Workplace design – flood protection
This article needs more work. To help develop this article click 'Edit this article' above.
The Herne Hill floods in August 2013 were a disaster for many homes and businesses.
As any residents and business owners who have been through it can testify, if you have ever received a phone call in the early hours telling you a burst water main has flooded your property, you will realise that is only the start of your problems. In a home your furniture etc. is ruined. In a business you can lose stock, books, materials – many of your assets – as well as power supplies and IT.
- Don’t think: it won’t happen to me: it could.
- Even if your premises are on top of a hill, a leak from a sprinkler system, a tank, pipe or a burst water main outside could still flood your basement/ground floor.
- Even if you are on an upper floor of a multi-storey building, the incoming power, phone lines, boards and IT may be located in the basement or on the ground floor and are quite likely to fail, affecting your business.
The loss adjusters and salvage teams will be quick enough to get your effects and equipment cleared out of the premises as it’s in their interests to minimise the consequential costs of claims. But the disruption caused to your business can be very serious financially.
Like fire, water main bursts and similar problems often seem to happen out of normal work hours. Visitors, trainees, other customers with appointments arriving the next day therefore may not be able to be contacted until they turn up and then have to be turned away. This is not good for customer relations.
So here is some advice based on experience:
- If your business premises include a basement or ground floor make sure that IT and power supplies are flood protected as much as possible.
- Do not locate IT equipment or any business-critical items in a basement if you can avoid it
- Install “bund wall” protection (at least 30cms high) around power or IT supplies that have to be positioned on the floor to reduce the risk of any flood water reaching them.
- Install step-over threshold barriers that will hold back water to doors to power supply rooms in basements.
- Install a plinth, ideally at least 30cms high in basement or ground floor areas wherever possible and place storage cabinets and other vulnerable items on top of the plinth.
- Keep high value or hard-to-replace items on shelving or in storage well above floor level or in the middle or higher drawers of cabinets, not in/on the bottom drawer/shelf;
- Have a disaster recovery / contingency plan in place to activate if a problem arises. Ensure it includes a plan for how to notify customers of any emergency. You may not be able to move to another site but you could back-up data to standalone memory / disks / servers or a data centre, have emergency supplies at off-site storage. Consider asking external trainees / customers to give you their mobile phone number “in case of emergency”;
- In the event of a flood, if at all possible, do not agree to close the file on damage claims with until at least 6 months have elapsed. Materials that have been in contact with water may deteriorate or rot well after the event.
It may never happen but, if it does, at least be prepared.
[edit] Related articles on Designing Buildings Wiki
- Flood.
- Flood and water management act.
- FloodSax.
- Flood resilient construction.
- Planning for floods.
- BRE flood resilient repair project.
- BREEAM Flood risk management.
- Building flood resilience.
- Changing attitudes to property flood resilience in the UK.
- Fighting flooding in the 21st century.
- Flood defences.
- Flood resilient house.
- Pitt Review Lessons learned from the 2007 floods.
- Planning for floods.
- Property flood resilience.
- Pumps and dewatering equipment.
- Temporary flood defences.
- Ten years on - Lessons from the Flood on building resilience.
- Thames barrier.
- Workplace design – flood protection.
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.