Flood
The Flood and Water Management Act 2010 defines a flood as ‘…any case where land not normally covered by water becomes covered by water.’
Causes of flooding include:
- Heavy rainfall.
- A river overflowing or its banks being breached.
- A dam overflowing or being breached.
- Tidal waters.
- Groundwaters.
It does not include:
- A flood from any part of a sewerage system, unless wholly or partly caused by an increase in the volume of rainwater (including snow and other precipitation) entering or otherwise affecting the system.
- A flood caused by a burst water main (within the meaning given by section 219 of the Water Industry Act 1991).
Floods may have a harmful consequences on:
- Human health.
- The social and economic welfare of individuals and communities.
- Infrastructure.
- The environment (including cultural heritage).
[edit] Articles about flooding on Designing Buildings include:
- Active resistance measures.
- Amphibious construction.
- Applying flood resilience technologies GG 84.
- Aquifer.
- BRE flood resilient repair project.
- BREEAM Flood risk management.
- BREEAM Surface water run-off.
- Building flood resilience.
- Catchment flood management plan.
- Changing attitudes to property flood resilience in the UK.
- Coastal defences.
- Dam construction.
- Dyke.
- Elevated construction.
- Environment Agency.
- Fighting flooding in the 21st century.
- Flash flood.
- Flood and Water Management Act.
- Flood defences.
- Flood Insurance.
- Flood level.
- Flood mapping key to future development in Wales.
- Flood plain.
- FloodRe.
- Flood recoverability.
- Flood resilience.
- Flood resistance.
- Flood resilient house.
- Flood risk assessment.
- Flood risk.
- Flood Risk Framework.
- Flood risk management plan.
- Floodscape.
- Flood warning system.
- Floodwater.
- Flood zone.
- Future flood prevention.
- Future Water, The Government’s water strategy for England.
- Groundwater control in urban areas.
- Groundwater.
- Leeds flood defences.
- Levee.
- Natural flood management.
- Pitt Review Lessons learned from the 2007 floods.
- Planning for floods.
- Priorities for Wales during COVID-19 economic recovery.
- Property flood resilience.
- Pumps and dewatering equipment.
- Relief well.
- River engineering.
- Submersible bridge.
- Sustainable urban drainage systems.
- Temporary flood defences.
- Ten years on - Lessons from the Flood on building resilience.
- Types of flood.
- Thames barrier.
- Tsunami.
- Water engineering.
- Water table.
- Workplace design – flood protection.
[edit] External references
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.






















