D'Leedon, Singapore
Prior to her death in April 2016, Zaha Hadid's firm completed the D'Leedon complex in Singapore. The development comprises 7 residential towers, 12 semi-detached villas and integrated landscaping with recreation facilities.
Each of the seven towers taper inwards as they reach the ground to optimise public space with a unique petal-shaped layout which allows for windows on three sides of the apartments and cross-air flows to the living rooms and bedrooms as well as natural ventilation in all kitchens and bathrooms.
Zaha Hadid Architects designed d'Leedon as a high-rise residential development that provides highly-differentiated apartment layouts according to the specific needs of the residents.
The generative floor plan of the petal changes shape along the height of the tower in relation to the different configuration and type of residential units. The changing composition of unit type enables the towers to respond to a series of parameters dictated by site conditions, internal organisation and structural optimisation.
An innovative concrete shuttering systems was developed to allow the construction of columns at varying angles. The balconies and the bay windows were pre-cast on site and craned to position to be bonded to the structure as the tower was climbing.
Double curved concrete façade panels were prefabricated from GRC off site, and used as permanent moulds giving a very high level of exterior finish to a complex geometry. The concrete was simply finished with render and white paint, leaving the floor structural joints marked. This simple surface treatment highlights the mass while providing the required level of consistency and quality of finishes that a high-end residential development demands.
Environmental considerations and the location along the equator determined the orientation of the towers along the East-West axis in order to optimise solar gain. Sustainable features were introduced to allow generation and re-use of energy on site and to minimise its consumption. The development was awarded Gold+ from Singapore's Building and Construction Authority (BCA) Green Mark Scheme for its design approach.
Images courtesy of Hufton + Crow.
Content courtesy of Zaha Hadid Architects
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- 22 Bishopsgate.
- 600 Collins Street, Melbourne.
- Battersea Power Station.
- Development House, Shoreditch.
- Hertsmere House project.
- Kaplan North Masterplan Complex.
- Masaryk Railway Station regeneration.
- Millennium Mills.
- Mixed-use development.
- Nexus.
- One Hyde Park.
- Port House, Antwerp.
- Salerno Maritime Terminal.
- Tebrau Waterfront Residences.
- The Mile.
- US embassy hotel plans.
- Vista Tower, Chicago.
- Zaha Hadid.
Featured articles and news
Encourage individuals to take action to save water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
[[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DConstruction_contract_awards_down_1bn%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Construction contract awards down £1bn]]
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.