Competitive tender
Competitive tendering is a common method of procurement in the construction industry.
A tender is a submission made by a prospective supplier/contractor in response to an invitation to tender. It makes an offer for the supply of goods or services.
Those tendering for a contract are often competing with others, and generally, none of the tenderers are aware of the quotes provided by each other; therefore, they are incentivised to submit their most competitive tender. In this way, it is believed that competition in procurement can add value for the client.
Competitive tendering became increasingly common in the UK in the 1980s, when it was seen as a way of making public organisations open themselves up to bids from a number of different firms. This was intended to increase transparency, drive down costs, and improve the efficiency of state-funded organisations such as central and local government departments.
However, it has been criticised for placing too much emphasis on cost, and not necessarily achieving best value for the client. Competitive tendering can be seen as a 'race to the bottom' and can lead to disputes later in the project as suppliers seek mechanisms to increase their price.
Methods of assessing tenders which consider criteria other than the lowest cost include:
- Best value.
- Auction theory.
- Most Economically Advantageous Tender (MEAT).
- Mean value.
- Exclusion of the extremes.
- Weighted selection criteria.
- Balanced scorecard.
For more information see: Tender evaluation, and Procurement route.
NB The UN Procurement Practitioner's Handbook, produced by the Interagency Procurement Working Group (IAPWG) in 2006 and updated in 2012, defines competitive bidding as: 'A procurement method in which offers from competing suppliers are invited by open advertisement and provided with the scope, specifications, and terms and conditions of the proposed contract as well as the criteria by which the offers will be evaluated. The objectives of competitive bidding are to obtain goods or services at the lowest cost or best value through open and fair competition.'
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Best value procurement.
- Bid evaluation.
- Bid strategies.
- Compliant bid.
- Form of tender.
- Insourcing.
- Most economically advantageous tender (MEAT).
- Non-compliant tender.
- Preferred tenderer.
- Proposals.
- Single-stage tender.
- Tender.
- Tender evaluation.
- Two-stage tender.
- Variant bid.
- Why the lowest price isn't sustainable.
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.