Cofferdams are temporary structures used where construction is being carried out in areas submerged in water. They are most commonly used to facilitate the construction or repair of dams, piers and bridges. The aim of a cofferdam is to be as watertight as possible to create a dry area in which to complete the required building works, or at least to limit water ingress to a safe level that can be pumped away.
Cofferdams must be able to withstand very high pressures and can create a hazardous situation if they are installed incorrectly. They are usually constructed using steel sheet piles driven into the ground and supported by internal braces and cross braces. Timber sheet piles, concrete or a combination of materials can also be used.
A cofferdam can be any shape. Its design will be depend on the depth required, the required working area, soil conditions, fluctuations in the water level, and so on.
[edit] Types of cofferdam
There are several different types of cofferdam. The most common are as follows:
[edit] Typical piled cofferdam
The construction sequence for a typical piled cofferdam is as follows:
- Pre-dredge the proposed area of the cofferdam.
- Drive temporary support piles into place.
- Install bracing frames to support piles.
- Drive sheet piles into place.
- Pump out water from the inside of the cofferdam.
- Progressively install internal bracing as required.
- Excavate ditch to allow leakage to run to one place.
- Place rock fill as a leveling and support course.
[edit] Earthen
This is a simple form of cofferdam suitable for areas of shallow water with low current velocity, where a sloped earthen embankment is built up around the area to be enclosed. The bank should be a combination of clay and sand or clay and gravel.
[edit] Rock-fill
If the water to be retained is not shallow enough for an earthen cofferdam, stone or rubble can be used instead. The stones are built up in the required shape of the cofferdam, and voids filled with earth, gravel or stone-chips.
[edit] Single-walled
This type of cofferdam is most suitable when the area to be enclosed is particularly small and the water is of a deeper level, roughly 4-6 m. Guide piles made of timber are driven into the ground and bracing constructed before sheet piles are driven into place and secured to the bracing using bolts.
[edit] Double-walled
Single-walled cofferdams become unfeasible as larger areas are required in deeper water, and so double-walled cofferdams are sometimes necessary. Two walls are built with a gap between them, the thickness of which is dependent upon the depth of water.
The general rule is for the thickness of the wall to equal the depth of water up to 3 m, greater depths require 3 m plus half the excess depth. The two wall faces are connected at the top using steel rods placed at close intervals.
[edit] Crib
This is commonly used in deep waters where the ground is particularly hard. The sheet piles are supported by a horizontal framework of timbers, known as cribs, which form pockets to be filled with earth or stones. This is constructed on land prior to being moved into position in the water. The crib is sunk into position, the internal space filled with stone or other material and timber or steel piles are then driven around the boundary of the crib.
[edit] Cellular
This type of cofferdam is most suitable for deep water areas, most commonly for during marine construction such as dams and wharves. Straight web steel sheet piles are driven into the ground to form a series of inter-connected cells of specific shapes which are filled with clay, sand or gravel to enable the structure to withstand the lateral forces of the water pressure. There are two common shapes:
- Circular type: Each cell acts as a self-supporting independent unit so each cell can be completely filled before construction of the next cell begins.
- Diaphragm type: Made from interconnected steel sheet piles using circular arcs at the inner and outer sides. The cells are then filled with coarse-grained soils, all at the same rate to avoid rupturing.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Bridge construction.
- Caisson.
- Coastal defences.
- Difference between cofferdams and caissons.
- Driven piles.
- Formwork.
- Geothermal pile foundations.
- Groundwater control in urban areas.
- Grouting in civil engineering.
- Micropiles.
- Pile foundations.
- Pumps and dewatering equipment.
- Retaining walls.
- River engineering.
- Screw piles.
- Sheet piles.
- Shoring.
- Temporary works.
- Trench box.
- Underpinning.
- Underwater foundations.
- Watercourse.
- Water engineering.
[edit] External references
- Deep excavation - Cofferdams
- The Construction Civil - Types of cofferdam
Featured articles and news
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.