Preparation and brief project stage
NB the RIBA Plan of Work 2020 renamed this stage 'Preparation and briefing'.
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include (see comparison of work stages), and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Preparation and brief’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for their 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
The preparation and brief stage involves:
- Developing an initial project brief. This may include; considering feedback from previous projects, defining overall spatial requirements, carrying out surveys and quantifying the budget.
- Carrying out feasibility studies.
- Undertaking a project risk assessment, including; planning risks, programme and procurement strategy.
- Assembling the project team and defining their roles and responsibilities.
This preparatory work enables the design process to begin in the next stage ‘concept design’.
The RIBA suggest that this new stage 1 merges the ‘residual’ tasks from the former Stage A ‘Appraisal’ and Stage B ‘Design Brief’.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Briefing documents.
- Comparison of work stages.
- Designing Buildings Wiki Project plans.
- Design responsibility matrix.
- Feasibility studies.
- Project brief.
- RIBA Plan of Work.
- Risk assessment.
[edit] External references
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA calls for an exemption for contractors working away from home.
Fire performance of thermal insulation
Flat roof assemblies with PV.
Become a Professional Development Partner
CIOB launches a new framework for staff development and chartered membership.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.