Special characteristic
A special characteristic is a: ‘Product and process characteristics designated by the customer, including governmental regulatory and safety, and/or selected by the organisation through knowledge of the product and process.’ Ref Automotive Industry Action Group, Advanced product quality planning (APQP) and control plan reference manual, second edition, Southfield, MI: AIAG, 2008.
Special requirements are: ‘Those requirements identified by the customer or determined by the organization, which have high risks of not being achieved, thus requiring their inclusion in the risk management process; Factors used in the determination of special requirements include product or process complexity, past experience, and product or process maturity; Examples of special requirements include performance requirements imposed by the customer that are at the limit of the industry’s capability, or requirements determined by the organization to be at the limit of its technical or process capabilities.’ Ref Aerospace series - Requirements for advanced product quality planning and production part approval process, British Standards Institution, BS EN 9145, 2018.
[edit] Related articles on Designing Buildings Wiki
- Advanced product quality planning.
- Bill of quantities breakdown structures.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Plan, Do, Check, Act (PDCA).
- Poka-yoke.
- Product Breakdown Structure.
- Product design requirements.
- Product validation.
- Production readiness review.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Six Sigma.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.