction Phase Plan (CPP) for construction work
- Anyone under training works only under effective and competent supervision, in accordance with the SSoW
Equipment for working at height – ensure that
- All access equipment to be assembled or installed, used and maintained according to manufacturer’s instructions and current standards
- Where the effectiveness of the equipment depends on how it has been assembled or installed it should be inspected by a competent person before work commences
- Any access or safety equipment should be inspected regularly and any damaged equipment (e.g. due to physical wear) – or any equipment with unauthorised modifications - must be withdrawn, replaced or repaired, as necessary to ensure safety
- Record all equipment inspections at least to statutory guidelines
- All working platforms from where a person could fall must be inspected:
- At least every seven days
- After assembly or adaptation in any position
- After any event likely to affect its strength or stability
- Following the actual deployment of safety equipment (e.g. a fall into a safety net or air bag system)
Other considerations
- Ensure that working surfaces at height are not overloaded with materials or equipment, and that they are kept clear (good housekeeping)
- Ensure workers can get safely to and from where they will work at height
- Ensure all surfaces for placing or attaching access equipment are stable and strong enough for use
- Provide sufficient protection from falling objects (e.g. materials and work equipment) for anyone who may be below
- Ensure that sufficient time has been allocated so that the task can be completed safely
- Do not put or require anyone to work who is unfit to work at height.
This article was written by Paul Reeve, ECA Director of Business. It was originally published by ECA on 8th February 2019 at: https://www.eca.co.uk/blog/february-2019/work-at-height-a-checklist-for-managers
--ECA
[edit] Related articles on Designing Buildings
- Articles by the Electrical Contractors' Association (ECA).
- BS 7883.
- BS 7883 guide released.
- CDM.
- Collective restraint systems.
- CONIAC produces essential messages on safe work at height.
- Crane supports.
- Crane regulations.
- Dynamic self-retracting lanyard.
- ECA.
- Fall arrest system.
- Fall prevention systems.
- FASET.
- Health and Safety.
- How to use a ladder.
- Injuries on construction sites.
- Lifting Operations and Lifting Equipment Regulations (LOLER).
- Near miss.
- Personal protective equipment PPE.
- Safety briefing.
- Safety systems for working at heights.
- Scaffold register.
- Scaffolding.
- Toolbox talk.
- Types of crane.
- Work at height.
- Working at height - our duty to prevent harm and protect each other.
- Work at height rescue plan.
- Working at height training.
- Working platform.
- Work at height regulations.
Featured articles and news
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Comments