MMC terms
5S
active building
Advanced Building Material (ABM)
Advanced Product Quality Planning (APQP)
alternative method tender
Arm’s-Length Body (ALB)
Association for Project Management (APM)
Augmented Reality (AR)
automation, onsite
Bill of Materials (BOM)
Building Energy Modelling (BEM)
Building Information Modelling (BIM)
Building Research Establishment Environment Assessment Methodology (BREEAM)
carbon nano-tube (CNT)
carbon zero
Common Data Environment (CDE)
configuration
configuration management
Construction Industry Training Board (CITB)
Construction Leadership Council (CLC)
delivery phase
design development stage
Design Failure Mode Effects Analysis (DFMEA)
Design for Manufacture (DfM)
Design for Manufacture and Assembly (DfMA)
deskill
Factory Engineered Concrete (FEC)
Failure Mode and Effects Analysis (FMEA)
future skills needs
Globally Unique Identifier (GUID)
hybrid
industry (construction)
information management framework
Infrastructure and Projects Authority (IPA)
Internet of Things (IoT)
Key Performance Indicator (KPI)
Life Cycle Assessment (LCA)
Life Cycle Cost (LCC)
Manufactured Nanotechnology Product (MNP)
Manufacturing Readiness Level (MRL)
Micro/Nano Electromechanical System
Modern Methods of Construction (MMC)
Modern Methods of Construction (MMC) definition framework
non-volumetric unit
Offsite Manufacturing (OSM)
onsite
Permission in Principle (PiP)
Porter’s Value Chain
Pre-Manufactured Value (PMV)
Process Failure Mode Effects Analysis (PFMEA)
productivity gap
Quality Functional Deployment (QFD)
Quality Management System (QMS)
Quality, Cost, and Delivery (QCD)
Research and Development (R&D)
reskill
RIBA Plan of Work [17]
Science, Technology, Engineering and Mathematics (STEM)
sequential tendering
Small and Medium-Sized Enterprise (SME)
Statistical Process Control (SPC)
Technology Readiness Level (TRL)
through-life costing
Total Cost of Ownership (TCO)
transforming construction challenge programme
Transforming Infrastructure Performance (TIP) [65]
Transport Infrastructure Efficiency Strategy (TIES) [66]
Unmanned Aerial Vehicle (UAV)
upskill
Virtual Reality (VR)
wearable technology (or devices)
Whole-Life Cost (WLC)
Featured articles and news
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.




















