[edit] Ten percent base
Unlock what Biodiversity Net Gain (BNG) really means for your projects: the statutory essentials, a risk-proof delivery model, and how to turn the 10% minimum into nature-positive design.
BNG is now a statutory planning condition in England. Under Schedule 7A to the Town and Country Planning Act 1990, inserted by the Environment Act 2021, permissions are deemed subject to a biodiversity gain condition requiring a minimum 10% uplift measured with the statutory biodiversity metric. For major development, this has applied since 12 February 2024, and for small sites since 2 April 2024 (subject to limited exemptions and transitional provisions). Treat the 10% as your compliance floor, not your design ceiling.
[edit] What the planning authority will look for
Before starting works, you must have an approved Biodiversity Gain Plan showing: firstly, the measured baseline and post-development outcomes using the statutory metric; secondly, how you follow the mitigation hierarchy (avoid - minimise - compensate) in the design; and thirdly, how on-site 'significant enhancements' and any off-site units are secured and managed for at least 30 years. Off-site land must appear on the Biodiversity Gain Site Register and be locked in via s106 obligation or conservation covenant. Sequence legal drafting and registration early to avoid programme risk.
[edit] A repeatable delivery model (Work Stage-aligned)
- Stages 0-1 (Mobilise): Set ambition beyond 10% where feasible and align with local Nature Recovery priorities. Comission the ecological baseline; agree data standards for the metric and monitoring.
- Stage 2 (Concept): Masterplan around highest-value habitats and connectivity (hedgerows, dark corridors, green roofs/walls as stepping stones). Embed BNG targets in the brief, risk register, and outline cost plan.
- Stages 3-4 (Spatial/Technical): Produce the BNG Delivery Plan to include habitat drawings and schedules, soil and substrate specs, lighting controls, SuDS for biodiversity, phasing, and a 30-year management and monitoring plan. Integrate into specs, prelims and Employer’s Requirements so contractors' price the ecological intent. Reference BS 8683:2021 for process discipline.
- Stage 5 (Construction): Use ecological hold-points, site inductions and protection zones; maintain the auditable trail (photos, as-builts, planting certificates, lighting commissioning records).
- Stages 6-7 (Handover/Use): Activate the long-term management plan; set adaptive-management triggers linked to habitat condition scores.
[edit] How to professionalise at practice level
BNG is the project-level 'what'; pair it with organisational 'how' so outcomes scale. As highlighted in Martin Brown’s Regen Note (A Regenerative Imperative: Biodiversity, Net Gain, ISO & Biophilia), the emerging BS ISO 17298 (strategy: integrating biodiversity into governance, dependencies/impacts, and value chains) and BS ISO 17620 (process for designing and implementing BNG) create a complementary toolkit with BNG- project obligations + organisational standards, to drive consistent, auditable results. Use them to hard-wire roles (RACI), templates, KPIs, and supplier expectations into your QMS.
From compliance to regeneration. The profession’s opportunity is to treat 10% as a minimum and design for nature-positive outcomes but 20%, 50%, even 100%+, where context allows, prioritising connectivity, soil health, structural diversity, and long-term stewardship aligned to Nature Recovery Strategies. This is the 'regenerative imperative': bending the curve from loss to gain.
Make gains visible and valued. Biophilic design translates technical uplift into human experience, building user stewardship and lowering lifecycle risk. Shade, water, micro-topography, and species-appropriate lighting make the gains legible, loved and therefore maintained. Think of biophilia as the 'secret sauce' that keeps BNG working on the ground.
[edit] This week’s actions for ATs:
- Pre-screen live schemes for BNG applicability and exemptions.
- Lock a Stage-2 internal gateway for metric assumptions.
- Instruct legal on s106 or conservation covenant paths for any off-site units.
- Align construction information and contracts to the approved Gain Plan to avoid compliance drift.
Deliver the letter of the law, and the spirit of regeneration, with a process clients can trust and planning can approve, first time.
This article appears on the CIAT news and blogsite as "Biodiversity Net Gain: statutory must-haves, plus the delivery model that de-risks planning" dated 4 November, 2025 and was written by Sarah May FCIAT.
--CIAT
[edit] Related articles on Designing Buildings
- Biodiversity in building design and construction
- Biodiversity in the urban environment.
- Biodiversity Gain.
- Biodiversity gain plan.
- Biodiversity gain site.
- Biodiversity gain site register.
- Biodiversity net gain consultation.
- Biodiversity Net Gain; origins, updates and terminology.
- Biodiversity net gain regulations and implementation.
- Biodiversity offsetting.
- Biodiversity units.
- Biodiversity metric.
- Ecological impact assessment.
- Ecology.
- Environmental impact assessment.
- Habitat.
- Habitat management and monitoring plan HMMP.
- Local Nature Recovery Strategy LNRS.
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.