Compliant bids in the construction industry
A tender (or bid) is a submission made by a prospective supplier (such as a contractor) in response to an invitation to tender (ITT) from a client. It makes an offer for the supply of goods or services.
If a prospective contractor or supplier submits a tender which meets the client's stipulated requirements, (ie the mandatory elements of the Invitation to Tender (ITT) have been satisfied) then that bidder is said to have submitted a compliant bid.
Guidance to prospective bidders is usually clear about the requirements, in terms of precise information required, word length, presentation format, requirement for images, etc. Simply put, full compliance means all material conditions of a tender must be complied with and the price submitted should be based on the client’s tender specification documents.
If a tender is not compliant it may be rejected.
The precise content of a tender will vary considerably, depending on the procurement route, however it might include:
- A tender return slip, with details of the contract, including information such as return address and tender checklist;
- A completed tender pricing document (or contract sum analysis on design and build projects);
- Schedules of rates;
- An initial construction phase plan;
- Any design proposals or method statements that have been requested;
- Programme;
- Procedures to be adopted, such as procurement procedures and cost management procedures;
- Demonstration of capability, for example design capability, systems used etc;
- A BIM execution plan - if building information modelling is being used;
- Key project personnel, which may require submission of CVs;
- Management organisation;
- Plant and labour resources and availability;
- Prior experience, and
- References
However, some circumstances may allow a tender to be accepted even if it does not comply. A non-compliant proposal, sometimes referred to as a variant bid, may be submitted if the tenderer believes that an alternative could offer better value for money. However, non-compliant proposals should only be submitted if they have been requested or are explicitly permitted by the client, and they may need to be accompanied by a compliant bid.
[edit] Ways to create a compliant tender:
- Answer the question i.e. state what is required under each question;
- Answer all the question(s);
- Do not exceed the required word length;
- Do not supply information that is not required, e.g if a tender requires brief personal profiles, do not submit full CVs unless these are explicitly asked for;
- Do not leave sections blank;
- Submit in the correct format, e.g PDF, Excel, Word etc where required;
- Submit on time, and to the correct person;
- Ensure that proposals satisfy the client's requirements.
- Ensure works are packaged in the way the client requires.
- Visit the site, and if permitted, ask questions to avoid misunderstandings.
- Provide pricing information in the format and breakdown requested.
See also: Common mistakes in construction tenders.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Bidder.
- Bid writer.
- Competitive tender.
- Contract award.
- Contract conditions.
- Contract documents.
- Due diligence when selecting contractors or subcontractors.
- Invitation to tender.
- Letter of award.
- Mid-tender interview.
- Most Economically Advantageous Tender (MEAT).
- Pre-tender interview.
- Procurement route.
- Selection criteria.
- Tender documentation.
- Tender evaluation.
- Tender processes.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.