Certainty
Emissions Gap Report 2019 published by the UN Environment Programme defines uncertainty as: ‘A cognitive state of incomplete knowledge that can result from a lack of information or from disagreement about what is known or even knowable. It may have many types of sources, from imprecision in the data to ambiguously defined concepts or terminology, or uncertain projections of human behaviour. Uncertainty can therefore be represented by quantitative measures (for example a probability density function) or by qualitative statements (for example reflecting the judgement of a team of experts).’
Articles on Designing Buildings Wiki relating to types of uncertainty include:
Competence frameworks for the built environment – Core criteria for sustainability competence - Code of practice , Version 3, published by the Edge for the Construction Industry Council in February 2025 defines the following types of uncertainty:
- Deep uncertainty: A situation of deep uncertainty exists when experts or stakeholders do not know or cannot agree on: (1) appropriate conceptual models that describe relationships among key driving forces in a system; (2) the probability distributions used to represent uncertainty about key variables and parameters; and/or (3) how to weigh and value desirable alternative outcomes.
- Interpolation uncertainty: Uncertainty arising from a statistical or physical model-based interpolation of a field between available estimates to create a more spatio-temporally complete estimate.
- Sampling uncertainty: Uncertainty arising from incomplete or uneven availability of measurements in either space or time or both.
- Trend estimates uncertainty: Uncertainty arising from data fitting to a time-series with potential non-linear and autorogressive character.
NB Guide to developing the project business case, Better business cases: for better outcomes, published by HM Treasury in 2018, suggests that uncertainty: ‘Is unmeasured risk where known risks are not yet well enough understood to be estimated in terms of probability or impact and where not all risks may be identified and quantified.’
Anticipate, react, recover; Resilient infrastructure systems, published by the National Infrastructure Commission in May 2020, defines uncertainty as: ‘Limited and unknowable knowledge about future, past, or current events and conditions. Uncertainty includes natural variability (aleatory uncertainty), knowledge gaps (epistemic uncertainty), ambiguous meanings (semantic uncertainty), unknown unknowns (ontological uncertainty), and subjectivity.’
AR5 Climate Change 2014: Impacts, Adaptation, and Vulnerability, Glossary, published by the Intergovernmental Panel on Climate Change (IPCC) defines uncertainty as: ‘A state of incomplete knowledge that can result from a lack of information or from disagreement about what is known or even knowable. It may have many types of sources, from imprecision in the data to ambiguously defined concepts or terminology, or uncertain projections of human behavior. Uncertainty can therefore be represented by quantitative measures (e.g., a probability density function) or by qualitative statements (e.g., reflecting the judgment of a team of experts)’
Cost prediction, Professional Statement, 1st edition, published in November 2020 by the Royal Institution of Chartered Surveyors (RICS), defines uncertainty as: ‘A lack of complete certainty. In uncertainty, the outcome of any event is entirely unknown, and it cannot be measured or guessed; there is no background information on the event. Uncertainty is not an unknown risk.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.


















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.