Project brief for design and construction
Contents |
[edit] What is a project brief?
The project brief is the final stage in the process of defining the client's requirements for the development of a built asset such as a building. It follows the preparation of a number of earlier, less detailed briefing documents:
- The statement of need is the first attempt to describe the possible requirements of the project.
- The strategic brief develops on from the statement of need and describes the client's requirements in sufficient detail to allow the appointment of consultants. It is then developed further with the benefit of comments made by the consultants.
- The project brief is the key document upon which the design will be based.
The project brief will evolve through the project brief stage and the concept design stage with the benefit of information gained from consultations with the client and other stakeholders and ongoing design development.
[edit] How is a project brief prepared?
Preparation of the project brief is likely to be coordinated by the lead consultant.
As well as gathering information about physical requirements, the briefing process should:
- Verify the objectives and priorities of the project.
- Ensure space, time and budget parameters are aligned with the client’s vision and needs.
- Ensure expectations are reasonable and attainable.
- Clarify client roles and the project structure.
- Establish how much the client knows already and their level of experience; do they already have a clear brief?
- Gather contextual information.
- Gather user information.
- Establish the building life span and flexibility requirements.
It may be developed based upon:
- Existing information such as the business case, the statement of need and the strategic brief.
- Feasibility studies and options appraisals.
- Site surveys, site information and site appraisals.
- Analysis of existing accommodation.
- Workshops with champions and user panels to establish needs, expectations and priorities.
- Input from other stakeholders.
- A wider consultation process.
- Interviews.
- User surveys.
- Input from statutory authorities, such as the fire brigade, statutory utilities, local authority, heritage organisations, and so on.
- Information from previous similar projects.
[edit] What should be in the project brief
The nature of the project brief will vary depending on the size and complexity of the project, but it may include:
[edit] A description of the client
- A description of the client's brand, culture and organisation.
- A description of the client's vision, mission and objectives.
- A description of the client's priorities and the criteria that will be used to measure success.
- Organisational structure and decision making processes.
- Changes to the client that the project will bring about.
- Interfaces with other projects.
- Client policies that may be applicable to the project (for example; transport policy, energy policy, natural ventilation policy, sustainability policy).
- Client preferences for the project (for example; image, use of local materials, use of landscape, etc.), and quality expectations (including health and safety, sustainability and design quality).
- A description of the principles that will be adopted in the development of the design.
[edit] Site information
- Building surveys.
- Site surveys.
- Information about ground conditions.
- The location and capacity of utilities.
- Access and other constraints.
- Legislative constraints.
- Existing planning consents.
[edit] Spatial requirements
- Schedules of accommodation, areas and special requirements.
- Schedules of users (including external users), their numbers, departments, functions, organisational structure and operational characteristics.
- Spatial policies (for example, open plan or cellular offices, daylighting requirements, temperature ranges and acoustic standards).
- Required adjacencies, groupings and separations.
- Zoning.
- Circulation guidelines and identification of major circulation flows.
- Phasing.
[edit] Technical requirements
- Structural strategy (columns and gridlines to be adopted, special loads, floor-to-ceiling heights).
- Servicing requirements, including specialist requirements.
- Comfort conditions and level of user control.
- Acoustic requirements.
- Equipment requirements.
- Specialist requirements for furniture, finishes, fixtures and fittings.
- Information and communications technology (ICT) requirements.
- Requirements for specialist processes and plant.
- Fire compartments.
- Maintenance and cleaning requirements.
- Likelihood of future change (for example, staff numbers) and flexibility required.
- Sustainability objectives and energy use targets.
- Safety and security requirements.
- Resilience to potential hazards or threats.
- Waste and water management.
- Pollution control.
- Flexibility and future uses.
- Durability and lifespan.
- Other performance requirements.
- Benchmarking information.
[edit] Component requirements
- Long-lead items.
- Potential requirement for specialist design or specialist contractors design.
- Cladding strategy and materials selection procedures.
[edit] Project requirements and other issues
- Planning requirements.
- Outcome of any consultation processes.
- Budget.
- Project programme and key milestones.
- Known risks.
- Targets for post occupancy evaluation outcomes and other performance targets.
The project brief will become increasingly detailed throughout the project brief and concept design stages, and may ultimately include very specific information such as room data information for each room.
The project brief should be frozen at the end of the concept design stage and change control procedures introduced to prevent further changes without appropriate justification and authorisation.
[edit] How should information be presented in a project brief?
The project brief is likely to be presented as a report, or a series of reports (perhaps with separate detailed sections for schedules of accommodation and so on). This should be easy to understand, and may include diagrams to explain relationships between requirements, proximities of accommodation and so on.
However, where possible, detailed information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will make it easy to use to test whether design proposals that are prepared satisfy the requirements of the brief.
On projects that adopt building information modelling (BIM), the employer's information requirements (EIR) may be considered a parallel document to the project brief. Whereas, the project brief sets out the requirements for the physical built asset, the employers information requirements define the information the employer needs to procure to enable them to develop and operate the built asset.
For more information, see Employer's information requirements.
[edit] Related articles on Designing Buildings
- Briefing documents.
- Business case.
- Champions.
- Client requirements.
- Constraints.
- Employer's information requirements.
- Feasibility studies.
- Output-based specification.
- Preliminary business case.
- Project brief derogations.
- Project execution plan.
- Spatial requirements.
- Specification.
- Stakeholders.
- Statement of need.
- Strategic brief.
- User panels.
- Vision.
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Comments
To make a comment about this article, click 'Add a comment' above.
Separate your comments from any existing comments by inserting a horizontal line.
Getting the brief right is vital. Get it wrong and the project will never recover.
Great article.