MMC terms
5S
active building
Advanced Building Material (ABM)
Advanced Product Quality Planning (APQP)
alternative method tender
Arm’s-Length Body (ALB)
Association for Project Management (APM)
Augmented Reality (AR)
automation, onsite
Bill of Materials (BOM)
Building Energy Modelling (BEM)
Building Information Modelling (BIM)
Building Research Establishment Environment Assessment Methodology (BREEAM)
carbon nano-tube (CNT)
carbon zero
Common Data Environment (CDE)
configuration
configuration management
Construction Industry Training Board (CITB)
Construction Leadership Council (CLC)
delivery phase
design development stage
Design Failure Mode Effects Analysis (DFMEA)
Design for Manufacture (DfM)
Design for Manufacture and Assembly (DfMA)
deskill
Factory Engineered Concrete (FEC)
Failure Mode and Effects Analysis (FMEA)
future skills needs
Globally Unique Identifier (GUID)
hybrid
industry (construction)
information management framework
Infrastructure and Projects Authority (IPA)
Internet of Things (IoT)
Key Performance Indicator (KPI)
Life Cycle Assessment (LCA)
Life Cycle Cost (LCC)
Manufactured Nanotechnology Product (MNP)
Manufacturing Readiness Level (MRL)
Micro/Nano Electromechanical System
Modern Methods of Construction (MMC)
Modern Methods of Construction (MMC) definition framework
non-volumetric unit
Offsite Manufacturing (OSM)
onsite
Permission in Principle (PiP)
Porter’s Value Chain
Pre-Manufactured Value (PMV)
Process Failure Mode Effects Analysis (PFMEA)
productivity gap
Quality Functional Deployment (QFD)
Quality Management System (QMS)
Quality, Cost, and Delivery (QCD)
Research and Development (R&D)
reskill
RIBA Plan of Work [17]
Science, Technology, Engineering and Mathematics (STEM)
sequential tendering
Small and Medium-Sized Enterprise (SME)
Statistical Process Control (SPC)
Technology Readiness Level (TRL)
through-life costing
Total Cost of Ownership (TCO)
transforming construction challenge programme
Transforming Infrastructure Performance (TIP) [65]
Transport Infrastructure Efficiency Strategy (TIES) [66]
Unmanned Aerial Vehicle (UAV)
upskill
Virtual Reality (VR)
wearable technology (or devices)
Whole-Life Cost (WLC)
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























